Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Instrumentation of a Graphite Zone in the #3 Shaft at Brunswick Mine

    The #3 Shaft at Brunswick Mine, Bathurst, New Brunswick, Canada, intersects a soft graphite zone just below the 3400 Level. Ground movement within this zone causes the concrete liner of the shaft to b

    May 1, 2009

  • CIM
    Concepts for Co-Mixing Waste Rock and Tailings

    Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.

    Nov 1, 2002

  • CIM
    Telerobotic experiments for mining (8fd4a26a-5d34-4ad8-b4a0-4ac70eca96ab)

    "The application of telerobotics to mining is currently being introduced into production systems around the world. Mining companies in Canada, Sweden, South Africa, and Australia have tended to lead t

    Jan 1, 2005

  • CIM
    The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint Venture

    By Roy Lindsay, Paul O'Hara, Gary Halverson

    "The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15

    Jan 1, 1996

  • CIM
    Advancing Asset Performance at the Montcalm Operation

    By Juan Anes, Dominic Fragomeni, Tim Edwards, Dave Scott, Simon Yu

    "The Montcalm concentrator operation was successfully commissioned in fall of 2004 at the Xstrata Copper’s Kidd Creek Metallurgical Site, Timmins. The start-up met or exceeded the Type 1 profile as de

    Jan 1, 2009

  • CIM
    Iron and steel making in the third millennium

    By J. P. Sancho, L. F. Verdeja, J. I. Verdeja

    "This paper analyzes the present state of the different processes competing to keep their market shares within the future iron and steel business sector.The continuous transformations in the steel mak

    Jan 1, 2002

  • CIM
    Developing Operation, Maintenance and Surveillance Manuals for Tailings and Water Management Facilities

    By Ian Bruce

    Tailings and water management facilities are essential and integral components of mine and mill operations. They must be managed for the long term in order to ensure that safe and environmentally resp

    May 1, 2002

  • CIM
    A Step back in time to Hand-Held Mining for Profitability

    By Mike Turner

    The Otter-Juan mine was closed by WMC Resources? Kambalda Nickel Operations (WMC-KNO) in 1999 due to the combined effects of low Nickel prices and high mining costs. GBF Mining Pty Ltd purchased Otter

    May 1, 2004

  • CIM
    An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba

    By Matthew Violot

    Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened

    Nov 1, 2011

  • CIM
    100 Years of Blowing Bubbles for Profit

    By Jan E. Nesset

    It is just over 100 years since the practice of blowing small bubbles into a mixture of ground ore and water revolutionized the mining industry, resulting in uneconomic deposits becoming highlyprofita

    Jan 1, 2009

  • CIM
    Comparison of the Material Properties of In situ and Laboratory Prepared Cemented Paste Backfill

    By Kim Le Roux

    Cemented paste backfill (CPB) is a relatively new material that is increasingly being used in open stope mining across the world. The advantages offered by this high density tailings backfill include:

    May 1, 2002

  • CIM
    Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls Operation

    By Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam

    "NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of

    Jan 1, 2006

  • CIM
    The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac Terrane (ef6c9811-507f-4964-b191-8a798691efa4)

    By T. A. Grammatikopoulos, B. Vasily, A. H. Clark

    "The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian

    Jan 1, 2003

  • CIM
    The Role of Applied Biotechnology in Decommissioning Mining Operations

    By Margarete Kalin

    "Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma

    Jan 1, 1998

  • CIM
    Calibration of On-Stream X-Ray Analyzers

    By Jim Lauder, Russ Calow, Ken Maley, Michael Ounpuu, Stuart T. Caverly

    "Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Concession Street, Lakefield, Ont

    Jan 1, 1996

  • CIM
    Switched Reluctance Drive: The Ideal Feeder Drive

    By Svato Prochazka

    Content: ? commonly used drive systems ? drive system efficiency ? introduction to SR technology ? SR drive system advantages Commonly Used Feeder Drives Technologies ? VFD + induction motor ?

    May 1, 2010

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Forecasting Potential Slope Failure in Open Pit Mines -Contingency Planning and Remediation

    By Nick D. Rose

    Outline ?Background ?History of inverse-velocity for failure prediction ?Methodolog ?Case Histories ?Three case examples of predicted slopefailure to actual date of occurrence ?One case example

    May 1, 2006

  • CIM
    New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)

    By R. S. Simkus, J. R. Egan

    "Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct

    Jan 1, 1994

  • CIM
    The Enviro-Clear Thickener, a New Concept in Clarification

    By P. D. R. Maltby

    "1. INTRODUCTIONMy talk today will discuss a new development in the thickening of slurries and clarification of waste water - the Enviro-Clear thickener. Several industrial installations of the thicke

    Jan 1, 1976