Search Documents

  • SME
    World?s Largest TBM Keeps Niagara Project On Track

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st

    Jan 1, 2008

  • AUSIMM
    Fosterville gold mine – breaking the mould for Victorian gold

    By N Phillips

    Fosterville gold mine recently celebrated production of its one millionth ounce of gold based firmly within a history of refractory sulfide gold mining. Compared with other Victorian gold mines, the d

    Sep 20, 2017

  • AUSIMM
    Significance of Ion Interactions in Flotation in Saline and Brine Solutions

    Significance of Ion Interactions in Flotation in Saline and Brine Solutions

    Sep 13, 2010

  • IIMP
    Gestión por procesos U- P. Uchucchacua (como base para la integracion de sistemas de gestion)

    By Daniel Briones

    El presente trabajo señala las bases que fundamentan la aplicación de los Sistemas de Gestión Integrados y se ofrecen argumentos que sustentan los mecanismos usados para integrar los sistemas de Segur

    Sep 12, 2005

  • NIOSH
    OFR-135-77 Multilift Longwall Mining Methods For Thick Coal Design And Feasibility

    By John Wilson

    This report describes the performance of Phase I of a project to design, analyze, and demonstrate a multilift longwall mining method applicable to mining coal seams twelve (12) feet or more in thickne

    Jan 1, 1976

  • SME
    Use of the Field-Based Silica Monitoring Technique in a Coal Mine: A Case Study Mining, Metallurgy and Exploration (73df3ae5-6ddf-4125-a270-9ce737fe4b48)

    By James J. Meadows, Jason D. Pampena, Emanuele G. Cauda, Lauren G. Chubb

    Exposure to respirable crystalline silica (RCS) can cause serious and irreparable negative health effects, including silicosis and lung cancer. Workers in coal mines have the potential of being expose

  • SME
    Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, OR

    By Niels Kofoed

    Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM

    Jan 1, 2011

  • TMS
    A New Recycle Process of Uranium from Spent Fuel by Selective Sulfurization

    By Nobuaki Sato

    For the recovery of uranium from spent nuclear fuel, sulfide reprocessing process, which consists of voloxidation, selective sulfurization, and magnetic separation or selective dissolution steps, are

    Jan 1, 2006

  • CIM
    SUPASIM: A Methodology to Predict Plant Performance from Laboratory Data

    By C. J. Martin, M. P. Hay

    "A methodology was developed in the mid-1980’s to predict plant performance from standard laboratory flotation tests. The technique is based on a simple, empirical kinetics model, and is tailored for

    Jan 1, 2004

  • AUSIMM
    The Design of Blends for the Production of Metallurgical Coke with Particular Reference to Long Term Aspects of Using New South Wales Coals

    Coking coals are very much in demand on a world wide basis, particularly the higher rank coking coals, which form an important part of many coking blends and which represent the smallest portion of th

    Jan 1, 1972

  • NIOSH
    Gold Mining And Milling In The United States And Canada - Current Practices And Costs ? Introduction

    By Charles F. Jackson

    Gold mining is a subject that not only appeals to the popular imagination but has vital importance to the world's economic structure. However, a discussion of the use of gold as a medium of excha

    Jan 1, 1932

  • SAIMM
    Innovated Solutions For Automated Charging And Stoking

    By J. Dienenthal

    Automatic Charging and Stoking Machines for use at ferroalloy furnaces are in operation for more than 20years. Dango & Dienenthal Maschinenbau GmbH (short: DDS) has developed several machine generatio

    Jan 1, 2007

  • AUSIMM
    Managing the Cumulative Groundwater Impacts of Multiple Iron Ore Projects at Cape Preston (or à One Plus One Plus One Plus One Does Not Equal Four)

    By J Hall, A Gallardo, M Strizek

    Mineralogy and coproponents Sino Iron, International Minerals and Austeel are in the process of developing four world class magnetite iron ore mines with multiple open pits along a 25 km strike length

    Jan 1, 2009

  • AUSIMM
    Some Geological Investigations Into A Fossil River System in the Roof Strata of the Bulli Seam, Southern Coalfield, N.S.W.

    By Driver R. C, Moelle K. H R

    This paper is dedicated to the memory of our friend Peter McKenzie who contributed much to the knowledge of the New South Wales Coalfields.ABSTRACTA fossil river system was recently mapped over parts

    Jan 1, 1967

  • AUSIMM
    The Carrick Gold Project - An Exploration Case History

    By A J. Eggers

    With gold first discovered at Carrick in 1864, exploration and mining on the Carrick Goldfield in Central Otago, New Zealand, has now been ongoing for more than 130 years. Recorded historical hard roc

    Jan 1, 1997

  • TMS
    Synthesis Of Al2O3-SiCw Ceramic Matrix Composite By Carbothermal Reduction Of Kaolin

    By Sutham Niyomwas

    Keywords: Al2O3-SiCW, Ceramic Matrix Composite, Carbothermal Reduction, Kaolin The formations of Al2O3-SiCw composite have been obtained in situ by carbothermal reduction of a mixture of kaolin a

    Jan 1, 2005

  • AUSIMM
    Gas Well Testing in the Roma Area

    Gas well tests were performed on 17 wells in the Roma area. The procedure used in the test programme incorporates an initial isochronal test followed by what is described as the "two flow drawdow

    Jan 1, 1968

  • SME
    Reclamation of Canmore Creek; Example of a Successful Walk Away Pit Lake Closure

    By H. Gerry Stephenson, Devin Castendyk

    "One of the most important environmental issues associated with contemporary openpit mining is the closure of mine pit lakes, and the perpetual legacy these lakes can potentially generate. Ideally, su

    Aug 1, 2019

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME
    Final Tunnel Liner At The Mill Creek 3 Project

    By M. Schafer

    The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a

    Jan 1, 2008