    Building Risk Assessment For Urban Rail Transit Systems In India - Current Practices And Challenges

    By Manchanda H, Agarwal J.

    The construction industry has one of the largest numbers of injuries compared to other industries. Thus, reducing accidents and determining construction risks are extremely important. One of the essen

    Sep 1, 2022

  • DFI
    Evolution Of Piling Design And Techniques In Mudstone At Manchester Airport

    By Colin Curtis

    In recent years, Manchester Airport has undergone expansion including the construction of a second runway, a new terminal building (Terminal 3) and extensions to the existing Terminal 1. Manchester is

    Jan 1, 2001

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • DFI
    Jet Grout Underpinning to Support the Waterman Hospital

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t

    Jan 1, 2019

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009

  • DFI
    Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise Building

    By A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane

    Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha

    Jan 1, 2019

  • DFI
    Research on the Stability Analysis of TDM Column Composite Foundation Supported Embankment

    By Song-yu Liu, Chao Yan, Yong-feng Deng

    "In order to investigate the stability of embankment on soft subgrade improved by T-shaped deep mixed column composite foundation, the internal forces and failure modes of columns were analyzed on the

    Jan 1, 2015

  • DFI
    The Merits Of Polymeric Fluids As Support Slurries

    By J. J. Beresford

    The primary function of a support slurry is to provide stability during excavation. Today foundation structures can be designed around the additional friction afforded by the absence of the filter cak

    Jan 1, 1989

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • DFI
    Pile Design For Offshore Structures Subjected To Subsidence

    By Juan J. Campo

    The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15

    Jan 1, 1992

  • DFI
    Integrity Testing - Friend Or Foe?

    By Bernard H. Hertlein

    Transportation system structures have come under very close scrutiny in the last couple of years, largely due to the damaging effects of disasters, both natural and man-made. In the Pacific northwest

    Jan 1, 1998

  • DFI
    Piling Adjacent To Rail Tunnels At King’S Cross Central

    By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott

    This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600

    May 1, 2022

  • DFI
    Friction Loss in Tieback Anchors used for Landslide Stabilization

    By John P. Turner, Benjamin J. Turner

    "Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho

    Jan 1, 2017

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case Study

    By Parameswaran V. S, Anshuman Singh

    This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v

    Nov 1, 2022

  • DFI
    Presentation #1 - Deep Foundation Inspection And Integrity Testing - Introduction - Why Use Drilled Shafts?

    By Bernard Hertlein

    ¦ Drilled shafts resist scour seismic loads better than groups of driven piles ¦ Drilled shaft construction creates less noise and vibration than driving piles ¦ Drilled shafts permit direct obser

    Jan 1, 2001

  • DFI
    Failure Analysis and Strengthening of Tailing Pond Embankment by Prefabricated Vertical Drains and Geogrid

    By Anup Kumar Mandal, Sanjoy Chowdhury, Biswajit Das

    "Tailing pond of an iron ore mine necessitated raising the height of its embankment to create additional storage capacity. The tailing pond is located in eastern India and raising the height of embank

    Jan 1, 2015

  • DFI
    Ladies And Gentlemen,

    By George Koenig

    I have been granted the outstanding privilege... and pleasure to introduce you this evening to the Grand-Duchy of Luxembourg and to tell you in a few words how this country came into existence, how it

    Jan 1, 1987

  • DFI
    Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. Introduction

    By John Lemke

    Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin

    Jan 1, 2002

  • DFI
    The Challenges Of Construction In Karstic Limestone: Three Major Case Histories

    By Donald A. Bruce

    The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si

    Jan 1, 2002

  • DFI
    Installation Of Augered Cast-In-Place Piles

    By Michael Moran

    Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:

    Jan 1, 2005