Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    DFI45 Annual Conference on deep Foundations 2020

    By DFI DFI

    An Online Conference

  • DFI
    Bluestone Dam Safety Assurance Program: An OPA Runner Up

    By Jeff Hopple

    "Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en

    Jan 1, 2014

  • DFI
    Resonance Pile Driving with Zero Ground Vibration

    By Mark Johnson, Mathew Janes

    "The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl

    Jan 1, 1900

  • DFI
    Pile Driving Dilemma: Reducing Noise, Vibrations

    By Michael D. Justason

    "In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de

    Jan 1, 2012

  • DFI
    High Capacity Drilled Piles in Brooklyn

    By Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe

    "The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount

    Jan 1, 2016

  • DFI
    A Case History On Design, Construction, And Performance Of Stone Column Ground Improvement Beneath An Mse Embankment

    By Karen Dawson

    This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge ab

  • DFI
    Risk Management Techniques to Avoid Litigation

    By Kevin Cunningham

    "Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.

    Jan 1, 2015

  • DFI
    Shoring Up D.C.'s Historical Foundations: Collection 14

    By Alan Quiroga

    Nestled between Meridian Park and Howard University in the heart of Washington, D.C., the historic block between 14th, V and W streets North- west featured several original struc- tures, many of them

    Aug 1, 2023

  • DFI
    Instrumented Pile Load Tests In The Area Of Pearl Harbor, Hawaii

    By John Y. L Chen

    This paper presents full-scale instrumented pile static compressive and tensile load tests to be conducted in the area of Pearl Harbor, Hawaii. Thousands of piles have been installed to support the ex

    Jan 1, 2002

  • DFI
    Role of Probabilistic Methods in Sustainable Geotechnical Levee Integrity Analysis

    By Juan M. Pestana-Nascimento, Robert G. Bea, Hamed Hamedifar, Emery M. Roe

    The current State-of-the-Practice is grounded heavily on deterministic characterization and assessment of the performance of civil engineering infrastructure. In particular, flood defense systems, suc

    Jan 1, 2017

  • DFI
    Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal Mine

    By Stephan Fisch, Franz-Werner Gerressen

    "The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining

    Jan 1, 2017

  • DFI
    Novel Methods Of Restraining Embedded Retaining Walls

    By Abid Adekunte

    Traditionally, designers and contractors provide additional external supports to retaining walls through the use of tie-back anchors or braces. Both approaches are known to have their shortcomings; br

    Jan 1, 2010

  • DFI
    Real Time Monitoring Of Utility Vaults during Reconstruction of the Elliot Bay Seawall

    By Pierre Gouvin

    "This paper discusses real time monitoring of utility vaults during the reconstruction of the Elliot Bay Seawall in Seattle. The project, undertaken because deterioration of the old wall posed increas

    Jan 1, 2017

  • DFI
    Measured And Modeled Settlements Of Power Plant On Piled Raft Foundations

    By Gianni O. Chieruzzi

    A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t

  • DFI
    Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)

    By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi

    "A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t

    Jan 1, 2017

  • DFI
    Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental Considerations

    By Takashi Enomoto

    "The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja

    Jan 1, 2015

  • DFI
    Trencher Method Vs. Slurry Trenching: A Pros & Cons Comparison Of Case Studies

    By Daniel Ruffing, Charlie Krug

    In recent years, the chain-style trencher has been proven a valuable tool for installing vertical walls on challenging sites where conventional methods may be less desirable. Like many tools, trencher

  • DFI
    Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a

  • DFI
    Real-Time Anchor Testing and Data Management

    By Bora Okumusoglu, Devon K. V. Mothersille

    "AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front

    Jan 1, 2017

  • DFI
    Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    "When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau

    Jan 1, 2017