Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Softwall Mining (Patent Pending) New Technology For Phosphatic Clays And Other Deposits In Soft, Shallow ConditionsBy Randall D. Peterson
Strip mining with draglines and other surface equipment has traditionally been the method of choice for mining shallow deposits. This is particularly true for soft deposits that require little or no b
Jan 1, 1998
-
Discussion - Copper and Its Byproducts Technical Papers, MINING ENGINEERING, vol. 35, No. 4, April 1983, p. 343-347By M. Lonoff
G. Campbell The paper by M. Lonoff looks at the importance of byproduct prices on copper production. The paper develops several interesting points on this topic, but there are some points in the theo
Jan 11, 1983
-
Ground Characterization And Feasibility Evaluation Of Tunneling Methods For Mather InterceptorBy Mohammad R. Jafari
The Camp Dresser & McKee (CDM) has been retained by the Sacramento Regional County Sanitation District (SRCSD) to design the Mather Interceptor, a portion of the South Interceptor and Mather Intercept
-
Water is Key Issue at Elko Roundtable 2007By Rick Frechette, Bryan Ulrich
Representatives from several mining operations in three western states left their mines behind for a day in February to discuss with their peers the issue of water. The event was Knight Piésold a
Jan 1, 2007
-
Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New ZealandBy Charlie Watts, Ken Smales, Ron Fleming
The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace
Jan 1, 2007
-
Performance Of A Soft Ground Tunnel On The Washington MetroBy Edward J. Cording, William H. Hansmire
INTRODUCTION The Washington Metro, a rapid transit system that will serve the District of Columbia, Virginia, and Maryland, has been under construction for about two years. Construction of the Metr
Jan 1, 1997
-
Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal MiningBy B. Asbury, M. Cigla, C. Balci
The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel
Jan 1, 2002
-
Water Quality Implications Of Decrease Coal UseBy L. J. Habegger
This paper considers the potential water quality impacts of future energy scenarios which project an approximate doubling of coal utilization from 1975 to 1985. The major impacts estimated for coal ex
Jan 1, 1978
-
Integrated Sustainability Assessment in the Mineral Industry - Framework and ExampleBy R. J. Baumgartner
Sustainability issues are from rising interest and importance for the mineral industry worldwide. In order to bring them into management processes and to improve decision processes, economic, ecologic
Jan 1, 2005
-
IntelliMine - Innovative technologies and concepts for the sustainable and intelligent Deep Mine of the futureBy H. Hejny
"The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only
Jan 1, 2011
-
Conceptual Design for a Deep Underground Science and Engineering Laboratory CascadesBy Roberto J. Guardia, Robert A. Robinson, John Wilkerson, Wick Haxton
Several candidate sites have been proposed for the Deep Underground Science and Engineering Laboratory (DUSEL), a facility that would provide over 2000 meters of overburden to screen out cosmic rays t
Jan 1, 2005
-
The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and ResultsBy Enrique Fernandez
M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to
Jan 1, 2007
-
Double Shield TBM In Challenging, Difficult Ground Conditions?A Case Study From Zagros Long Water Transfer Tunnel, IranBy Jafar Khademi Hamidi
The Zagros long tunnel is one of the main components of Sirvan water transfer project in western Iran. It is approximately 48 km in length and consisted of two lots. The second 26 km lot of this tunne
-
Reducing Longwall Noise With Acoustical Material On The Shields - 4 Preliminary Analysis – Preprint 97-108By A. D. Prokop, J. P. Rider
Along with increased production from longwall units has come the likelihood of increased worker noise exposures. In recent years, equipment has become larger, more powerful, and noisier than its prede
Feb 24, 1997
-
Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined ShaftBy D. Kruse
Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov
Jan 1, 2011
-
Protecting Miners from Coal Bursts During Development Above Historic Mine Workings in Harlan County, KentuckyIn order to reach a large, untapped reserve of high-quality coal, D8 Cloverlick mine proposed to mine a corridor nearly 2,000 ft deep beneath the Benham Spur of Black Mountain, Kentucky’s highest peak
Jan 7, 2020
-
Technology for In Situ Uranium LeachingBy David Baughman, Steven Axen, Ray V. Huff, Donald H. Davidson
Introduction In situ leaching (ISL) is an alternative method of mining uranium from deposits that are low-grade, deeplying, and water-saturated. ISL recovers uranium by transporting fluids through
Jan 2, 1980
-
Systemized Maintenance Pays OffBy Frank F. Rahne
Butler Taconite, operated by the Hanna Mining Company, is an Iron ore pelletizing operation that is located on the Western end of the Mesabi Iron Range in Northeastern Minnesota. The operation mine
Jan 1, 1975
-
The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario OperationsBy T. Weatherwax
As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects
Jan 1, 2008
-
Research on the Roof Advanced Breaking Position of Large Mining Height Working Face in Shallow Coal SeamFully mechanized longwall mining with large mining heights (LMHs) in shallow-depth thick coal seams has been widely applied in Shenfu coalfield, China. Dynamic loading and rib spalling is serious when
Jul 28, 2020