    Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    Flotation Data - Now that I've got all these numbers what do I do with them?

    By Grano S. R, Ralston J

    It is the perennial problem most metallurgists face when examining data collected from laboratory float tests and plant surveys - there are more numbers than we know what to do with! The objective o

    Jan 1, 1994

  • AUSIMM
    The Kinetics of the HDO-H2 Isotope Exchange Reaction on Liquid Silica-Saturated Iron Silicates

    By Belton G. R

    The kinetics of the interfacial reaction of H2O on liquid silica-saturated iron silicates has been studied by means of measurement of the HDO-H2 isotope exchange reaction. The apparent first order

    Jan 1, 1987

  • AUSIMM
    A Collaborative Model for Developing Future Continuing Education and Training in Mining

    By S W. Houlding

    The Certificate in Mining Studies program at the University of British Columbia, Vancouver, Canada is a collaborative initiative between mining schools and industry to provide accessible, cost-effecti

    Nov 22, 2011

  • AUSIMM
    The International Network for Acid Prevention (INAP) ù An Overview of Activities

    By A-M Fleury

    There has been much progress on the issue of acid drainage over the past 20 years; however, significant challenges remain. The International Network for Acid Prevention (INAP) is attempting to address

    Jan 1, 2003

  • AUSIMM
    A New Approach for Reverse Flotation of Magnesite From Dolomite

    By G Chen

    Magnesite and dolomite are two salt-type minerals. The surface characteristics of these two minerals are almost the same. It is very difficult to remove dolomite from magnesite ores by flotation proce

    Jan 1, 2005

  • AUSIMM
    Hydrogeological characteristics of co‐disposed tailings and coarse rejects from coal processing

    By S Fityus, K Koosmen, J Simmons

    The purpose of this paper is to therefore investigate the hydrogeological characteristics of tailings, coarse and mixed rejects from coal processing to enable better understanding of the potential for

    Jul 1, 2021

  • AUSIMM
    Benefits of Advanced Technology in Underground Mining

    By M Edhammer

    In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants

    Mar 21, 2011

  • AUSIMM
    Long Term Stability of Rehabilitated Strip Coal Mines

    By Williams DJ

    Preliminary calculations suggest that spoil piles in the Bowen Basin will undergo approximately 4 m settlement as the ground water table recovers after mining is abandoned. Approximately 1 m of di

    Jan 1, 1987

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)

    By D Audeyev

    The Cooljarloo North Mine has been shaped not only by operational and processing challenges, but by climatic and economic factors. This paper outlines some of these challenges and discusses how the op

    Oct 5, 2011

  • AUSIMM
    A Transparent and Pragmatic Quantitative Risk Assessment Process for Assessing Fire Safety in New Zealand Tunnels

    By T Ireland, B Wright, S Weaver

    All tunnels have unique characteristics that result in different fire and life safety risk. The fire safety systems for each tunnel also give different benefits at different costs. It is therefore nei

    Sep 17, 2014

  • AUSIMM
    Some Notes on the White Cliffs Opal Fields, Wilcannia

    White Cliffs Opal Field is situated in the Parish of Kirk, County of YulguIgra, New South Wales, about sixty miles from Wilcannia, and the River Darling. It is near the southern edge of the cretaceous

  • AUSIMM
    Dynamic Simulation as a Test Bed for Emerging Technologies

    The adoption of new technologies is accompanied by risks that the stakeholders will wish to understand and minimise. The process of developing a dynamic simulation and the plant it will be used in pro

    Sep 26, 2011

  • AUSIMM
    Liberation characteristics of comminuted ore types of the Per Geijer iron-oxide apatite deposits

    By T Seifert, P Krolop, K Niiranen, S Gilbricht

    The Per Geijer iron oxide apatite deposits (IOA) display significant potential mineral resources for Luossavaara-Kiirunavaara AB (publ), known as LKAB. LKAB continuously mines magnetite/hematite ores

    Nov 8, 2021

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Now to the Future – A Path Toward the Future Mine

    By I Gipps

    Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t

    Nov 22, 2011

  • AUSIMM
    Australian Innovation in African Heavy-Haul Rail

    By K Devencorn

    The development of robust, economical transport infrastructure has been identified as a key driver to sovereign economic growth. Notwithstanding the value of undeveloped mineral resources, unless they

    Nov 22, 2011

  • AUSIMM
    Iron Ore Holdings Ltd – Case Study of the Environmental Approval Challenges for an Emerging Junior

    By H Fletcher

    Iron Ore Holdings Ltd (IOH) is an emerging junior iron ore company that is actively developing projects in the Central and Western Pilbara region of Western Australia. IOH commissioned URS Australia P

    Jul 11, 2011

  • AUSIMM
    Surrounded by Change - Collective Strategies for Managing the Cumulative Impacts of Multiple Mines

    By D Brereton, C J. Moran

    Intensive resource extraction, in the form of multiple mining operations, presents significant assessment and management challenges for resource developers, governments, community and the environment.