Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Proneness of competent over-stressed intact rock to violent fracturing

    By B L. Sainsbury, M F. Lee, A Penney

    For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo

    Nov 30, 2018

  • AUSIMM
    TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment Manufacture

    By J M. Shekiro

    In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most

    Oct 5, 2011

  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    Sorting the future? Possibilities at Obuasi Mine

    By V Chamberlain, M Appeah Owusu, M Aniawu-Asumakah, A Anyimadu, R Peattie

    This is an integrated geology and plant improvement study arising from the heterogeneity seen in mineralogy and gold association at the Obuasi goldmine in Ghana. This heterogeneity comes from the two

    Nov 10, 2020

  • AUSIMM
    Flotation Mechanism Design for Improved Metallurgical and Energy Performance

    By R Coleman

    The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.

    Aug 8, 2011

  • AUSIMM
    From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design Process

    The green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi

    Jan 1, 1998

  • AUSIMM
    Ausenco Carbon Reactivation Design Criteria

    By D Preedy, J K. Claflin, S R. J La Brooy

    This paper summarises the lessons learned during a recent carbon reactivation kiln upgrade project at the Sukari Gold Mine in Egypt. The kiln is being replaced to ensure that the plant achieves full v

    Sep 26, 2013

  • AUSIMM
    Mine Pit Slope Geotechnical Design

    Mine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri

    Jan 1, 2006

  • AUSIMM
    Roasting - A Study on Environmental Aspects, Off-Gas, Effluents and Residue Treatment

    By M Runkel, J Hammerschmidt, A Holmstr÷m, A Charitos, J Gnntner

    "Roasting of sulfide concentrates and refractory ores is an important process step in the production of metals and chemicals. Sulfides of iron, zinc, copper and other metals are oxidised with air betw

    Sep 26, 2013

  • AUSIMM
    Discovery Performance for Gold and Base Metals in the Pacific/South-East Asia – 2005–2014

    By R C. Schodde

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Over the last decade (2005–2014), a total of 439 significant deposits of gold and base meta

    Mar 18, 2015

  • AUSIMM
    Queensland Nickel - Value-Added Products from Technological Advances (c558ef59-3d56-447f-a7ad-fc4833bf589d)

    The Yabulu refinery of Queensland Nickel Pty Lld near Townsville now imports more than three million wet tonnes per year of nickel laterite ore from New Caledonia and Indonesia, making it the largest

    Jan 1, 1995

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    RISKGATE – Shared Coal Mining Knowledge for Managing Risks across Ground Management

    By P Bergin, J M. Galvin, J Harris, J Li, P Kirsch, M Shi, B Hebblewhite, B Whittaker, R Mitra, D Sprott

    Controlling unwanted ground movement is critical in mining as well as many other highly hazardous environments, such as construction and tunnelling. Sharing knowledge about effective hazard management

    Nov 5, 2014

  • AUSIMM
    Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)

    By Hoskings R

    Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ

    Jan 1, 1980

  • AUSIMM
    Technical Note - A Test and Comment on Taylor's Rule of Mine Life

    By Schaap W

    A test on Taylor's rule of mine life using published data on open pit porphyry copper mines confirmed that mine life is, on average proportional to the fourth root of reserve tonnage. Deviations

    Jan 1, 1984

  • AUSIMM
    Implementation of an Advanced Milling and Flotation Control System at Mopani Mufulira Copper Mine

    By B E. De Gee, N Viviers, A Naidoo

    In 2013 the Mopani Copper Mine Mufulira plant in Zambia embarked on a project that was aimed at improving concentrator recoveries. The project commenced with the automation of the milling and flotatio

    Sep 1, 2014

  • AUSIMM
    From Face to Surface – a Fragmentation Study

    By A Gustafson, D Johansson, K Jonsson

    The underground mining process, from in situ characteristics of the unmined rock mass to the final mill product with fully liberated minerals, consists of a chain of unit operations. Some of them infl

    May 9, 2016

  • AUSIMM
    Changing the Ground Support in Cemented Hydraulic Backfill at CSA Mine

    CSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the sto

    Nov 25, 2010

  • AUSIMM
    Design considerations for an iron tailings filtration plant and their conveying and disposal systems

    By C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez

    In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for

    Nov 8, 2021