Search Documents

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • IOM3
    Landform replication in quarrying

    By R. Allington, G. Walton

    The approach has been applied with success to the restoration of chalk workings in southern England, and research and trials relating to restoration blasting and the replication of limestone dale land

    Aug 1, 1994

  • CIM
    Graphical-Analytical Model of the Generation of Methods and Variants of Methods of Digging, respectively of the Technologies and Technological Variants of the Execution of the Underground Mining Work

    By Nicolae Dobritoiu

    The literature in this field and the practical activity record that a method, respectively the technology used for an underground mining work have many components which, in order to be applied, demand

    Oct 1, 2009

  • ABM
    Influência Do Eletrólito No Desempenho De Filmes De Polipirrol Na Proteção Do Alumínio 2024 Contra A Corrosão

    By Karine Miranda Bezerra

    A presente pesquisa investigou a eficiência dos filmes de polipirrol (PPy) eletrodepositados potenciostaticamente em meio aquoso contendo os Ácidos: Dodecil Benzeno Sulfônico (DBSA) ou p-Toluenossulfô

    Aug 8, 2018

  • ABM
    Desenvolvimento De Um Simulador De Temperaturas Dos Revestimentos Refratários De Um Forno De Aquecimento

    By Rafael Duclou Rito

    Com temperaturas altíssimas atingidas, os fornos são equipamentos responsáveis pelo aquecimento de materiais na produção de tubos sem costura. Assim, o investimento requerido de um forno em bom funcio

    Oct 30, 2017

  • CIM
    Towards a Worldwide Network of Education in Mineral Engineering

    By Hans de Ruiter

    "Delft University of Technology, RWTH Aachen, Helsinki University of Technology and Imperial College established the Federation of European Mineral Programs (FEMP) in 1999 as a legal body to coordinat

    Jan 1, 2004

  • SME
    Preliminary Rib Support Requirements for Solid Coal Ribs Using A Coal Pillar Rib Rating

    Researchers from the National Institute for Occupational Safety and Health (NIOSH) are developing a coal pillar rib rating (CPRR) technique to measure the integrity of coal ribs. The CPRR characterize

    Jan 7, 2020

  • DFI
    Assessing the Bearing Capacity of Existing Wood Pile Foundations

    By Almer E. C. van der Stoel

    "Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e

    Jan 1, 2014

  • SME
    Mining Foundation of the Southwest Honors 2003 Inductees

    The 21st Annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held at the Sheraton Tucson Hotel in Tucson, AZ on Saturday, Dec. 6, 2003. Th

    Jan 1, 2003

  • SME
    Comparison Of Field Measurements With Finite Element Results--Capitol Hill Relief Sewer Section II (Washington, D.C.) --

    By Delon Hampton, Francis K. Mensah-Dwumah

    INTRODUCTION The state-of-the art in the area of soil-structure interaction is not sufficiently developed that one can accurately predict the earth load distribution on buried structures. This lack

    Jan 1, 1979

  • SAIMM
    The Transition From Open Pit To Underground Mining: An Unusual Slope Failure Mechanism At Palabora

    By Hao Li, Allan Moss, Richard K. Brummer

    At the Palabora Mine, the transition to caving 400 m below the bottom of the 800 m deep pit resulted in a slope failure of the North wall that began in 2003, and is still mobile. This failure can be

    Jan 1, 2006

  • SAIMM
    Predicting the probability of Iron-Rich Ultramafic Pegmatite (IRUP) in the Merensky Reef at Lonmin’s Karee Mine

    By D. Hoffmann, S. Plumb

    IRUP is an iron-rich ultramafic pegmatite rock that formed due to hot ironrich fluids and gases replacing local stratigraphic zones of the Bushveld Complex. This study focuses on the estimation of the

    Jan 1, 2015

  • CIM
    Optimizing the Carbon Circuit at the Young-Davidson Mine Using CIP/CIL Modelling

    By M. Tiedtke, T. Crary, P. MacPhail, M. Ounpuu

    "The SGS carbon-in-pulp (CIP) / carbon-in-leach (CIL) model was used to evaluate and optimize the carbon circuit at Alamos Gold’s Young-Davidson Mine. Plants samples (pulp and carbon) were tested in a

    Jan 1, 2018

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006

  • DFI
    Pressure-Grouting Improves Performance of Helical Piles: A Production Case History, Static Load Test Results, and Comparisons to Predicted Lateral Deflection and Axial Resistance

    By Karen J. Dawson, Francisco Johnson

    "Pressure-grouted high strength helical displacement piles are a recently developed pile type that can be useful in conditions where noise or vibrations must be low or where access or clearance is lim

    Jan 1, 2016

  • IOM3
    Selective flocculation separations involving hematite

    By A. D. Read

    Selective flocculation was investigated as a possible method of recovering values from mineral slimes which are too finely divided to be treated by conventional mineral processing methods. It has prov

    Dec 1, 1971

  • AUSIMM
    Macraes Gold Project: Value Creation through Applied Technology - Pressure Oxidation

    By T S. Giraudo

    The Macraes Gold Project, operated by GRD Macraes Limited, engaged GRD Minproc Limited to assist with the evaluation of a pressure oxidation circuit, this being the key component of a recovery enhance

    Jan 1, 2000

  • NIOSH
    RI 4800 Diamond Orientation In Diamond Bits - Procedures And Preliminary Results

    By Albert E. Long

    To date the commercial diamond bit setters have been principally interested in the speed with which they could produce a sharp, fast-cutting bit. Thus, a premium has been placed on setters who combine

    Jan 1, 1951

  • NIOSH
    IC 9336 Launching Total Quality Management in the Bureau of Mines: A Case Study - Quality Improvement Report: October 1990 Through September 1992

    By Julie N. Walker

    This U.S. Bureau of Mines report reviews the first 2 years of the agency's progress in implementing total quality management (TQM), which the agency refers to as Quality Improvement (QI). All emp

    Jan 1, 1992

  • NIOSH
    RI 7173 A Petrofabric Study Of Tectonic And Mining-Induced Deformations In A Deep Mine

    By Elbridge W. Gresseth

    Rock deformational structures in a deep mine were analyzed by petrofabric techniques to learn (1) the relative magnitude and direction of the principal stresses involved in tectonic deformations prior

    Jan 1, 1968