Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Value Creation Through Strategic Mine Planning and Cutoff Grade OptimizationThe OptiPit® software program is developed based on expertise gained at the Colorado School of Mines (CSM) using Mixed Integer Linear Programming (MILP) techniques. This program has been developed to
Jan 1, 2007
-
Low temperature hydrothermal activity in Ultraslow Spreading RidgesBy Huaiyang Zhou
"Hydrothermal systems are a major component of the processes that shape the composition and structure of the ocean crust, providing a major pathway for the exchange of heat and elements between the Ea
Sep 1, 2014
-
Mechanisms Involved In Reactive Flotation Of DolomiteBy A. El-Midany
Dolomite impurities are increasing in the currently mined phosphate deposits in Florida. Several research efforts have been conducted in various laboratories around the globe to find methods to econom
Jan 1, 2009
-
Wireless Access To Live Data From Mining Operations - Anywhere & AnytimeBy R. Heersink, C. H. Wells
Innovations in communications and real-time information systems are providing industry opportunities to improve profitability. Real-time operating data is collected from equipment across a site or ev
Jan 1, 2002
-
Optimizing Influences In The Selection of Grinding Mill TechnologyBy G. Duncan, K. Winther, R. Ericsson
Distinct trends in grinding mill technology have emerged in recent years. In an effort to optimize overall mill performance for the needs of the End User, broad measures of logistical speed, process f
Jan 1, 1999
-
New look at underground coal mine safetyBy E. M. Spokes
Starting in 1980, a committee of the National Research Council studied the question of why some underground coal mines are safer than others and what could be done to improve the ones with poorer perf
Jan 1, 1987
-
Performance Characteristics For Welded Wire Screen Used For Surface Control In Underground Coal Mines - Preprint 09-104By D. R. Dolinar
The fall of small pieces of rock between roof bolts causes over 80 pct of the ground fall injuries in underground coal mines. Roof screen, if installed on the bolting cycle, can significantly reduce
Jan 1, 2009
-
A Standard Column Weathering Test To Estimate Coal Overburden Leachate Quality - Introduction - Preprint 09-086By E. F. Perry
Simulated weathering tests are used to estimate leachate quality of rocks containing varying concentrations of pyrite and carbonates at mines. This study reports the inter-laboratory results from the
Jan 1, 2009
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
Control Of Iron In Copper Electrolyte Streams With A New Monophosphonic/Sulphonic Acid Resin (SME Annual Meeting Feb. 28-Mar. 1, Salt Lake City, Utah)By M. J. Gula, S. S. Xue, E. P. Horwitz, J. T. Harvey
A study has been conducted to control iron in copper electrolyte streams using Eichrom Industries’s new Monophosphonic /sulphonic acid resin. The resin strongly and selectively extracts ferric ion ov
Jan 1, 2000
-
The introduction of UK rock bolting technology into coal mines around the worldBy G. Daws, N. Woodward, A. Oxley
Many mines around the world have been seeking ways to achieve sustainable developments and reduce operating costs. Rockbolting is a technology that needs to be considered as it provides a means of red
Jan 1, 2011
-
Geotechnical Investigation for Design of Largest USA Highway Tunnel Cross Section in Challenging Geotechnical Conditions ? IntroductionBy Julian Prada
Tunneling requirements are presenting designers with greater challenges. The design and construction of the 2000-ft long unidirectional twin highway tunnels for the approach to one of two bridges of t
Jan 1, 2008
-
Acid Rock Drainage from Abandoned Mines to High-Andean LakesBy José A. Rios, José A. Vidalôn
The case study of a highland area in the Central Andes of Peru, where many abandoned polymetallic mines are found, is presented. Some of these mines generate metal leaching and acid rock drainage (ML/
Jan 1, 2000
-
Morenci Concentrate Leach Plant First Year Review - Preprint 09-028By J. Cole
The Morenci concentrate leach plant construction was completed and successfully commissioned in October 2007. The plant was designed to operate at medium temperature, 160ºC and pressure, 2,100 kPa.
Jan 1, 2009
-
Economics Of Autogenous GrindingBy S. Lähteenmäki, P. Koivistoinen, J. Levanaho
Semi Autogenous Grinding (SAG) circuit is the most common grinding circuit to day. In Europe and South Africa fully autogenous (AG) circuits are also popular. SAG circuit has a lower capital cost and
Jan 1, 2001
-
Synthetic rutile from a low-grade titania slag using sulphation-roasting processBy I. M. Morsi, S. Z. El-Tawil, O. A. Fouad, K. A. El-Barawy, M. B. Morsi, M. M. Nasr
Upgrading of a low-grade titanium slag (~55% TiO2) with high silica, calcia, magnesia and iron contents has been studied using sulphation roasting technique using SO2/air gas mixture followed by hydro
Jan 1, 2005
-
Destruction Of Cyanide In Gold And Silver Mine Process WaterBy F. W. DeVries, O. B. Mathre
Addition of Kastone® peroxygen compound and formaldehyde to cyanide gold extraction process effluents, containing at least 5 mg soluble copper per liter, will oxidize acid-dissociable cyanide to leve
Jan 1, 1981
-
Real Options: A Tool For Managing Technical Risk In A Mine PlanBy J. A. Botín
NPV is a static measure of project value which does not discriminate between levels of internal and external risk in project valuation. Due to current investment project?s characteristics, a much more
Jan 1, 2012
-
Integrating Research and Development in E&C FirmsBy Roshan B. Bhappu
Integrating a research and development department into an engineering company's corporate structure can be rewarding to the engineering division, the R&D group, and, most of all, the company&apos
Jan 10, 1980
-
San Francisco?s Central Subway, Extending the Third Street Light Rail to ChinatownBy Matthew E. Fowler
The Central Subway will extend the recently completed 8.2-km long Third Street Light Rail line another 2.7 km north through the Union Square shopping district to Chinatown with a concourse-to-concours
Jan 1, 2008