Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Review of High Pressure Tuyere Injection

    By A. E. M. Warner, I. E. Hills, C. L. Harris

    Since the late Dr. Keith Brimacombe, et al, performed tests at the now-closed Asarco Tacoma smelter and the Inco Copper Cliff Smelter on Peirce-Smith copper converters almost thirty years ago, many Py

    Jan 1, 2007

  • CIM
    Implementing New Technologies in Metallurgical Processes: Building Plants that Work

    By B. Wasmund, B. Haneman, G. Sheehan

    Success in implementing new technology for metallurgical processes is not a foregone conclusion: This paper includes a survey of 23 new technology-based metallurgical plant start-ups, in which the aut

    Jan 1, 2011

  • CIM
    Operational Strategy at Chagres Smelter to Maximize Installed Capacity

    By R. Bonifaz, R. Subiabre

    The Chagres Smelter, part of the Anglo American plc group, situated 80 Km north of Santiago in Chile, completed a series of operational improvement in 2005 resulting in an optimum capacity in its oper

    Jan 1, 2007

  • CIM
    Overview of the Agrium Kapuskasing phosphate operation

    By R. Pressacco

    "IntroductionAgrium’s history in fertilizer production and marketing goes back to 1931. Today, Agrium Inc. is a world leader in the production, distribution, and marketing of fertilizers and related p

    Jan 1, 2001

  • CIM
    Mapping the Future of Occupational Health and Safety in the Nigerian Mining Sector

    By Iwueze Anaekperechi Rose

    The International Labor Organization has declared mandatory adequate provision of safe workplace and safety for all workers in all occupations including the mining sector. Early scientists like Agrico

    Aug 1, 2013

  • CIM
    Full Mapping Coherent Balances for Oil Sand Circuits

    By J. Kan

    In order to determine the recovery functions in an oil sand circuit it is necessary to have more than a minimal determination the mass flows in the network. This over-determination is essential in ord

    May 1, 2004

  • CIM
    Long Hole Blasting Practices in a Narrow Vein Deposit ? Experience from Agnico-Eagle?s Lapa Mine

    In most instances, the preferred mining methods in steeply dipping narrow vein deposits are selective methods such as cut and fill or shrinkage. The main advantage of these methods lies in the higher

    Aug 1, 2013

  • CIM
    Uranium Peroxide Precipitate Drying Temperature Relationships (44467d28-e101-4f4d-a6bb-f3d184ae0f5c)

    By B. Dyck, C. Rodgers

    ABSTRACT Cameco Corporation is revitalizing its Key Lake Operation uranium mill in northern Saskatchewan. The mill currently uses ammonia stripping in solvent extraction (SX) and ammonia yellowcake pr

    Jan 1, 2012

  • CIM
    The Use of Hydraulic Cyclones in a Middling Re-Grind Unit at Canadian Exploration Limited

    By H. A. Steane

    THIS BRIEF PAPER presents the information available on the use of Dorrclon?is in the middling re-grind unit at the lead-zinc mill of Canadian Exploration Limited. The plant throughput is 1,650 tons

    Jan 1, 1956

  • CIM
    Geology of the Caledon Outwash, Ontario

    By W. R. Cowan

    The Caledon Outwash is a large deposit of glaciofluvial gravel and sand located 55 km north west of down town Toronto. For the most part it was laid down in a meltwater channel fronting the Paris Mora

    Jan 1, 1984

  • CIM
    Influence of Surface Roughness on the Time-Scale of Three Phase Contact Formation by Bubble Colliding with Hydrophobic Solid

    By M. Krasowska

    Dynamics of collision and kinetics of the bubble attachment to hydrophobic solid plates (Teflon) of different surface roughness were investigated. The experiments were carried out in such a way that p

    Jan 1, 2006

  • CIM
    North Rim deposits Athabasca Basin

    By L. A. Homeniuk, R. J. McH. Clark

    "The Maurice Bay deposit, the Stewart Island showing, the Fond-du-Lac deposit, the Middle Lake showing and the Nisto deposit are located on the North Rim of the Athabasca Basin. They are probably unco

    Jan 1, 1986

  • CIM
    Experimental Study for Deoxidation of Liquid Copper with Substoichimetric O2/CH4 Flames

    The rate of liquid copper deoxidation during top blowing of reducing flames has been investigated using a high capacity thermogravimetric unit at 1200 °C. For 1 kg copper samples, it was observed that

    Jan 1, 2007

  • CIM
    Stope-and-Pillar Design for the Elliot Lake Uranium Mines

    By D. G. F. Hedley, F. Grant

    "In 1958, the Ontario Department of Mines appointed a committee to study the accident situation and mining methods used in the uranium mines in the E1liot Lake district. This committee reviewed the ex

    Jan 1, 1972

  • CIM
    Hydrotransportation System of Tailings Dam ?Benkovski 2? ? New Technological Solutions to Prolong the Operational Lifetime and Raise the Final Filling Contour of the Hydraulic Structure

    By S. K. Dimitrov

    ?Ellatzite Med? is one of the biggest mining companies in Bulgaria, processing about 12,000,000 t of ore per year. Waste materials left after extraction of copper concentrate are deposited in tailings

    Aug 1, 2013

  • CIM
    Flowsheet Development, Commissioning, and Start-Up of the Voisey’s Bay Mill (2943ae37-09c1-4777-81e1-21dde3685311)

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017

  • CIM
    Thermal Power for Alberta

    By J. A. Harle

    Introduction When considering power in Alberta, there automatically come to mind ideas of either hydro or thermal generation, leaving in one's thought an uncertainty as to which one would propos

    Jan 1, 1951

  • CIM
    Construction and Manufacture of Steel Wire Rope

    By G. C. Hodgson

    Specification and Tests of Rope Wire Chemical Analysis: The range in composition of steel used in the manufacture of wire rope is as follows: Carbon 0 4 to 0.9 per cent Manganese 0 4 to 0.8 Su

    Jan 1, 1931

  • CIM
    Experimental Research on Reduction of Granite Strength Induced by Microwave Irradiation

    By Jun Dai

    Based upon research findings from several countries, the combination of microwave and mechanical means to break hard rock holds promise for the future. To achieve this goal, it is essential to underst

    Aug 1, 2013

  • CIM
    Electric Load-Haul-Dump Machines: Real Alternative for Diesels?

    By J. Paraszczak

    ABSTRACT Diesel-powered loaders are a pillar of modern underground metal mining. As these mines are getting deeper and hotter and the emission regulations stricter, ventilation costs are soaring, affe

    Jan 1, 2013