Roof Span Design for Underground Stone MinesBy Essie Esterhuizen, John Ellenberger, Dennis Dolinar
"Underground stone mines in the United States use the room-and- pillar method of mining. The stability of the roof between pillars determines the mining dimensions and size of equipment that can be us
Jan 1, 2010
-
Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone StrataBy J. R. Koehler
The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f
Jan 1, 1995
-
Rock Slope Stability Comparison Between Deterministic and Probabilistic Block Theory Analyses for An Open Pit MineBy Pinnaduwa H. S. W. Kulatilake
A new formulation is given to conduct a probabilistic block theory analysis. A new computer code (BTAC) has been developed to perform both deterministic and probabilistic block theory analyses. The va
Jan 1, 2014
-
Application of Laser Scanning for Rock Mass Characterization and Discrete Fracture Network Generation in an Underground Limestone MineBy Juan J. Monsalve, Nino Ripepi, Richard Bishop, Jon Baggett
"Terrestrial laser scanning (TLS) is a useful technology for rock mass characterization. A laser scanner produces a massive point cloud of a scanned area, such as an exposed rock surface in an undergr
Jan 1, 2018
-
Research on the Characteristics of Mine Pressure and Overlying Strata Movement in Downward Mining Longwall Panels in Steeply Dipping SeamsBy Jingyi Cheng
Many longwall panels in China are laid out along the dip direction such that the direction of longwall retreat mining is along the strike direction of coal seams. Downward mining longwall panels in st
Jan 1, 2013
-
Influence of a Coal Mine Subsidence on An Adjacent DamBy Nengxiong Xu
The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)
Jan 1, 2013
-
Key Technologies of Integration of Coal Mining–Gangue Washing–Gob BackfillingBy Wei Yin, Yu Wu, Xiexing Miao
"For engineering problems of “three under” coal (coal trapped under buildings, waters-bodies and railways) exploitation, environment protection and gangue separation from raw coal underground exist in
Jan 1, 2015
-
Load Deformation Behavior Of Simulated Longwall Gob MaterialBy Deno M. Pappas
The purpose of this U.S. Bureau of Mines study was to determine the material stiffness properties of the gob for use in numerical models of rock mass response to longwall mining. Photographs of actual
Jan 1, 1993
-
Preventing Falls Of Ground In Coal Mines With Exceptionally Low-Strength Roof: Two Case StudiesBy Christopher Mark
Mines with exceptionally low-strength roof (UCS <3,500 psi and CMRR <40) are much more likely to struggle with roof falls than other mines. Weak-roof is a particular problem for many room and pillar m
Jan 1, 2004
-
Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib ReinforcementBy Gabriel Walton, Sankhaneel Sinha
"Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co
Jan 1, 2017
-
Non-Destructive Testing Method for Determining the Characteristic Length and Initial Axial Bolt Load and Its ApplicationBy Houquan Zhang, Yu Wu, Yanlong Chen, Zhenfu Luo, Aihong Lu
"A non-destructive detection scheme for bolt installation quality was designed by adopting the method of non-destructive detection on bolt installation quality. Based on the field measurements, a rand
Jan 1, 2016
-
Safe Mining Evaluation of Coal Seam between Abandoned Upper and Lower Room-and-Pillard MinesBy Guorui Feng, Min Zhang, Yi Luo, Jian Yang, Yujiang Zhang, Junwen Bai
"Safe mining of coal seam sandwiched between abandoned upper and lower room-and-pillared mines (ULPM) ·is increasingly becoming the focus of attention in recent years, which is closely related to the
Jan 1, 2016
-
Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case StudyBy Li Yang, Andre Cezar Zingano, Alberto Fronza
"Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f
Jan 1, 2017
-
A Case Study Of A Deformation Mechanism Around A Two-Entry Gate-Road System Involving Probable Time-Dependent BehaviorBy M. K. Larson
The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms around a longwall gate-road system in an underground coal mine. Of particular interest was roof defo
Jan 1, 1995
-
Laboratory Investigation of Confinement-Dependent Mechanical Behavior of a Utah CoalBy Bo-Hyun Kim, Steve Berry, Mark K. Larson
"When coal pillar bursts occur, they involve the sudden expulsion of coal and rock into the mine opening. These events occur when relatively high stresses in a coal pillar, which serve as support in u
Jan 1, 2018
-
Coal Pillar Design in Tabas Central Mine of IranBy Mostafa Sharifzadeh, Ebrahim Ghasemi, Kourosh Shahriar
"The Tabas Central Mine (TCM) is one of the underground coal mines located in the Tabas coal region, in the mid-eastern part of Iran. This mine is the first mechanized coal mine in Iran that uses the
Jan 1, 2010
-
The Design of Primary Ground Support during Roadway Development Using Empirical DatabasesBy Ry Stone
"There have been many design practices utilised within the coal mining industry to arrive at the minimum densities of primary ground support required during roadway development. This paper demonstrate
Jan 1, 2015
-
Analysis Of Retreat Mining Pillar StabilityBy Christopher Mark
Preventing pillar line squeezes, massive pillar collapses, and coal pillar bumps is critical to the safe and efficient recovery of coal during retreat mining operations. To help prevent these problems
Jan 1, 1995
-
Optimization of Chain Pillars Design in Longwall Mining MethodBy Kazem Oraee, Mehran Gholincjad, Navid Hosseini
"Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the
Jan 1, 2010
-
Improving Roof Control At A South African Coal MineBy Alan Bugden
Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and
Jan 1, 2001