Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Managing SOE Construction Risk through Design-Build Systems

    By Rob Jameson

    "The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,

    Jan 1, 2017

  • DFI
    Results Of An International Pile Load Testing Prediction Event

    By N. Charue

    An international prediction event was carried out within the framework of a 30-pile testing program organized in a sandy soil in Belgium (Limelette). That program called upon sev­eral testing methods:

    Jan 1, 2002

  • DFI
    Downtown Seattle Transit Project - International District Station

    By Richard K. Sandaas

    Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th

    Jan 1, 1990

  • DFI
    Special Foundation Construction For Large Deep Excavation Pits In Berlin - Summary:

    By Wolfgang G. Brunner

    The center of Berlin is currently a huge jobsite, where international architects, designers, consultants, construction and ground engineers as well as investors take on the challenge of the biggest an

    Jan 1, 1999

  • DFI
    Assessing the Bearing Capacity of Existing Wood Pile Foundations

    By Almer E. C. van der Stoel

    "Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e

    Jan 1, 2014

  • DFI
    Behavior Of Grouted Shaft Helical Anchors In Clay

    By Alan J. Lutenegger

    Some years ago, a method was developed to incorporate a grout column around square-shaft helical screw-piles and anchors to increase shaft buckling resistance under compression loading. An additional

    Jan 1, 2011

  • DFI
    Use Of Non-Invasive Helical Foundations For Urban Forest Canopy Walk Way ? Atlanta Botanical Garden

    By David C. Kraft

    Helical piles and ground anchors were used to meet critical design and constructability requirements for an urban forest Canopy Walk at the Atlanta Botanical Garden, Atlanta, GA. The 12-foot wide ped

    Jan 1, 2011

  • DFI
    Case Histories Of Geo-Column? Foundations - Synopsis

    By Osamu Taki

    This paper presents the system, the strength of column, the design concept, and the applications with four case histories from the past project as the general aspect of Geo-Column (trade mark of singl

    Jan 1, 2000

  • DFI
    Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA

    By Jerry F. Parola

    In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi

    Jan 1, 1986

  • DFI
    Deep Foundations for Top-Down Construction of High-Rise Project

    By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin

    A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const

    Jan 1, 2019

  • DFI
    Hydraulic Impact Pile Hammers ? Background

    By Patrick Bermingham

    The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes

    Jan 1, 1987

  • DFI
    Rock Sockets

    By D. E. Sherwood

    Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern

    Jan 1, 1991

  • DFI
    The Quality Control Of Pile Foundations Of Tall Buildings In Shenzhen

    By Li Keqiang

    Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on

    Jan 1, 1991

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • DFI
    A Historic Capitol And A Deep Excavation

    By Richard F. Sliwoski

    The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the

    Jan 1, 2006

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • DFI
    Holding Back The Watchung Mountains

    By Ryan C. Linthicum

    A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains

    Jan 1, 2003

  • DFI
    Behavior Of Excavation And Pile Foundations In Soft Bankok Clay

    By D. T. Bergado

    The uppermost subsoil profiles of the Bangkok plain can be divided into four layers, namely: weathered clay, soft clay, stiff clay, and dense sand layers. The soft Bangkok clay is a normally consolida

    Jan 1, 2010

  • DFI
    Soil Plug in Open Ended Pipe Piles Embedded in Sand

    By Mohammed Y. Fattah, Wissam H. S. Al-Sudani

    "During installation of pile, a soil column is formed inside the pile. For small depths, the height of the soil column typically equals to the penetration depth (full coring state). As the penetration

    Jan 1, 2014

  • DFI
    Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City

    By Willie M. NeSmith

    Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp

    Jan 1, 2004