Managing SOE Construction Risk through Design-Build SystemsBy Rob Jameson
"The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,
Jan 1, 2017
-
Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
Limitations Of Predicting Deformations During Excavation In Soft Clay ? SummaryBy Richard J. Finno
Detailed measurements made at a test section adjacent to a deep braced cut and other published data are combined to illustrate the limitations of the common methods of predicting movements associated
Jan 1, 1991
-
Recycling Jet Grout Backflow: Waste Mitigation and Cost BenefitsBy Craig T. Jones, Zachary Q. Maassen
"Jet grouting is a method of ground improvement that relies on the erosive capacity of high-speed jets to cut and mix the ground in place with a cementitious grout. A continuous return flow of cutting
Jan 1, 2017
-
Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load TestsBy Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Capacity Of Driven Piles In SandBy Mohab Sabry
Pile foundations are used extensively around the world to support both inland and offshore structures, including important structures such as nuclear plants and oil drilling platforms. The limit of th
Jan 1, 2006
-
Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 IntroductionBy Timothy L. Roberts
For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary
Jan 1, 1998
-
Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - SynopsisBy A. B. Desai
The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across
Jan 1, 1996
-
Underpinning The Existing No. 1 Subway Line At The World Trade CenterBy Richard Crockford
The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne
Jan 1, 2008
-
Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, CaliforniaBy Lawrence P. Goldfarb
This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg
Jan 1, 1993
-
Hydraulic Impact Pile Hammers ? BackgroundBy Patrick Bermingham
The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes
Jan 1, 1987
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Load Testing Of Steel Sheet Piling Driven With A Vibratory HammerBy Drew Floyd
Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi
Jan 1, 1989
-
Reinforcement of Existing Deep Foundations with MicropilesBy Mauricio Terceros, Martin Achmus, Freddy Lopez
The massive use of deep foundations had a remarkable influence in the building industry in the 20th century. Piles and micropiles made possible to erect thousands of civil structures around the world,
Jan 1, 2018
-
Effective Analysis Of Soil-Pile Interaction Under Dynamic LoadsBy Inn-Joon Park
Major problems associated predicting soil-structure interaction behavior are based on the fact that soil is neither homogeneous nor elastic and soil properties are spatially variable. There also exist
Jan 1, 2002
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? IntroductionBy R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 IntroductionBy Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Installation Parameters, Pile Performance and Importance of TestingBy Maurice Bottiau
"Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co
Jan 1, 2014
-
Confinement Of Two Contaminated Sites In A Petrochemical Plant; Case HistoryBy Raffaella Granata
The paper deals with the remediation of two areas formerly utilized for the disposal of hazardous wastes in a petrochemical plant. The works, designed on the basis of the criteria of maximum safety an
Jan 1, 2006