Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree MineBy D Reddy Chinnasane
Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations
Oct 1, 2010
-
From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona MillBy Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux
"The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur
Jan 1, 2013
-
Real Time Performance Management in Metallurgical OperationsBy O. A. Bascur, J. Patrick. Kennedy
"The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic
Jan 1, 2004
-
Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic MethodBy Robert E. McIvor
"The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe
Jan 1, 2011
-
Numerical Modeling of Standard Rock Mechanics Laboratory Tests using a Finite/Discrete Element ApproachBy S. Stefanizzi
In the present paper, numerical simulations based on a finite/discrete element approach are used to study deformation and failure process during standard rock mechanics. FEM/DEM modeling has been used
May 1, 2009
-
Pilot-Scale Frother Testing at Highland Valley CopperBy S. D. D. Welsby
"A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over
Jan 1, 2014
-
The Economics of the Carbon in Pulp Treatment of Low Grade Flotation Tailings: A Pilot StudyBy R. H. O. Wagner
"This paper describes the bench testing, pilot plant studies of alternative flowsheets, to determine the feasibility of gold recovery, by carbon in pulp extraction, in the Schumacher Mill gold flotati
Jan 1, 1984
-
An agent-based framework for open pit mine planningBy K. Awuah-Offei
Long-term production scheduling optimization has been a challenging issue for the mining industry because of the size and complexity of the problem. The current planning algorithms have limitations in
Jan 1, 2008
-
Ready or Not?Here They ComeBy Stephen Hammond
?Our own prejudices form the greatest barrier to creating an inclusive working environment.? Have you witnessed? Racism or Negative Comments about an Aboriginal Person? ?You are free to compete wi
May 1, 2008
-
Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air PurificationBy Hiroaki Sakurai
Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p
Oct 1, 2003
-
Bench and Pilot Scale Test Programs to Specify Autogenous Grinding CircuitsBy C. J. Farrow, M. J. Smith
"Bechtel has managed a number of test programs to establish autogenous grinding circuits and size mills for a variety of ores.This paper outlines the procedures whereby bench scale and pilot plant tes
Jan 1, 1982
-
Potash Processing - A ReviewBy A. F. Banks
"The last time I spoke to you the potash industry was at a low point. Markets were bad and the industry depressed. Many people had left and there was very little being done in terms of development. Th
Jan 1, 1982
-
The Effect of Lump Ablation on Pressure Gradient in Oil Sand Hydrotransport PipelinesBy D. Wolfe, K. Reid, T. Nunn
"The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. In order to minimize front-end rejects, and to allow for high throug
Jan 1, 2014
-
Acid mine drainage prevention and control optionsBy N. Kuyucak
"Acid mine drainage (AMD) is one of the most significant environmental challenges facing the mining industry worldwide. It occurs as a result of natural oxidation of sulphide minerals contained in min
Jan 1, 2002
-
The Abatement of Acid Mine Drainage in OntarioBy John R. Hawley
"This paper is intended as a review of the progress that has been made in the Province of Ontario in the field of acid drainage waste treatment technology.Three years ago, at the Third Annual Meeting
Jan 1, 1974
-
Large Flotation Machine Development and OperationBy M. Churchill, V. R. Degner
"Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi
Jan 1, 1982
-
Hydraulic Hoisting & Long Distance Pumping of CoalBy R. E. McElvain
"Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.
Jan 1, 1978
-
On The Floatability of Gold GrainsBy Stephen L. Chryssoulis, Daniela Venter, Stamen Dimov
"Comparative surface analysis of floated and rejected free gold grains from a number of full scale benefication plants and from pilot plant testwork, has shown silver (the most common impurity in gold
Jan 1, 2003
-
The Behaviour of Gold in Hemlo Mines Ltd. Grinding Circuit (aa6f7398-0561-40ff-b0b4-243c3a8474e3)By S. Banisi, J. Marois, A. R. Laplante
"This paper compares the behaviour of gold and ore in the grinding circuit of Hemlo Gold Ltd. Particular attention is given to grinding kinetics, classification behaviour, and liberation. For grinding
Jan 1, 1991
-
A Plant-Wide Control System for Flotation Level ControlBy D. G. Hulbert, J. H. Schubert, R. G. D. Henning
"Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever
Jan 1, 1995