Search Documents

  • SAIMM
    Reply To F. Essrich ?Quantitative Rockburst Hazard Assessment At Elandsrand Gold Mine? - In The Journal Of SAIMM, Vol. 97. No. 7. Pp. 319?324

    By J. F. Curtis

    In the synopsis, the author concludes that ?high levels of seismicity do not coincide with high rockburst rates?. Implicit to an appreciation of this statement is the necessity of a common understand

    Jan 1, 1999

  • AUSIMM
    Modelling Fines in Blast Fragmentation and its Impact on Crushing and Grinding

    By W Valery, S Morrell

    In the mining industry blasts are usually designed to fracture the in situ rock mass and prepare it for excavation and subsequent transport. The run of mine (ROM) fragmentation is considered good when

    Jan 1, 1999

  • SAIMM
    The application of “Optimine” to evaluate risks associated with extraction of a remnant pillar at depth

    By S. K. Murphy, K. B. Le Bron, A. K. Ward, S. Hayes, T. Rangasamy

    A process for evaluating different options for extraction of mining blocks is presented. The process is described and an example of the application of the process to a case study is presented.

    Jan 1, 2003

  • SME
    Geological Parameters Affecting Open Hard-Rock Tunnel Boring Machine Performance

    By Taehong Kim

    An accurate and reliable prediction of Tunnel Boring Machine (TBM) performances, in terms of Rate of Penetration (ROP), utilization (U), and cutter wear rate, is a critical element in the successful p

    Jan 1, 2008

  • AUSIMM
    Adsorption Effect on Multi-Heavy Metal Ions in Wastewater by Water-Washing Waste Saccharomyces cerevisiae

    Adsorption Effect on Multi-Heavy Metal Ions in Wastewater by Water-Washing Waste Saccharomyces cerevisiae

    Sep 13, 2010

  • SME
    Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74

    By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy

    This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660

    Feb 24, 1997

  • AIME
    Resources And Utilization Of North Carolina Pyrophyllite

    By Jasper L. Stuckey

    PYROPHYLLITE, first identified as soapstone,1 later as agalmatolite,2 and finally as pyrophyllite,3 has been known to occur in North Carolina for more than 130 years and has been produced intermittent

    Jan 1, 1958

  • SAIMM
    Comment On S. Sarac And C. Sensogut?s Paper: A Statistical Determination Of Methane Emission From Coalbeds - Case Study - SAIMM Journal, 103, No. 3. 2003. Pp. 209?211

    By P. J. D. Lloyd

    At first I read this paper with interest, which grew to fascination, and ended up with horror. Such reactions to a supposedly scientific contribution are rare, and I believe the coal mining community

    Jan 1, 2004

  • CIM
    Process Mineralogy of Sudbury Platinum Group Minerals as Determined by Mineral Liberation Analyzer

    By Manqiu Xu, Andrew Lee, Frederick D. Ford, Cara Wercholaz

    "Platinum-group minerals (PGM) typically occur in such low concentrations that quantitative mineralogical evaluation is difficult or impossible. The FEI MLA system used by Vale Base Metals Technology

    Jan 1, 2011

  • DFI
    Evaluating Excavation Support Systems To Protect Adjacent Structures (The 2010 Michael W. O?Neill Lecture)

    By Richard J. Finno

    This paper presents an overview of methods that can be used to predict damage to buildings as a result of excavation-induced ground movements and describes an adaptive management approach for predicti

    Jan 1, 2010

  • DFI
    Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure

    By Damian R. Siebert

    Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation

    Jan 1, 2011

  • DFI
    Piled Foundation Design as Reflected In Codes and Standards

    By Bengt H. Fellenius

    "ABSTRACTAn example from a guidelines document for the Eurocode is discussed that addresses design for geotechnical strength of piled foundations in settling soil, generating drag force and downdrag.

    Jan 1, 2014

  • NIOSH
    Coal Mine Safety Achievements In The USA And The Contribution Of NIOSH Research

    By R. G. Gürtunca

    Over the past century coal miner safety and health has seen tremendous improvements, the fatality and injury rates continue to decrease while productivity continues to increase. Many of the hazards th

  • ISEE
    Journal: 100 Years / “The Mine” by the Rev. Isaac Taylor New York, W.B. Gilley 1829 Boring

    By Roland Oliver

    Detonators or blasting caps are made in several different grades of strength, because some powders require not only a greater, but a different initial detonation than others to convey their maximum en

    Jan 1, 2007

  • CIM
    Aeration in Plant Practice

    By K. V. Konigsmann

    "The results of Mr. Klymowsky's research confirm the essential role played by oxidation products in the flotation of base metal sulphides. They invite a discussion on the subject of aeration which I m

    Jan 1, 1973

  • ISEE
    Bottom Hole Annular Pressure: A Theoretical Problem with Real Effects

    By Clarence R. Zink

    A problem has always existed in deep and fast drilling situations such as coal overburden drilling, or when drilling with a tight annulus, such as 9 7/8" bits and 8 5/8" pipe. This problem is the diff

    Jan 1, 1998

  • SAIMM
    Flotation Stabilization And Optimization

    By A. Singh

    The control of flotation plants is by no means trivial. Flotation is one of the most interactive minerals? processing operations. The interactive nature of flotation circuits results in oscillations o

    Jan 1, 2003

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • AUSIMM
    The Flotation of Alluvial Gold

    By S G. Keyte

    Gravity methods of recovering alluvial gold are not very efficient at particle sizes below about 0.l mm. Whereas such gold may not have been economic to recover in the past, the same may not be true t

    Jan 1, 1990

  • SAIMM
    Survey And Geotechnical Slope Monitoring Considerations

    By F. T. Cawood

    Monitoring of the slopes of surface mines can prevent loss of life, loss of equipment, loss of production and possibly the loss of the mine. The effectiveness of such monitoring depends on the extent

    Jan 1, 2006