Seal Slab / Steel Pile Interface Bond From Full-Scale TestingBy Gray Mullins
This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen
Jan 1, 2013
-
Fenway Park Modernization - Foundations For A Red Sox NationBy Mark H. Balfe
Over the last decade, Fenway Park has undergone annual improvements to modernize the facility for players and fans. These renovations include the Monster Seats, the Right Field Roof expansion, a new
Jan 1, 2011
-
The Application Of Interlocked Steel Pipe Pile And Steel Sheet Pile For An Industrial Port ? SynopsisBy M. Tominaga
An industrial port complex was constructed on the west coast of Leyte Island The work was started in December 1981 and completed in May 1984. This port complex includes a 665 m long wharf and can acco
Jan 1, 2010
-
Practical Experience With Nondestructive Testing Of Augered Cast-In-Place PilesBy Bernard H. Hertlein
All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug
Jan 1, 1997
-
Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup EffectsBy Mohammadreza Khanmohammadi, Kazem Fakharian
"AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise
Jan 1, 2014
-
The Pile Foundation Of Tall Buildings In ShenzhenBy Li Keqiang
This paper discusses the pile foundation of tall buildings in Shenzhen region. For 156 constructed tall buildings exceeding 18 storeys, about 86. 5 per cent of the sum. The two main types of foundatio
Jan 1, 1991
-
I-470 Mine RemediationBy Sheryl D. Gallagher
The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the
Jan 1, 2009
-
Use of CSM to Support a Heritage BuildingBy Chris G. Leach
"Abstract A seven storey Northbridge area of Perth, Western Australia presented residential apartment complex located in the an opportunity for a novel application of Cutter Soil Mix technology (CSM).
Jan 1, 2014
-
Full-Scale Field Investigations & Numerical Analyses of Innovative Seismic Composite Fiber Reinforced Polymer and Reinforced Grouted Helical Screw Instrumented Piles Under Axial & Lateral Monotonic & Cyclic LoadingsBy M. Hesham El Naggar, Yasser Abdelghany
"ABSTRACT: The axial and lateral monotonic and cyclic behavior of helical pile foundations was investigated and new innovative helical screw systems suitable for seismic loadings were developed and pa
Jan 1, 2014
-
Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew
Jan 1, 2008
-
Design Strategy For Deep Slurry Stabilized Bored Piles In CompressionBy Chu E. Ho
Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p
Jan 1, 2002
-
Use Of Large Diameter And Long Steel Pipe Piles In Japan ? SynopsisBy K. Kawakami
In Japan, pile foundations have been used extensively for buildings, bridges and port facilities. A large number of steel pipe piles were first used in the 1960's and the amount of steel used in
Jan 1, 2010
-
Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? SynopsisBy G. Price
The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less
Jan 1, 2010
-
Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2003
-
Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, MassachusettsBy Harry Schnabel
A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi
Jan 1, 2011
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban SlopeBy Mike Fabius
The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o
Jan 1, 2006
-
Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place PilesBy Mike Muchard
Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an
Jan 1, 2000
-
Behavior Of Grouted Shaft Helical Anchors In ClayBy Alan J. Lutenegger
Some years ago, a method was developed to incorporate a grout column around square-shaft helical screw-piles and anchors to increase shaft buckling resistance under compression loading. An additional
Jan 1, 2011
-
Developments For Mitigating Measures From Deep Shafts Of North/South-Line AmsterdamBy Klaus Pöllath
This paper describes mitigating measures and the design of compensation grouting which will be executed from deep shafts of the Amsterdam North/South Metro line project. Due to the specific conditions
Jan 1, 2006