Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of a radiotracer technique to evaluate gold recovery by gravity concentratorsBy P. O. Rag, Daniel E. Walsh
"Gravity concentrators are evaluated either in closed or open circuit. The process developed by MIRL employs the use of neutron activated gold (/98Au) and radiation detection circuits which monitor th
Jan 1, 1986
-
Development of a Remotely Controlled Reagent Feeding SystemBy J. A. Hillier
The staff of the Hudson Bay Mining and Smelting concentrator have developed a new type of reagent feeder. Several factors encouraged the development of such a system: varying heads caused by the mixin
Jan 1, 1973
-
Development of a Risk Assessement Model for Underground OpeningsBy M. Moghadami
Design and construction of underground openings are associated with many uncertainties with regard to input data. In the construction process of underground openings various levels of risks exist and
Aug 1, 2013
-
Development of a Risk-Based Inspection System for the Mining and Metals IndustryBy S. Boisvert
Risk-based Inspection (RBI) addresses the challenges associated with ageing plants by focusing the inspection effort on the process equipments with the highest risk, thereby improving plant safety and
Jan 1, 2010
-
Development of a robust PTA hardfacing process using the Taguchi methodBy J. Day, Matthew X. Yao, Lijue Xue
Hardfacing overlays are commonly applied on the shroud Z-section of turbine blades for enhanced wear resistance. Among various processes that are used to apply the hardfacing overlays, the plasma tran
Jan 1, 2004
-
Development of a Self-Navigating Continuous MinerBy D. C. Reid
This paper describes the latest results in research and development currently being undertaken by the CSIRO Mining Technology Group to advance the automation capability of continuous mining equipment
Aug 1, 2013
-
Development of a simple segregation program to manage potentially acid generating waste rock at the Keystone Gold Mine, ManitobaBy D. H. Flather, J. W. Hendry, K. Drover
Black Hawk Mining Inc. has completed a comprehensive program on the prediction and management of acid rock drainage (ARD) at their Keystone Gold Mine (Keystone) near Lynn Lake, Manitoba. The program,
Jan 1, 2000
-
Development of a Softsensor for Particle Size MonitoringBy René G. del Villar, Jules Thibault, René del Villar
"Some key control variables of industrial processes, associated with product quality, often cannot be measured directly or frequently enough to establish adequate control. In such cases, it is possibl
Jan 1, 1996
-
Development of a Sorbent Adsorption/Desorption and Gc/Ms Method for the Determination of Perfluorocompounds (CF4 and C2F6) Emitted from Aluminum SmeltersBy N. Sauret-Szczepanski, G. Patry, S. Gauthier, G. Potvin, C. Munger
Adsorption/thermal desorption with sorbent cartridges and analytical method using gas chromatography coupled to mass spectrometry (GC/MS) was developed for the determination of tetrafluoromethane (CF4
Jan 1, 2006
-
Development of a spontaneous heating liability index of coal from kinetic parametersBy H. B. Sahu, N. M. Mishra, D. C. Panigrahi
The paper presents the development of a spontaneous heating liability index (SHLI) of coal based on a mathematical approach. The parameters for the calculation of this index have been determined by di
Jan 1, 2008
-
Development of a Stable MnO2 Protective Layer on Lead-Based Electrowinning AnodesBy Georges Houlachi, Akram Alfantazi, Michael Mahon, Maysam Mohammadi
Corrosion resistance of the lead-based anodes directly influences the purity of the final product in the zinc electrowinning process. The anodic MnO2 layer that is electrodeposited on the anodes durin
Jan 1, 2016
-
Development of a Stable Social Unit at the Black Angel MineBy P. J. Noakes
Remote and isolated, located in a frigid, hostile environment, the Black Angel mine in Greenland had to create a warm social environment which would help attract and retain a stable work force of mine
Jan 1, 1978
-
Development of a superior upper sidewall for indurating iron ore pelletsBy J. R. D. Gravel, D. A. Poland
"The induration of iron ore pellets has always utilized prefired pellets to protect the pallet cars from the environment of the induration furnace. This paper presents the process used to obtain super
Jan 1, 1999
-
Development of a System Based on Water Pulverisation to Decrease, Prior to Treatment, the Temperature of the Gas Emitted from Aluminium CellsBy P. Personnet, D. Wheaton, E. Couzinie, V. Demetriou, Brooks. W., G. Girault, M. Meyer, L. Charbonnel
A common problem in Gas Treatment Centers (GTC) from primary aluminium smelters is the temperature of the gas to be treated : above a threshold, filtering media are irreversibly damaged. The tradition
Jan 1, 2006
-
Development of a Technology to Process Antimonite Gold-Bearing OreBy S. V. Ulianov, A. Y. Senchenko, A. A. Shvets, A. V. Aksenov
Development of an efficient technology to process complex ores containing gold and antimony as well as silver is described in the paper. The results from the testwork aimed at the valuables recovery b
Jan 1, 2016
-
Development of a Thiosalt Treatment System at Xstrata Copper Kidd Metallurgical SiteBy Andréa Lagacé
"The milling of sulphide ores inherently generates “thiosalts”, a series of partially oxidized sulphur oxyanions (S2O3 2-, S3O6 2-, S4O6 2- etc.), which make control of effluent treatment systems diff
Jan 1, 2010
-
Development of a Total Station with a Concentric Circle Reticle and a Navigation System for Pile DrivingBy Kazuhide Nakaniwa
In this research, we devised a measurement method using total stations (TSs) which have ?the Baum? which is a concentric circle reticle, as substitute for crosshairs. The Baum owes its name to the sim
Aug 1, 2013
-
Development of a Two-Stage Middlings Circuit at Inco's Clarabelle Mill PART 2: On-Site Pilot plant Testwork and Full Plant ImplementationBy A. Bouchard
"Based on laboratory testwork, a two-stage cleaner / re-cleaner circuit with feed regrind was proposed to replace an existing single-stage middling circuit treating a scavenger concentrate at Inco’s C
Jan 1, 2001
-
Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory StudiesBy Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn
"The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven
Jan 1, 2000
-
Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines LimitedBy P. D. R. Maltby
"With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to
Jan 1, 1984