Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine
 
    
    - Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 21
- File Size:
- 1127 KB
- Publication Date:
- Oct 1, 2010
Abstract
Outline  Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining   Background   Purpose of the Studies   Methodology   Results and Analysis   Conclusions and Recommendations
Citation
APA: (2010) Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine
MLA: Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine. Canadian Institute of Mining, Metallurgy and Petroleum, 2010.
