The Mufultra Sandplant
 
    
    - Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 9
- File Size:
- 719 KB
- Publication Date:
- Jan 1, 1973
Abstract
Following the accident in the Peterson section of Mufulira mine in September, 1970, a  method had to be found of extracting up to 300 000 tonnes of ore per month from this area  without inducing caving. Sandfill mining  methods were chosen, necessitating a plant  capable of producing both cemented and  uncemented fill on a large scale. The paper  covers the design and construction of this  sandplant which is thought to be unique for  its size, as it incorporates three 3 000 tonne  capacity settled storage silos, a 500 tonne  capacity cement silo, mixing tanks and a  control room situated underground. The plant is designed to handle an aver- age of 440 tonnes per hour with a maximum of  660 tonnes per hour for limited periods,  delivering either uncemented fill or cemented  fill in proportions varying from 1:6 to 1:30. The instrumentation and equipment  necessary to give one man operation of the  plant is described and the fill mining methods  now in use at Mufulira are briefly outlined.
Citation
APA: (1973) The Mufultra Sandplant
MLA: The Mufultra Sandplant. The Australasian Institute of Mining and Metallurgy, 1973.