Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Ventilation

    By Christopher J. Bise

    INTRODUCTION Traditionally, the purpose of mine ventilation has been defined as diluting, rendering harmless, and sweeping away hazardous gases which may accumulate in the mine workings. In additi

    Jan 1, 1986

  • SME
    Infrastructure in mining industries: A geopolitical and investment challenge

    By M. T. Ansari

    "This article explains the ways in which investment on mining infrastructure is a geopolitical issue. It discusses the effect of installing sufficient infra structure to get the product to the world m

    Jan 1, 2011

  • SME
    Optimum auxiliary fan location to control air recirculation

    By Ajit Godbole, Ping Chang, Ramakrishna Morla, Purushotham Tukkaraja, Shivakumar Karekal

    This paper presents the results of a study on the optimum auxiliary fan location to control air recirculation in dead-end workings where diesel-powered vehicles operate. Investigations were conducted

    Jul 1, 2023

  • SME
    The Effect Of Anode Impurities On Copper Electrorefining

    By M. L. Free, L. Anthian

    Electrochemical, chemical, and image analysis techniques were utilized together with statistical analysis methods to determine the effect of various anode impurities on copper electrorefining performa

    Jan 1, 2000

  • SME
    Design of the Otjikoto Gold Mill, Namibia

    By John Rajala

    The Otjikoto Gold Mill was commissioned during November–December 2014 as Namibia’s first new gold producer in 30 years. Its operations consist of surface mining with a modern gravity/carbon-in-pulp mi

  • SME
    Hot Surface Ignition Of Liquid Fuels Under Ventilation

    By Liming Yuan, Wei Tang, RICHARD THOMAS, JOHN SOLES, DAVOOD BAHRAMI

    Mine equipment fires remain as one of the most concerning safety issues in the mining industry, and most equipment fires were caused by hot surface ignitions. Detailed experimental investigations were

    Oct 1, 2022

  • SME
    3DOPT A Basis For A Mining Engineering System And A Routine To Optimize An Open Pit In Three Dimensions ? Introduction

    The purpose of the 3DOPT Program is to determine, starting from drill hole data, the optimum economic mining limits for an open pit. The economic limits are defined as those which maximize total profi

    Jan 1, 1966

  • SME
    Optimization Of Multigravity Separation For Recovery Of Ultrafine Coal

    By M. Menéndez

    Enhanced gravity separation appears to be one of the most promising methods for processing all types of <200-µm coal feeds and tailings. Systems based on this technology are reviewed, and the results

    Jan 1, 2007

  • SME
    Comparison Of Methods: Dynamic Versus Hydrostatic Testing Of Mine Ventilation Seals

    By M. J. Sapko

    From 2001 to 2007, the Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) conducted studies to develop alternative methodologies to full-scale ex

    Jan 1, 2008

  • SME
    Seismic Upgrades of the Claremont Tunnel

    By Bill Cain, R. John Caulfield, D. Scott Kieffer

    The East Bay Municipal Utility District is undertaking seismic upgrades of the Claremont Tunnel in the San Francisco Bay area. The tunnel carries treated water across the active Hayward Fault to suppl

    Jan 1, 2001

  • SME
    Northwest Mining Association Returns To Spokane For 113th Meeting

    On Nov 1, 2007 House Resolution 2262 ? The Hardrock Mining and Reclamation Act of 2007 ? was passed by the U.S. House by a vote of 244-166. HR-2262, among other things, would impose a 4-per-cent roy

    Jan 1, 2008

  • SME
    Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground Deposit

    By C. Deutsch

    Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells

    Jan 1, 2007

  • SME
    Driving Molycorp’s Conyeyor Decline at Questa

    By D. R. Shoemaker, H. W. Judges

    A 16.5-kt/d underground molybdenum mine is being developed at Questa in northern New Mexico by Molycorp Inc., a wholly-owned subsidiary of Union Oil Company of California. The new $200-million undergr

    Jan 6, 1980

  • SME
    Reduce Urban Tunnel Utility Relocation Risk through Early Relocation by Specialty Contractor

    By Justin Carl, Aliuddin Mohammad, Gordon Evans, Steven Bealby, Carlton Ray

    "The District of Columbia Water and Sewer Authority (DC Water) is implementing the $2.2-billion DC Clean Rivers Project (DCCR) to control combined sewer overflows (CSO) to the Anacostia and Potomac ri

    Jan 9, 2017

  • SME
    A Structural Interpretation Of The Garlock Fault Zone At The Tehachapi Crossing

    By Chester M. F. Peters

    The opportunity to make a close study of the available geologic data existing along the line of the California Aqueduct crossing of the Garlock fault in the Tehachapi Mountains was brought about first

    Jan 1, 1997

  • SME
    Excavation Support And Groundwater Control Using Soil-Cement Mixing Wall For Subway Projects

    By David S. Yang, Osamu Taki

    The innovative Soil-Cement Mixing Wall Technique, developed independently in Japan, consists of mixing in-place soils with cement grout using multi-axis augers and mixing paddles to construct overlapp

    Jan 1, 1989

  • SME
    Simulation of thermal effects on the flow field in a pilot-scale kiln

    By B. DANIEL MARJAVAARA, I. A. SOFIA LARSSON, ANNA-LENA LJUNG

    One way to upgrade iron ore is to process it into pellets. The pelletizing process is multifaceted, involving complex fluid dynamics with highly turbulent, high-temperature flow in intricate geometrie

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • SME
    Seismic Design Measures for the Retrofit of the Claremont Tunnel

    By Bill Cain, David F. Tsztoo, R. John Caulfield, D. Scott Kieffer

    In 1994, the East Bay Municipal Utility District (EBMUD) commenced a system-wide Seismic Improvement Program to protect their facilities from catastrophic damage. A primary focus of this program has b

    Jan 1, 2005

  • SME
    Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor

    By Samuel J. Gambino

    Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p

    Jan 1, 2008