Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Two-Stage Fluid Bed Reactor for Arsenic Removal and Fixation

    By K. Adham, C. T. Harris

    Arsenic is often associated with copper, nickel and gold in sulphide deposits. This paper describes a two-stage high-temperature fluid bed reactor for the removal and fixation of As from ores and conc

    Jan 1, 2014

  • CIM
    A New Paipote Process of Continuous Fire Refining of Copper

    By G. Riveros

    A new, continuous fire refining process for copper has been developed and tested at the 5 tph pilot scale. During oxidation, the blister copper flows through a packed bed of crushed refractory bricks

    Jan 1, 2007

  • CIM
    Interpreting Core Data and Rock Quality Information for Stope Design

    Stope performance and geotechnical information at Xstrata Zinc George Fisher Lead-Zinc-Silver mining operations have been analysed in detail since the beginning in October 2003. This work has been inc

    Apr 1, 2005

  • CIM
    An Intelligent System for Monitoring Tower Cranes on Construction Sites

    By M. A. Nadar

    Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi

    Aug 1, 2013

  • CIM
    Pyrite Dry Enrichment Using a Vibrated Fluidized Bed

    By China University of Mining and Technology, P. Zhang, C. Zhou, C. Duan

    "Recovering pyrite from the gangue with high sulfur content is of great significance for both economic development and environment protection in China. Due to the global water shortage and high cost i

    Jan 1, 2016

  • CIM
    Modeling of Anisotropic Behavior of Aluminum Profile for Damage Prediction

    By F. Andrieux

    "Extruded aluminum profiles are increasingly used for lightweight vehicle construction. Since fracture strains of aluminum profiles are relatively low, damage modeling is crucial for reliable crash si

    Jan 1, 2018

  • CIM
    Selected Methods for Shaft Lining Repairs in Polish Coal Mines

    Shafts are the most important workings in the underground mines. Their technical state to a large extent determines the safety and efficiency of mining operations. However, in many cases periodically

    Aug 1, 2013

  • CIM
    Development of Fail-Safety system for Building Wall Cleaning Robot

    By J. Huh

    Recently, there is growing trend to build the high-rise and install curtain walls. Following this trend, we developed robot for building wall cleaning work, which moves along Built-in guide rail of bu

    Aug 1, 2013

  • CIM
    Development of microprocessor-based system for mining and metallurgical applications

    By Stavros A. Argyropoulos, Radhakrishna Valiveti, Bernard Closset

    "The use of microprocessors in metallurgy is currently increasing at a very fast rate. A large number of companies are offering systems ""off the shelf"" which are aimed at the data acquisition and pr

    Jan 1, 1984

  • CIM
    Re-Thinking Underground Hard Rock Mining

    By Alex Henderson

    The underground hard rock mining industry has had little change since the mobile equipment era began in the 1970s. Equipment has become larger and faster but has not kept pace with the following chall

    May 1, 2011

  • CIM
    Degradation Behaviour of SPS Processed Neodymia Doped Cubic YSZ in Supercritical Water

    By L. Bichler, A. Siebert-Timmer

    In this research, novel YSZ ceramics doped with 5 mol% Nd2O3 were manufactured via Spark Plasma Sintering (SPS) process. The sintered Nd2O3-YSZ ceramics were subjected to a static supercritical water

    Jan 1, 2014

  • CIM
    An overview of wear-resistant alloys for the mining industry

    By J. B. C. Wu, B. McKee

    "Mining along with subsequent processing of the minerals often presents conditions where a wear- and/or corrosion-resistant alloy is needed to minimize downtime and maximize efficiency. This paper is

    Jan 1, 1997

  • CIM
    Process for the Complete Utilization of Oil Sands Fly Ash

    By T. H. Etsell, P. C. Holloway

    The fly ash produced by oil sands operations in northern Alberta represents a large, high-grade, potential resource for vanadium production in Canada. After extensive batch testing at the University o

    Jan 1, 2004

  • CIM
    Ion Exchange For Electrolyte Purification In Copper Electrowinning And Electrorefining

    Ion Exchange is finding a greater role in copper processing, and hydrometallurgy in general, both as a technique for removing impurities and as a means of adding value through the recovery of secondar

    Jan 1, 2007

  • CIM
    Selecting Effective Hydrogen Production and Delivery Optionis for Mining Applications

    By Kimberly M. Curran

    The path by which hydrogen supply is provided to any end use application will have a strong effect on the specific economics and price stability for the product supply and the flexibility with which i

    May 1, 2007

  • CIM
    Prognosis and maintenance management system for applications to aircraft engines

    By Raj Thamburaj, Li. Ping, Prakash C. Patnaik

    "An effective prognosis system for aircraft engines may involve the application of a wide range of technologies and methodologies, which may include: - On-line, real-time and in-situ non-destructive i

    Jan 1, 2004

  • CIM
    CIM Guidelines for the Reporting of Diamond Exploration Results (2003)

    "These guidelines, implemented in 2003, were recommended by the Diamond Exploration Best Practices Committee established by the Canadian Institute of Mining, Metallurgy and Petroleum. The guidelines a

    Jan 1, 2003

  • CIM
    Hydrometallurgical Process for Treating Copper Concentrates at Sumitomo Metal Mining

    By S. Asano

    Hydrometallurgical processes for treating copper sulfide concentrates have attracted considerable attention over thirty years and many processes have been developed. However there have been still prob

    Jan 1, 2007

  • CIM
    Designing for Closure And Beyond: The Perspective from Financial Institutions

    WHAT IF? ?Mine closure and reclamation liabilities were fully funded -at all times from current mine revenues ?Unexpected & catastrophic events were insured ?Remediation costs could be capped ?Ris

    May 1, 2006

  • CIM
    Recent electric furnace developments at Falconbridge (Sudbury Operations)

    By J. Chao, C. Tan, N. Stubina

    "Since J978, Falconbridge Limited has operated two electric furnaces at its nickel-copper smelter in Sudbury. As part of its S02 Abatement Program, the smelter has undergone many changes over the last

    Jan 1, 1994