Search Documents

  • RMCMI
    Highwall and Spoils Design and Monitoring

    By Tim Peterson

    Factors Controlling Stability Stability of slopes in soft rock, waste dumps or soils is governed by three factors: ?Slope configuration ?Groundwater ?Shear strength

    Jan 1, 2004

  • NIOSH
    IC 7414 Geophysical Abstracts 127, October-December 1946, with an Index to Abstracts 124-127, compiled

    By V. L. SKITSKY

    Geophysical Abstracts are published by the Division of Geophysical Explo- ration of the U. S. Bureau of Mines as an aid to those engaged in geophysical research and exploration. Inasmuch as geophysici

    Jun 1, 1947

  • DFI
    Influence Of Urbanization And Geology On Deep Foundation Design And Construction

    By Hiren J. Shah

    The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his

    Jan 1, 2011

  • AUSIMM
    The System Silver-Gold: The Reproducibility of Silver Activity Measurements Using the Solid Ionic Conductor, Silver-B-Alumina

    By Browner R, Lincoln F. J

    The activity of silver in solid gold-silver alloys (electrum) has been measured with an electrochemical concentration cell based on the super ionic conductor silver-i3-alumina in the temperature range

    Jan 1, 1983

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003

  • NIOSH
    Operation Of Electrolytic Manganese Pilot Plant, Boulder City, Nev. - Part I. Pilot-Plant Operation - Introduction

    By J. H. Jacobs

    This report records a chapter in the history of the development of an electrolytic manganese industry in the United States. Nearly all the manganese requirements of the United States have been import

    Jan 1, 1946

  • SME
    Prospectors and Developers Meeting – Some Reflections

    By Bruce Gellar

    In March, the Prospectors and Developers Association of Canada (PDAC) held its annual conference in Toronto, Ontario. This is the third PDAC meeting the author has attended. The following are some

    Jan 1, 1999

  • AUSIMM
    Grout Injection Around Underground Workings - Reinforcement Potential and Problems

    The injection of grouting compounds into the consolidated rock surrounding underground mine workings has long been practiced for the purpose of sealing against water flows. In more recent times howeve

    Jan 1, 1994

  • AUSIMM
    Aluminum Therapy in Silicosis

    By Delahant A. B, Dworski M

    From the Saranac Laboratory for the Study of Tuberculosis of the Edward L., Trudeau Foundation, Saranac Lake, New York:We are assembled to honor the memory of our friend and colleague, Donald Cummings

    Jan 1, 1945

  • AIME
    Metal Prices

    By FREDERICW K. BRADLE

    I HAVE been puzzled by two lines of thought'; one emanating from Washington, D. C., to the effect that we must all cheer up, that in a very short time, measured in terms of months, prices would b

    Jan 1, 1930

  • CIM
    Heterogeneity of Low-Grade Ores and Amenability to Sensor-Based Sorting

    By A. Mazhary

    "Although ore sorting in mining is not a new concept, sensor-based sorting has failed to gain broad acceptance due to perceived challenges with the technology. In order to gain wider applications, thi

    Jan 1, 2015

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • SAIMM
    Development of weightometer soft sensor

    By K. Coleman, C. Visser, N. Selby, X. W. Pan, T. Letwaba

    A prototype weightometer soft sensor is under development at DebTech, De Beers in partnership with Venetia Mine. Its main function consists of an online data source; data validation; dynamic weightome

    Jan 1, 2003

  • RMCMI
    The Seven Habits of Highly Effective Maintenance Organizations

    By Paul Swatkowski

    A Note About Copyrighted Material ??Permission to Use? has been granted ?Teachthe7habits ?Think win/win (4thHabit) ?Don?t stop here ?i.e., buy the book

    Jan 1, 2009

  • SME
    Eskay Creek Mine And Mill – A Continued Success

    By G. Biles, K. Loughran, R. Anand

    The Eskay Creek Mine, a high-grade gold and silver underground mine in northwestern British Columbia started operations in late 1994. For the first three years of operation, ore was crushed to minus

    Jan 1, 1999

  • CIM
    Salitre Project Brazil

    By Roberto Busato Belger

    - Fertilizer Business Overview - Supply -Demand Balance in the World - Supply -Demand Balance in Brazil - Brazilian Market Growth Opportunities - Fosfertil Operations - Fosfertil Expansion Plan

    May 1, 2010

  • AUSIMM
    Differences of Opinion in the Recent Geological Report on Broken Hill, N.S.W.

    IN the recent monograph on Broken Hill, N.S.W., by E. C. Andrews,* two independent petrological reports appear as Appendices 1 and n, by W. R. Browne and F. L. Stillwell respectively. In these conside

    Jan 1, 1924

  • AUSIMM
    Vein Relationships and Textures at Martha Mine, Waihi

    By J L. Mauk

    The Martha epithermal Au-Ag deposit contains multiple generations of quartz veins with a range of textures. We examined: +        vein textures, +   &

    Jan 1, 2006

  • SME
    Stainless Steel For Hydrometallurgy Plants

    By J. Olsson

    Introduction Stainless steel has by tradition been a common construction material for hydrometallurgy processes and the most common grades can be found amongst the ASTM 300-series, i.e. austenitic gr

    Jan 1, 2007

  • SME
    Design And Start Up Of The Cortez Gold Mines Pipeline Mill

    By R. N. Powell

    The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the

    Jan 1, 1999