Search Documents

  • AUSIMM
    Reduction of Copper Sulphide with CO-cO2-He Gas Mixtures in the Presence of CaO

    By Moinpour M

    The kinetics of reduction of copper (cuprous) sulphide with CO-CO2-He gas mixtures, using an excess of CaO(s) as a sulphur-scavenging substance were investigated in the temperature range 855° - 9

    Jan 1, 1989

  • AUSIMM
    Seismic Interpretation Problems Caused by Miocene Channels in the Central Part of the Gippsland Basin

    By Cadman S. J

    ( The central part of the Gippsland Basin is surrounded by existing major Petroleum accumulations and although six exploration wells have been drilled in the area, none are significant petroleum dis

    Jan 1, 1992

  • CIM
    An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount Milligan

    By J. Yue

    "Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of

    Jan 1, 2017

  • CIM
    Application of Mass Blast Principle for Stope Blasting in Deep Mines

    ?? Intro ?? Mass blast principle ?? LaRonde evolution toward mass blast ?? Overview ?? Mining method ?? Longitudinal ?? LaRonde evolution (2002 to today) ?? Drill and blast design ?? Consumpti

    Feb 1, 2008

  • CIM
    Indexes of Mine Microseismic and their Application in Safety Assessment by Statistical Evaluation at Luomu Mine

    By J. Hu, F. Lin, R. Chen, F Peng, S. Yang, W. Yu

    "Microseismic monitoring technology has become one of the most effective method of mine ground pressure monitoring after decades of development. But safety assessment of mine ground pressure by using

    Jan 1, 2015

  • NIOSH
    Bulletin 239 Iron Ore (Hematite) Mining Practice in the Birmingham District, Alabama

    By W. R. Crane

    Mining of the red iron ores of the Birmingham district, Alabama, has _gone on energetically for the past 50 years and has created a large iron and steel manufacturing center, the only important one in

    Jan 1, 1927

  • NIOSH
    Bulletin 165 Bibliography of Petroleum and Allied Substances in 1916

    By E. H. Burroughs

    HISTORICAL REFERENCES OCCURRENCE-GEOLOGY AND ORIGIN. 4. ARNOLD, RALPH. Conservation of the oil and gas resources of the Americas, Econ. Geol., vol. 11, Apr.-May, 1916, pp. 203-222; June, 1916, pp. 299

    Jan 1, 1919

  • AUSIMM
    Stemming of Blastholes in Mining Excavations

    By Lamont G

    The significance of blasthole stemming in determining blasting efficiency has been extensively studied for small diameter holes using gelignite explosives. Recent developments in blasting technology w

    Jan 1, 1979

  • DFI
    Reverse Circulation Drilling (Rcd) Technology For Largediameter Piles

    By Nikolas Schmitz

    For today’s construction industry, large-diameter piles are common practice, as they are more competitive than drilling a larger number of smaller piles. More and more piles are installed by drilling

    Nov 1, 2022

  • AUSIMM
    Ore Minerals of the Rockvale Mine, N.S.W., with Special Reference to Unmixing Textures

    By Chand F

    The silver deposits of Rockvale near Armidale, N.S.W., occur in fissure veins in epi-Permian granite. The ore is fine grained, mineralogically complex, and contains twenty-seven different minerals inc

    Jan 1, 1962

  • SME
    Economic Decision-Making For Methane Drainage Systems For Underground Coal Mines – Preprint 97-157

    By J. M. Mutmansky, A. Wang

    This paper defines the elements of a basic economic model for decision-making when considering a methane drainage system for an underground coal mine. A drainage system will require significant capita

    Feb 24, 1997

  • SME
    Sulfate Reduction - Designing Systems For Long Term Treatment (238ad8d9-2dab-4d3c-a3f1-88274f1b5135)

    By J. Wagner, P. Eger

    Although lifetime estimates for sulfate reduction based on total substrate carbon typically range from 20 to 30 years, field and laboratory experiments showed that rates of sulfate reduction decreased

    Jan 1, 2001

  • SME
    Take Time For Pit Phase Design

    By A. Eccles

    Phase designs are the foundation upon which all open pit mine sequence optimizations and budgets should be built. Unfortunately, at times, mine engineers skip the step of developing realistic pit phas

    Feb 27, 2013

  • NIOSH
    OFR-153(4)-82 Bureau Of Mines Oil Shale Data Bank - Part III - Recent Research Projects - Introduction

    By Richard E. Thill

    The Bureau of Mines' Oil Shale Data- Bank (OSDB) was created in 1976 to serve as a centralized source for the storage, retrieval, and dissemination of technical literature, patents, and informati

    Jan 1, 1982

  • SME
    Lake Cumberland Raw Water Intake Structure—Somerset Water Service

    By Timothy M. Bruner, William J. Maloney

    Faced with rapid growth that strained their current water supply capabilities, the Somerset Water Service in Somerset, KY decided to construct a new intake structure on the shore of Lake Cumberland. W

    Jan 1, 2001

  • CIM
    Data Mining for Prognostic of Complex Equipment with Applications in Aerospace and Railroad

    By Sylvain Létourneau

    Help organizations maximize the benefits of the data that they collect ? perform scientific research in: machine learning, data mining, statistics, artificial intelligence, soft computing, informatio

    May 1, 2008

  • NIOSH
    RI 9426 - Dust Considerations When Using Belt Entry Air to Ventilate Work Areas

    By Robert A. Jankowski, J. Drew Potts

    In this U.S. Bureau of Mines study, four underground respirable dust surveys were conducted to determine factors affecting belt entry dust levels and how using belt air to ventilate work areas affecte

    Jan 1, 1992

  • AUSIMM
    The Causes of Climatic, Geological, and Geographical Changes Upon the Earth

    The phenomena of nature cannot present themselves to any thinking wild without claiming from it some solution. The earth, as it has often been observed, is laid out like a well ordered cabinet, presen

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • IIMP
    Proyecto de optimización de procesos Geologia, planeamiento, mina y mantenimiento

    By José Porras

    El presente trabajo señala el proceso de optimización en la mina a través del área de Tecnología de la Información, superintendencias y las áreas directas de las operaciones. En ese sentido, durante e

    Sep 9, 2007