Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Availability and Reliability of Siemens’ Gearless Drives (1f6ae043-857f-4a1d-a432-9fc8b3cbe926)

    By Todd Kennedy, Kurt Tischler

    "This paper presents the field experience of Siemens with regard to Gearless Drives in the mining industry … We consider the elapsed production hours of Siemens Gearless Drives to be extensive enough

    Jan 1, 2012

  • CIM
    Availability of Bank Debt Financing to the Mining Sector

    ?Bank Lending to the Mining Sector affected by 2 broad factors since Mid 2008: 1. Economic Downturn (?the Real Economy?) for mining companies directly reflected in lower metal prices (current and for

    May 1, 2009

  • CIM
    Availability of Steelmaking Slag as a Nutrient Source for Marine Phytoplankton Growth, with Special Reference to Its Combined Use with Urban Sewage

    By Y. Masuda, Y. Nakamura, K. Haraguchi, A. Taniguchi, K. Arita

    Availability of the elements originating from steelmaking slag for various marine phytoplankters including purely cultured strains and natural populations was tested in land and shipboard laboratories

    Jan 1, 2004

  • CIM
    Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)

    "The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to

    Jan 1, 2007

  • CIM
    Avoiding Costly Mistakes: How past Experience can Help Prevent Serious Damage to Metallurgical Equipment

    By S. Beskri, N. Geoffroy

    When metallurgical plants are designed, a lot of consideration is almost always given to material selection and possible damage mechanisms. Materials engineers are generally involved and will strive t

    Jan 1, 2015

  • CIM
    AZ31B Slab by Horizontal Continuous Casting Method

    By K. Tada

    A surface of a magnesium slab (hereinafter, referred to as Mg slab) or magnesium alloy slab (hereinafter, referred to as Mg alloy slab) becomes black with the use of conventional manufacturing methods

    Jan 1, 2006

  • CIM
    B.P. Selco - Hope Brook Project Pilot Heap Leach Program

    By W. J. Witte, M. K. Witte

    "INTRODUCTION A pilot heap leach project was conducted on the B. P. Selco Hope Brook ore located in southwestern Newfoundland. The pilot heap leach was undertaken to assess and confirm the following:1

    Jan 1, 1987

  • CIM
    Back Analysis of the West Wall Slope Failure at Lab Chrysotile Mine

    By Philippe Caudal

    This paper presents a case study in which a slope failure was observed on the west wall of the LAB Chrysotile mine in the vicinity of the main ramp in January 2010. Airborne LiDAR results were used to

    Aug 1, 2013

  • CIM
    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004

  • CIM
    Back To Basics - The Road to Recovery: Milling Practice at Brunswick Mining

    By R. J. Grant, D. W. Scott, M. A. Cooper, E. R. Shannon

    "The Brunswick No.12 site concentrator processes 10,500 tonnes per day of a complex lead, zinc, copper and silver ore producing four concentrates by differential flotation. Research over the years has

    Jan 1, 1993

  • CIM
    Back to basics: the feasibility study

    By C. R. Lattanzi, M. J. Davie, L. D. Smith, J. R. Goode

    "The feasibility study determines the technical and economic viability of a project at the level of accuracy required by the owner to make an investment decision. The economic analysis usually include

    Jan 1, 1991

  • CIM
    Back to the Basics in Process Control

    By A. Vien, B. C. Flintoff, R. P. Edwards

    "A major thrust in industrial automation over the past few years has been the exploration and incorporation of higher level (supervisory and optimizing) control strategies aimed at more fully exploiti

    Jan 1, 1998

  • CIM
    Back-Analyses of Failures and Support Redesign of a Magnesite Roomand-Pillar Mine Excavated in Stratified Rock

    By J. Arzúa, L. R. Alejano, P. Rodríguez

    "After six years of successful excavation with a support pattern, some roof failures have happened in a room-and-pillar underground mine excavated in a stratified rock mass. In this paper the authors

    Jan 1, 2015

  • CIM
    Back-analysis of the Extreme Squeezing Conditions in the Exploratory Adit to the Lyon-Turin Base Tunnel

    By G. Russo

    During the construction of the S.Martin La Porte access adit, 9m in diameter, extreme squeezing conditions occurred while crossing Carboniferous schistose formations, with diametric convergence up to

    May 1, 2009

  • CIM
    Backfill at Madsen

    By L. H. Van Loon, E. G. Crayston, A. F. Heather

    "IntroductionTHE PROPERTY of Madsen Red Lake Gold Mines. Limited. comprises fifty-eight claims located between Russet and Faulkenham lakes in Baird and Heyson townships of the Patricia portion of the

    Jan 1, 1954

  • CIM
    Backfill Optimization and in-House Shotcrete Production at the Cluff Lake Mine

    By Jamel Sgaoula

    During 1998 COGEMA Resources Inc. announced that operations at the Cluff Lake mine will be suspended indefinitely by the end of year 2000 as a result of deteriorating uranium market conditions. To rem

    May 1, 2001

  • CIM
    Backfill practice and technology at Kidd Creek Mines

    By T. R. Yu, D. B. Counter

    "Kidd Creek Mines primarily employs sublevel blasthole stoping for underground mining operations. During pillar recovery in No.1 Mine and panel mining in No.2 Mine, the free standing fill exposures ma

    Jan 1, 1983

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    Backfill practices at the Williams mine

    By D. Bronkhorst, J. Rheault

    "Backfill practices at the Williams mine have evolved significantly since underground mining began in 1986. The use of conveyors as a means of transporting fill material to stopes has been discontinue

    Jan 1, 1994

  • CIM
    Backfilling at Noranda

    By F. E. Patton

    "IntroductionAT NORANDA, the strength of the ore and wall-rocks per-mitted mining in large open stopes. While some of the orebodies were small and could be mined out in one stope, in most cases their

    Jan 1, 1952