Search Documents

  • TMS
    An Innovative Stack Melter for Use in the Aluminum Casting Industry

    By Neal Schwartz, Robert De Saro, Richard Rosenthal, Ed Kear

    "A Stack Melter has been installed and is currently operating at Lexington Die Casting. The Stack Melter consists of a 1 meter (3 foot) diameter refractory tube, 2 meters (7 feet) high. Specification

    Jan 1, 2000

  • AIME
    Reports of the Annual Meeting, A.I.M.E.

    By AIME AIME

    QUALITY and size do not ordinarily go hand in hand, but there is good evidence that both these attributes reached a new peak at the Annual Meeting of the Institute in New York just concluded. Certainl

    Jan 1, 1940

  • NIOSH
    RI 3490 Annual Report Of The Explosives Division, Fiscal Year 1939 ? Introduction (2dcb94ad-dd15-44ff-8b85-29719cc37115)

    By Wilbert J. Huff

    The work of the Explosives Division, Bureau of Mines, United States Department of the Interior, for the fiscal year ended June 30, 1939, is described in the following pages. This paper is the fourth o

    Jan 1, 1940

  • SME
    Design And Start Up Of The Cortez Gold Mines Pipeline Mill

    By R. N. Powell

    The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the

    Jan 1, 1999

  • SME
    Experimental Shaft Machine for Nuclear Waste Disposal

    By Dennis Ofiara, Michael Lewis

    An experimental 1.75 meter Shaft Boring Machine was designed and manufactured by The Robbins Company. The drill was used by contractor Drillcon Raise AB to drill test shafts at an SKB underground test

    Jan 1, 2005

  • SAIMM
    Community Management Of Mineral Resources: The Case Of The Royal Bafokeng Nation - Synopsis

    By S. E. Cook

    This article uses the case of the Royal Bafokeng Nation to argue that royalties and dividends from mineral resources, if managed well, can provide direct benefits to the surrounding community even whi

    Jan 1, 2013

  • AIME
    Trackless Mining Proposed For Pitching Coal Seam

    By H. C. LIVINGSTON

    At the Hanna No. 4-A mine of The Union Pacific Coal Co. a new system of trackless mining is being utilized to extract a 26-ft coal seam. By using shuttle cars and a conveyor belt for haulage in the ro

    Jan 1, 1949

  • SAIMM
    Suid-Afrikaanse Raad vir Professionele Ingenieurs Beleidsverklaring no. 1/3

    1. OPLEIDING IN INGENIEURSWERK VIR IN G ENIEURS- IN -OPLEID IN G 1.1 llegistrasie as Ingenieur-in-opleiding 'n Gegradueerde ingenieur wat in 'n eksamen geslaag het wat die Raad erkenl, is re

    Jan 1, 1979

  • SME
    Adapting Responsible Care Program to the Colombian Mining Industry

    By D. E. L. Zapata, O. J. R. Baena

    "INTRODUCTION Mining is a fundamental part of the historical and economic development of a country. In Colombia, this is reflected from pre-Columbian jewelery, to being now one of the first exporters

    Jan 1, 2018

  • SME
    Cemented Rock Fill System Design And Application In Leeville Underground Mine

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,500 tons of ore per day with an average gold grade of 0.34 opt. The mine has a large horizontal extent of 2,500

    Jan 1, 2011

  • AIME
    Reservoir Engineering - General - The Heat Efficiency of Thermal Recovery Processes

    By M. Prats

    Most of the information available on the heat efficiency of hot fluid injection processes, both water and steam, has been obtained from calculated temperature distributions in the pay zone and adjacen

    Jan 1, 1970

  • NIOSH
    OFR-94-78 Development Of Noise Control For Secondary And Tertiary Crushers In Surface Non-Coal Mining Plants And Mills

    By G. Boehler

    The purpose of this program is to demonstrate the feasibility and practicality of noise control for secondary and tertiary crushers in surface non-coal mining plants and mills. It is a part of the bro

    Jan 1, 1977

  • DFI
    An Unique Formula for the Stone-Column Group Efficiency

    By Abhijit Saha

    "The stone columns improve the performance of foundations on soft and loose soil due to the ability of composite ground to sustain increased structural loads under reduced settlements. The interaction

    Jan 1, 2015

  • NIOSH
    IC 8853 Proceedings Of The Workshop On Techniques For Measurement Of Thermodynamic Properties, Albany, Oreg., August 21-23, 1979

    To improve communication among Government, industry, and academic researchers in the field of thermodynamics, the Federal Bureau of Mines sponsored a Workshop on Techniques for Measurement of Thermody

    Jan 1, 1981

  • NIOSH
    OFR-92-82 Feasibility Of Using Cemented Backfill In Active Underground Coal Mines To Prevent Subsidence

    By D. V. Gaffney

    This report presents the results of a three-phase investigation of the feasibility of using cemented coal waste in active underground coal mines to prevent mine subsidence. Coal caste was broadly defi

    Jan 1, 1981

  • TMS
    Green Recycling of EEE: Special and Precious Metal Recovery from EEE

    By C. E. M. Meskers

    Electronic and Electric Equipment contains a range of components made of a wide variation of metals, plastics and other substances. Up to 60 elements can be found in complex electronic equipment: base

    Jan 1, 2009

  • CIM
    Environmental Aspects of the Generation and Disposal of Iron Residues at a Votorantim Zinc Refinery in Brazil

    By T. Takayama Filho

    Votorantim Metais Zinco is a smelting facility which produces SHG zinc, zinc alloys, sulfuric acid, liquid SO2, copper sulfate, cadmium metal and silver concentrate. It is located at Juiz de Fora, Min

    Jan 1, 2006

  • SME
    Decision Tools For Integrating Sustainability Into Planning And Feasibility Phases Of Projects For Extractive Sector Enterprises ? Introduction

    By A. Ramage

    Since late 2010, CH2M HILL has been working with a confidential client who holds a long-term commitment to sustainable development (SD). The commitment is aligned with all three elements of the triple

    Jan 1, 2012

  • SME
    Take Time For Pit Phase Design

    By A. Eccles

    Phase designs are the foundation upon which all open pit mine sequence optimizations and budgets should be built. Unfortunately, at times, mine engineers skip the step of developing realistic pit phas

    Feb 27, 2013

  • CIM
    Mine Development, Consultation With Indigenous Peoples and Sustainablity

    By A. Ingelson

    Conflict over mineral development and its impacts on indigenous peoples occurs in many countries around the world. Canada, Bolivia and Peru have experienced mine development for centuries in areas whe

    Aug 1, 2013