Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin Flon

Canadian Institute of Mining, Metallurgy and Petroleum
J. M. Cooper
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
7
File Size:
465 KB
Publication Date:
Jan 1, 2007

Abstract

The HBMS reverb furnace in Flin Flon was originally designed in the late 1920s. Throughout the decades campaign life has been increased due to operational practices, technological changes and brick quality improvements. In recent decades the campaign life had been extended such that a complete rebuild was scheduled every 3 years. The latest furnace rebuild and start up has been after a campaign life of nearly 6 years. Brick construction methods and techniques along with furnace operational practices allow the present campaign to be double that of the historical campaign length.
Citation

APA: J. M. Cooper  (2007)  Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin Flon

MLA: J. M. Cooper Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin Flon. Canadian Institute of Mining, Metallurgy and Petroleum, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account