Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin Flon

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 7
- File Size:
- 465 KB
- Publication Date:
- Jan 1, 2007
Abstract
The HBMS reverb furnace in Flin Flon was originally designed in the late 1920s. Throughout the decades campaign life has been increased due to operational practices, technological changes and brick quality improvements. In recent decades the campaign life had been extended such that a complete rebuild was scheduled every 3 years. The latest furnace rebuild and start up has been after a campaign life of nearly 6 years. Brick construction methods and techniques along with furnace operational practices allow the present campaign to be double that of the historical campaign length.
Citation
APA:
(2007) Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin FlonMLA: Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin Flon. Canadian Institute of Mining, Metallurgy and Petroleum, 2007.