Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas

    Jan 1, 2001

  • SME-ICGCM
    Massive Pillar Failure--Two Case Studies

    By David H. Tang

    Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes

    Jan 1, 1984

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    An Approach To Identifying Geological Properties From Roof Bolter Drilling Parameters

    By Gerald I. Finfinger

    Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.

    Jan 1, 2000

  • SME-ICGCM
    A Study of Potential Fault Reactivation and Water Intrusion at a Longwall Coal Mine in Appalachia

    By Francis Kendorski

    A longwall coal mine in Appalachia about 1,500 ft deep encountered a fault while developing a new longwall panel. The fault extended from mining depth to the surface near a secondary road and drainage

    Jan 1, 2003

  • SME-ICGCM
    Applications Of Reflection Seismics To Mapping Coal Seam Structure And Discontinuities

    By T. L. Dobecki

    As a means of demonstrating the effectiveness of reflection seismology in determining continuity of coal seams, three U. S. field projects are reviewed. The three projects involve coals of varied thic

    Jan 1, 1981

  • SME-ICGCM
    Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal Mines

    By Matthew J. DeMarco

    Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t

    Jan 1, 1993

  • SME-ICGCM
    Safe Pillar Extraction Practice - Some Geotechnical Principles Based on Australian Experience

    By Bruce K. Hebblewhite

    Underground pillar extraction continues to be practiced in Australia in various forms, in spite of the dominance of the longwall method, which accounts for over 90% of underground production. Australi

    Jan 1, 2011

  • SME-ICGCM
    Utilizing The ?Advance And Relieve? Method To Reduce Horizontal Stress Affects On The Mine Roof, A Case Study (b5b945af-699f-46b0-ae56-a98434baad9f)

    By Dennis R. Dolinar

    A room and pillar coal operation in central Pennsylvania was experiencing roof cutters and long running roof falls caused by high horizontal stresses. The roof conditions created hazards for the miner

    Jan 1, 2000

  • SME-ICGCM
    Longwall Stability Analysis Of A Deep, Bump-Prone Western Coal Mine-Case Study

    By Lance R. Barron

    The U.S. Bureau of Mines, in cooperation with a central Utah coal .mine operator, began a study in July 1988 into longwall gateroad designs applicable to deep, bump- prone mine conditions. Prior to th

    Jan 1, 1990

  • SME-ICGCM
    Stress Analysis and Support Design for Longwall Mine-Through Entries (A Case Study)

    By Keith Heasley

    An eastern longwall mine was required to mine through a set of three entries located midway down the length of a panel. Of course, the mine desired to design a successful support system for the mine-t

    Jan 1, 2003

  • SME-ICGCM
    Analysis Of Cable Bolt Performance Using Numerical Modeling

    By M. Bouteldja

    A finite element modelling approach is developed for the evaluation of the mechanical performance of cable bolts supports in underground mine structures. The modelling approach permits the simulation

    Jan 1, 1999

  • SME-ICGCM
    Integrity Factor Approach to Assess the Stability of Room-and-Pillar Mines

    By Kanaan Hanna

    The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied

    Jan 1, 1988

  • SME-ICGCM
    The Influence Of Stream Valleys On Coal Mine Ground Control

    By John L. Hill

    Over 50 mines of the Appalachian and Illinois Basins are presently experiencing poor ground conditions believed to be caused by overlying stream valleys. The Bureau of Mines is conducting research int

    Jan 1, 1988

  • SME-ICGCM
    Design Aspects In Multiple-Seam Mining: Case Studies

    By Gregory J. Chekan

    Developing a coal seam that has been influenced by previous mining in seams either above or below can result in severe ground control problems. In many instances, interactions between operations are i

    Jan 1, 1990

  • SME-ICGCM
    Overview of Safety Considerations with Highwall Mining Operations

    By George Gardner

    The rapid growth of highwall mining in the Appalachian coalfields has resulted in unique safety concerns. Due to the concentration of activity at the base of the highwall and the potentially destabili

    Jan 1, 2002

  • SME-ICGCM
    Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine

    By Steve P. Signer

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p

    Jan 1, 2001

  • SME-ICGCM
    Shear Bond Stresses Along Cable Bolts

    By Hani S. Mitri

    The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio

    Jan 1, 1990

  • SME-ICGCM
    Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NM

    By P. E. Christensen

    Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f

    Jan 1, 1998

  • SME-ICGCM
    Support Resistance And Roof Behaviour Of A Longwall Face With 4-Leg Shields

    By S. S. Peng

    The hydraulic powered supports have been employed in U. S. longwall mining for the past two decades. Yet the sciences of roof control at the powered supported faces remain largely unknown. In order to

    Jan 1, 1982