Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Pre-engineered Hydraulic Bracing Systems

    By Braxton P. Erbe, Douglas C. Brunot

    A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy

  • DFI
    Collaborative Alliances – A Sustainable Way Forward For Construction?

    By Stefano Trevisani

    Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,

    Jan 1, 2014

  • DFI
    Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction Plant

    By Maurice Guillaud

    The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th

    Jan 1, 2002

  • DFI
    Comparative Analysis Between Traditional And EC7 Criteria Applied To The Design Of Diaphragm Walls Concerning The Ultimate Limit States

    By J. Matos e Silva

    The paper refers five examples of executed diaphragm walls with one to five levels of anchorages. For each example a comparison is made between the results of the design using the traditional crit

    Jan 1, 2002

  • DFI
    Ethical and Risk Aspects of Deep Foundation Subcontracts

    By Alexander Filotti, Richard Kalson

    "In the last decade, the construction industry has witnessed significant changes in the project delivery systems and contractual relationships between the general contractors (GC) and Deep Foundation

    Jan 1, 2016

  • DFI
    Impact Of Groundwater Flow On Design Of Open Underground Excavation

    By Heman Manchanda, Sandeep Sharma

    Several infrastructure projects are in various stages of construction and planning in India and almost all of them involves open ground excavation extending to varying depths. These structures are gen

    Sep 1, 2022

  • DFI
    Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation Support

    By Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin

    "Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated

    Jan 1, 2016

  • DFI
    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015

  • DFI
    Harmonization of Execution Codes: Overview of Standardization for US Transportation

    By Silas C. Nichols

    "Abstract Piling and deep foundations are a staple for transportation projects in the United States (US). Driven or bored piles have been used for everything from support of bridge foundations and ret

    Jan 1, 2014

  • DFI
    Dynamic and Static Load Testing: A Cost Savings Approach

    By Thomas Hyatt, Brandon Phetteplace, Camilo Alvarez

    A test pile program was undertaken at a project site in Ain Sukhna, Egypt for an import/export oil jetty. Two 1219 mm diameter open ended steel pipe piles were evaluated at two separate test locations

    Jan 1, 2019

  • DFI
    Execution of Pile Installation in Environmentally Challenging Sites

    By Dena Morgan, Emre Biringen

    "Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t

    Jan 1, 2014

  • DFI
    Case History: Effect Of Plastic Clays On The Behavior Of APGD Piles In Central Florida

    By Amr M. Sallam

    In recent years, with the increase of the number of high-rise buildings that are proposed and being built in Central Florida especially in Downtown Orlando, Augered Pressure Grouted Displacement (APGD

    Jan 1, 2006

  • DFI
    Reducing Downdrag Loads With Bitumen

    By J. -L. Briaud

    This presentation shows the results of laboratory and field tests to date for the NCHRP project entitled "Downdrag on Bitumen-coated Piles". This project required to test a variety of bitumens in the

    Jan 1, 1991

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
  • DFI
    Numerical Study On Uplift Capacity Of Helical Pile Embedded In Clay

    By Muttharam M, Karthick Kumar V

    Helical piles foundation systems have been extensively used in engineering application. It is commonly adopted to resist the compression, uplift force, overturning moment and lateral forces. Helical p

    Nov 1, 2022

  • DFI
    Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage Barrier

    By A. David Miller, Douglas M. Barber

    "The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of indust

    Jan 1, 2015

  • DFI
    Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange Project

    By Seth H. Hamblin, Leo J. Hart, John E. Regan

    The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the

    Jan 1, 2019

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Application Of High-Strength Concrete To Drilled Shafts - 1. Summary

    By A. E. Fiorato

    A test program was conducted to evaluate use of high-strength concrete in drilled shafts (caissons). The objective of the program was to determine if internal temperatures developed during cement hydr

    Jan 1, 1991