Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Marked Ball Wear Testing

    By G. D. West, J. D. Purdue

    "Marked Ball Wear Testing (MBWT) employs identified grinding balls which are placed in an operating mill for a period of time, retrieved from the mill, and then measured to determine the amount of wea

    Jan 1, 1991

  • CIM
    Distributed Digital Control of a Flotation and Grinking Circuit at the Kidd Creek Concentrator

    By O. Matwijenko

    "The Kidd Creek concentrator is located twenty-six kilometres east of Timmins, Ontario, within a metallurgical complex including a 109,000 MTPY zinc plant and a new 59,000 MTPY copper smelter and refi

    Jan 1, 1980

  • CIM
    Microcel Column Flotation Scale-Up and Plant Practice

    By Roe-Hoan Yoon

    "Industrial flotation columns often suffer from low recoveries and high maintenance requirements because of poorly-designed air spargers. The MicrocelTM bubble generators were developed at Virginia Te

    Jan 1, 1994

  • CIM
    Evaluation of shotcrete rock support systems in underground mines by a new non-intrusive technique (33890d65-d377-415a-af90-fb1c64a61d2e)

    By F. Hassani, D. O’Donnell, M. Momayez, P. Guevremont

    Shotcrete is a practical and economical support system in many Canadian underground mines. Although shotcrete technology has gained acceptance in the mining industry, there are some problems that have

    Jan 1, 2002

  • CIM
    Analyse Des Écoulements De L?eau En Conditions Non Saturées Dans Les Haldes À Stériles

    By Michel Aubertin

    Les haldes à stériles contenant des minéraux sulfureux réactifs constituent un milieu favorable à la production du drainage minier acide (DMA). Au sein de ces haldes, les processus physiques, géochimi

    Nov 1, 2002

  • CIM
    Collaborative/Syndicated Research in Mineral Processing

    By Terry Braden

    "Meeting probable world mineral demand in the years ahead will almost certainly require an ability to economically treat lower grade and more complex ores. Achieving this will require extensive resear

    Jan 1, 2009

  • CIM
    Flotation as Part of Grinding Classification Circuits

    By M. Tarvainen, J. Kallioinen

    "Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r

    Jan 1, 1984

  • CIM
    ARD Treatment for Selective Metal Recovery and Environmental Control using Biological Reduction Technology – Commercial Case Studies

    By Brad Marchant, Rick Lawrence, David Kratochvil

    "BioteQ has successfully developed commercial operations for ARD treatment and selective metal recovery using the patented BioSulphide and Thiopaq® biological reduction technologies. The BioSulphide-T

    Jan 1, 2003

  • CIM
    Precision and Bias For Settlements

    By Jan W. Merks

    "The settlements between mines and smelters are based on the mass of metal contained in concentrate lots. The mass of contained metal is a function of the wet mass of a lot, and its moisture content a

    Jan 1, 1995

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • CIM
    Filtering and Shipping Concentrates at Britannia

    By E. R. Packer

    "The mill of Anaconda Britannia Mines is located on the eastern shore of Howe Sound, approximately 32 miles north of Vancouver, British Columbia. The mill has a daily capacity of 3400 to 3500 tons and

    Jan 1, 1972

  • CIM
    Using Rock Physics for Constructing Synthetic Sonic Logs

    By I. O. Ojala

    Detailed knowledge of velocity-depth trends is essential for constructing well-to seismic ties, determining background velocity and generating synthetic seismic traces for interpreting seismic amplitu

    May 1, 2009

  • CIM
    The Enviro-Clear Thickener, a New Concept in Clarification

    By P. D. R. Maltby

    "1. INTRODUCTIONMy talk today will discuss a new development in the thickening of slurries and clarification of waste water - the Enviro-Clear thickener. Several industrial installations of the thicke

    Jan 1, 1976

  • CIM
    Limitations of Safety Arrest Mechanisms for Mine Shaft Conveyances

    By Gorzalczynski. Stan

    The recent trend in underground mine developments is ?big is better?. This is most certainly evident in the mine shaft and the conveyances that operate within its compartments. Today, there are severa

    May 1, 2002

  • CIM
    Cone Crusher Operaitonal Variables

    By A. J. Magerowski

    Energy consumption is a main component of operational costs for the comminution of mineral bearing ores. Reduction of energy consumption has continually been addressed by mill operators and equipment

    Jan 1, 1986

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    Design & Development of the Barmac Rotopactor

    By Bryan A. Bartley

    "Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla

    Jan 1, 1985

  • CIM
    The Red Dog Mine

    By W. R. Hargrave

    "Mining OperationsOre will be mined by open pit techniques. Because of the high grade of the deposit and the low strip ratio, mining rates are small relative to most other open pit operations.The ore

    Jan 1, 1989

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    Guyana Goldfields Flagship Aurora Project – Road to Success

    By Jon Errey, Aleksandar Petrovic, Karl Haase

    "Developing a gold deposit of this magnitude in the Amazonian jungle of Guyana posed many challenges. This paper describes not only the process & logistical challenges arising from the remote mine sit

    Jan 1, 2016