    Case History: Comparison of CSL Results to Physical Observations

    By David S. Graham, Paul J. Axtell

    Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b

    Jan 1, 2019

  • DFI
    Ideas To Improve Driven Pile Foundation Design And Installation Procedures

    By Armin W. Stuedlein, Steven R. Saye

    The differences between calculated axial pile capacity and the capacity realized during and following installation has long presented a significant concern for foundation engineers and contractors. Su

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d

    Jan 1, 2017

  • DFI
    Vertical Bearing Capacity of Pile Installed by "EX MEGATOP" Method - Base Enlarged Pre-boring and Grouting Method for Pre-cast Pile

    By Hitoshi Ogura, Koichi Kobayashi, Sadao Yabuuchi

    "In Japan, most pile foundations using pre-cast concrete piles are installed by the bored pre-cast piling method, wherein pre-cast piles are installed in holes that have been excavated beforehand and

    Jan 1, 2005

  • DFI
    Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DC

    By Karl A. Higgins, Michael D. Venezia

    The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o

    Jan 1, 2019

  • DFI
    Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT Subway

    By Dharmil Patel, Michael J. Chow

    "Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;

    Jan 1, 2016

  • DFI
    Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp

    By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das

    Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r

    Sep 1, 2022

  • DFI
    Army Corps Megaprojects: The Benefits of Innovative Foundations

    By Dale Berner, Michael O’Sullivan

    "This article focuses on lessons learned from innovative designs including in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers (USACE)

    Jan 1, 2016

  • DFI
    Heating And Cooling Structures With Steel Pile Foundations Closed Loop Standing Column Well Technology

    By Paul Suver

    The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing co

  • DFI
    Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special Application

    By Andhra Pradesh, Nagarajkumar B. V

    As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad

    Sep 1, 2022

  • DFI
    A Review of the Design Formulations for Static Axial Response of Deep Foundations from Cone Penetration Test Data

    By Fawad S. Niazi

    Analysis of deep foundations in terms of axial capacity has been a topic of great interest in the soil-structure interaction problems. Soil behavior is governed by a series of complex stress-strain ch

    Jan 1, 2013

  • DFI
    Jet Grouting Soft Clays for Tunnelling & Deep Excavations Design & Construction Issues

    By Marcelo Chuaqui

    We certainly have the data to back calculate it. I must admit that I haven't, at the moment my priority is not on what is the stiffness of the jet grout but is making sure that the jet grout is r

    Feb 10, 2003

  • DFI
    Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)

    By Paul Suver

    "The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c

    Jan 1, 2017

  • DFI
    Innovative SSP Design and Construction for a Complex Soil Remediation Project

    By Matthew C. Janes, Mark C. Spence

    "A former coal gasification site next to Rock Bay in Victoria, BC, Canada required a barrier to permit dewatering and excavation of the bay and surrounding property. The adjacent property owners had s

    Jan 1, 2016

  • DFI
    “Digital Specialist Foundations”- Using The Digital Twin During Project Execution

    By Marcus Daubner

    This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during

    Sep 1, 2022

  • DFI
    Hybrid Excavation Support System for the Union Station Revitalization Project

    By Charles G. Crans, Naresh Gurpersaud

    "Toronto’s Union Station, a National Historic Site occupying an entire city block, is the busiest commuter rail transportation hub in Canada. An extensive project is being undertaken to revitalize Uni

    Jan 1, 2017

  • DFI
    Session 24 "Compaction Grouting and Consensus Guide"

    By Richard Berry

    The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th

    Feb 10, 2003

  • DFI
    Meadowlands Megaproject: 9,000 Piles and Counting

    By Ronald D. Boyer

    "Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,

    Jan 1, 2009

  • DFI
    Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected Applications

    By Michael E. Ameel

    The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co