Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Implementation of a Real Time Traceability System from Mine to PlantBy R. Ticona, J. Alarcon
In the continuous search to provide comprehensive solutions and identify opportunities to improve ore traceability, from the blastholes to mill feed, different ore traceability systems have been devel
Jan 1, 2024
-
Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable LayerBy Ye Yuan, Jaak Daemen, Shaguo Yuan
ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre
Jan 1, 2010
-
Comparison of the Non-Ideal Shock Energies of Sensitised and Unsensitised Bulk ANFO-Emulsion Blends in Intermediate Blasthole DiametersBy E. Vilaescusa, J. Eloranta
The work presented in this paper investigates the influence of non-ideal detonation characteristics related to the blasthole diameter, base emulsion sensitivity (micro-balloon sensitised versus unsens
Jan 1, 2012
-
Journal: 100 Years / The Engineering And Mining Journal New York August 10, 1907 Ground Breaking In The Joplin District Q786 Holes Are Drilled With Air Drills And Squibbed Before Charging. About 1 Pound Of Dynamite Is Required Per Ton Of Rock BrokenBy Doss Brittain
The term ground breaking is taken to include the process of so loosening the ground as to enable it to be readily loaded into buckets or cars and hoisted from the shaft or drift. In the Joplin distric
Jan 1, 2008
-
Blasting Versus Non-blasting Related Sounds in a House Near Surface BlastingBy Braden Lusk
A typical rural house surrounded by a surface coal mine was instrumented in 2008. Information regarding ground vibration, airblast, and sounds inside the house was collected. Previous publications hav
Jan 1, 2011
-
Blast Optimization using Air Decking with Gasbags – An Open Pit Gold Mine Case Study.By Angelina Anani, Seffit Aderuyi, Sylvester Avane, Joseph Wilson-Sey, Amatus Niminye
The Edikan mine in Ayamfuri, Ghana, faces economic challenges and community resistance due to its proximity to residential areas, particularly concerning blasting operations. Controlled blasting trial
Jan 21, 2025
-
Blast Design and Mill Performance – A Case HistoryBy Raj K. Rajamani, Solomon A. Tucker, Michael K. McCarter
"In a study aimed at exploring possible improvements in operating performance at an Open Pit Copper (OPC) mine in the western U.S., the impact of blast energy changes on crushing performance was evalu
Jan 1, 2017
-
An Empirical Method of Comparing Brisance of Various Bulk ExplosivesBy Neal Lee, Braden T. Lusk, Brendan McCray
"Selection of a blasting agent for optimum performance is based on many variables. Often, a decision is made with regard to product cost and field testing. Defining optimum performance can be difficul
Jan 1, 2017
-
Use of Electronic Initiation System in Urban Shaft Sinking ProjectBy Richard Turnbull, James Purssey
"The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be
Jan 1, 2017
-
Precision Delay Detonators: A Decade of ProgressBy M. Y. Wong
Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili
Jan 1, 2004
-
Modeling An Artificial Screen For Reducing Seismic VibrationBy Lazar Kricak, Vladislav Kecojevic, Dragan Bogunovic
In spite of many advantages explosives have, their usage may cause environmental problem such as seismic vibration. One of the solutions to this particular problem may be application of an artificial
Jan 1, 2007
-
Median and Mean in the Kuz-Ram ModelBy CVB Cunningham
"The Kuz-Ram model as originally proposed included an error in assuming that the mean fragmentsize predicted by Kuznetsov’s equation was actually the 50% passing size. In 2003 Spathis began discussion
Jan 1, 2016
-
Reducing eyebrow break caused by rock blasting in Malmberget mineBy Zong-Xian Zhang
In sublevel caving mines, serious eyebrow break usually gives rise to lower ore recovery, higher dilution, and worse safety for the people working in the field. For example, chargers must go near the
Jan 1, 2011
-
Bench Blasting Design Based on Analysis of Blast-Induced Ground Vibrations at an Open Pit Coal Mine in TurkeyBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Serdar Celik, Yucel Karakus
This paper presents bench blasting designs based on results of vibrations analysis on test shots organized in an open pit coal mine located near to Soma district at Manisa province in Turkey. There ar
Jan 1, 2012
-
The Influence of Blast Fragmentation on Loadability in Sublevel CavingBy Daniel Johansson, Markus Danielsson, Håkan Schunnesson
In sublevel caving, blasted material flows gravitationally into the drawpoint from above in a periodical manner. This type of flow behavior entails muck pile conditions that are variable along the cou
Jan 1, 2018
-
Comparison of Recent and Past Blast Induced Pipeline Strain ResponsesBy Travis A. Davidsavor, Charles Dowding, David A. Provost, Yonggang Gou
This paper compares measured blast induced strains on operating, full scale, buried pipelines with three similar past studies. The recently performed study represents realistic and modern pipeline bla
Feb 1, 2020
-
A Comparative Study Of Ppv Analysis Of Tunnel Rounds Using Both Non Electric And Programmable Electronic DetonationBy Andrew Wetherelt
Blast vibrations are of paramount importance in a society where ever increasing development is putting more stringent requirements on their control. Increasing civil development and more complex extra
Jan 1, 2007
-
Municipal Blasting: Blast Design, Vibration Monitoring & ControlBy Frank Lucca
This paper includes research and investigation into blast design and blast optimization for vibration control in municipal and tight blasting situations, where specifications were extremely stringent.
Jan 1, 2004
-
The Effects of Various Wet-Hole Loading Methods on Powder FactorBy Neal Lee
Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,
Jan 1, 2011
-
Minimising Coal Damage and Loss Due to Cast BlastingBy Tapan Goswami
The main objective of the blasting phase in a coal mining operation is to maximise the coal recovery. However, coal loss due to blasting is a serious problem. The Australian Coal Association Research