Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)
    
    - Organization:
 - The Australasian Institute of Mining and Metallurgy
 - Pages:
 - 10
 - File Size:
 - 683 KB
 - Publication Date:
 - Jan 1, 1980
 
Abstract
Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made  in 1978 and the equipment was commissioned  in June, 1979. Equipment selection was made  after extensive investigation and visits to  existing facilities throughout the world.  The equipment selected is described and com- pared with the alternatives. Foundations  were designed to minimise clean up effort and  to ensure stability of equipment under design  wind loading without storm bays. Program- mable logic control enables the stacking and  reclaiming facility to provide a blended feed  to the coal preparation plant.
Citation
APA: (1980) Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)
MLA: Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3). The Australasian Institute of Mining and Metallurgy, 1980.