Interpretation of Field Stresses and Deformation Moduli from Extensometer Measurements in Rock TunnelsBy Redman P. G, McMahon B. K
A simple technique for evaluating the field stress ratio is presented, based on the results of extensometer or convergence tape measure- ments taken in an advancing tunnel. This tech- nique also yie
Jan 1, 1981
-
Preparation of Mine Fill and Disposal of Residue at Zinc Corporation New Broken Hill Consolidated, Broken HillBy Johns AS
Comissioning of a new residue disposal tcluding upgraded classification for none backfill preparation, new variable speed pumps and a new residue dam took place in 1¦76. The system is described.
Jan 1, 1978
-
Facing up to Deviant BlastholesBy Paley N, Cameron A, Townson P
Although blasthole deviation is a problem which can seriously affect blasting operations, there is little practical emphasis on controlling this deviation and no practical emphasis on understanding it
Jan 1, 1992
-
Sir Henry Ayers, First President of the Institute, and the Burra Burra MinesThe occurrence of metallic minerals in Australia to the time of the proclamation of South Australia as a Colony in 1836 was unknown. It is, therefore, perhaps, surprising that British settlers arrivin
Jan 1, 1993
-
Testing the Design of a Mine Winder Control System Using Simulation TechniquesThe control system of a mine winder or other variable speed drive has many component parts that must work together to provide the required functional performance of the machine, together with comprehe
Jan 1, 2005
-
Rock Bolt TestingRock bolting provides a supplement or alternative to conventional timber and steel supports. The tensile strength of the bolts lies within a range established by manufacturing quality control. Rock
Jan 1, 1971
-
The Direct Filling of 1100 Orebody Stopes from Surface at Isa MineIn early-1989, subsidence due to voids at the top of previously filled stopes and stopes awaiting filling,began to threaten the 15 level fill conveyor horizon. This together with the need to maintain
Jan 1, 1992
-
Studies on Extraction of Refractory Gold and Silver Through Thiourea LeachingBy Akerkar D. D, Dey M. L, Mathur S. B, Chowdhury S. K R
The extraction of gold and silver from chalcopyrite concentrates has been investigated. In view of the recent interest in non-cyanide leachants for gold and silver, one such alternative reagent, nam
Jan 1, 1992
-
Geology and Resource Estimation at the Panguna Porphry Copper/Gold Mine Papua New GuineaDaily geological mapping of the Panguna porphyry copper/gold system since mining began in 1971 has provided a good basis for resource estimation and mine planning as the mine and estimation methods
Jan 1, 1987
-
Current Capabilities for Finite Element Analysis of Geomechanics and Structural Support Systems in Underground MiningBy Ho D, Yang J
The ready availability of powerful desktop workstations, which combine 3D real-time graphics and processing speed better than that of supercomputers of a few years ago, now allows the cost-effectiv
Jan 1, 1995
-
Borehole Instrumentation for Groundwater Investigations in Underground and Surface Coal Mine EnvironmentsBy Crellin D, Reed SM
The paper presents details of borehole instrumentation schemes for the purposes of monitoring rock and fill deformations associated with groundwater in underground and surface coal mines. The instru
Jan 1, 1988
-
Some Consideration on Tunnel Excavation Methods in Mudstone StrataBy Yagi Y
The double track railway tunnel, called the Second Shirasaka Tunnel is being constructed under the supervision of Japanese PTational Rail- ways (JNR) in the tertiary soft rock strata in order to spe
Jan 1, 1987
-
Managing Technical Risk at the Ridgeway Sublevel Caving MineBy G Power
The successful implementation of sublevel caving (SLC) at Ridgeway Gold Mine (Ridgeway) requires the technical aspects of caving and flow behaviour to be understood. Cave propagation must be controlle
Jan 1, 2003
-
Computational and Experimental Investigation of Spiral Concentrator FlowsBy Golab K, Partridge AC, Fletcher CAJ, Holtham P
Spiral concentrators are used globally in the fine coal processing industry to segregate particles, by gravitation, on the basis of density and size. Consisting of an open trough that twists verticall
Jan 1, 1998
-
Stripping Operations Using Belt Conveyor SystemsAs near surface deposits are increasingly mined out and pit widths beginto exceed the reach of practical direct-casting stripping machines, high haulage costs can make truck-shovel pre-stripping opera
Jan 1, 1985
-
Analysis of Haul Truck Tyre Costs in a Multiple Pit Surface coal MineBy Cox LT
A short term tyre study of trucks operating in a multiple pit surface coal mine showed significant potential for cost savings. The tyre study, conducted on-site over a three months period covered a
Jan 1, 1982
-
The Mufultra SandplantBy Russell F. M
Following the accident in the Peterson section of Mufulira mine in September, 1970, a method had to be found of extracting up to 300 000 tonnes of ore per month from this area without inducing cavin
Jan 1, 1973
-
Evolution of Mining and Current Practices in the Prince Lyell Orebody, Mount Lyell Mining and Railway Company LimitedBy Kennewell G. J
This paper aims to present the evolution of the mining method in the Prince Lyell orebody. Initial strategy and practical experience are detailed as are the reasons for and benefits of changes to the
Jan 1, 1992
-
Application of Artificial Intelligence to Real Option Project Valuation and Mine OptimisationThis paper describes preliminary research on the application of Markov Decision Processes (MDP) to Real Option Valuation (ROV) and the optimisation of mine scheduling. The MDP framework is a novel app
Jan 1, 2007
-
SXHD Crusher Developments at the Copper Concentrator, Mount Isa LimitedBy Molloy GR, Eaton RA
The crusher development programme for 7ft Super Extra Heavy Duty (SXHD) Symons cone crushers commenced in 1984. The main objective of the programme was to run the crushers at maxi- mum power for the