Optimization and Increasing Throughput at Jacobina

Canadian Institute of Mining, Metallurgy and Petroleum
Alexandra Kozak Bob Fukuhara Rodrigo Costa
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
19
File Size:
464 KB
Publication Date:
Jan 1, 2008

Abstract

"The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The project included an evaluation of the existing circuit and addressed bottlenecks in the crushing, milling, sedimentation, leaching and tailings transport. These circuits and the methodology used to provide higher capacity will be presented.INTRODUCTIONThe Jacobina mine is located in the state of Bahia in northeastern Brazil approximately 330 km northwest of the state capital city of Salvador and 9 km from the town of Jacobina. The Jacobina Mine (Figure 1) is owned by Jacobina Mineração e Comércio, a wholly owned subsidiary of Yamana Gold Inc.The gold mineralization of the Jacobina mine is hosted within quartz pebble conglomerate reefs of the Serra do Córrego Formation which together with the Rio do Ouro Formation forms the Serra do Jacobina mountain chain.The Serra do Jacobina mountains have been mined for gold since the late 17th century. Since the 1970’s, the Jacobina mine has been operated by Anglo American, Williams Resources Inc., Desert Sun Mining Inc. The mine is currently owned by Yamana Gold Inc.In December of 1998, operations at Jacobina were suspended and the property was placed under care and maintenance. Desert Sun Mining Inc. began exploring the property in 2002 and eventually purchased the Jacobina mine in 2003. In 2003, a feasibility study was completed that evaluated the economics of re-developing the mining operations and expanding gold production. In 2004, refurbishment and re-development of the mining operations began and the milling facility throughput capacity was expanded from 1.08 to 1.512 Mtpy (3,000 to 4,200 tpd). The milling operations were commissioned in the 1st quarter of 2005 and commercial production was declared 1 July 2005. In April 2006, Yamana Gold Inc. acquired the Jacobina mine through its acquisition of Desert Sun Mining Inc."
Citation

APA: Alexandra Kozak Bob Fukuhara Rodrigo Costa  (2008)  Optimization and Increasing Throughput at Jacobina

MLA: Alexandra Kozak Bob Fukuhara Rodrigo Costa Optimization and Increasing Throughput at Jacobina. Canadian Institute of Mining, Metallurgy and Petroleum, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account