Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Winter Marine Construction In Northern Alberta - Construction Of Baffle Walls Sundance Cooling Pond Expansion Sundance Generating Plant Wabamun, Alberta, Canada ? Introduction

    By Robert R. Morrison

    Alberta Piling Contractors very rarely are required to perform major marine construction in the prairies, so it became as a big surprise to AGRA Foundations Limited to be invited by Transalta Utilitie

    Jan 1, 1997

  • DFI
    Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:

    By Stefan K. Schwank

    The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn

    Jan 1, 1991

  • DFI
    Experimental Evaluation of Building Settlements Founded on Liquefiable Soils

    By Ramin Motamed, Farshid Ghazavi, Joseph A. W. Toth

    "Post-disaster reconnaissance of areas affected by earthquakes has documented extensive damage to buildings with shallow foundations located in liquefaction-prone areas. Currently, estimation of lique

    Jan 1, 2016

  • DFI
    Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in Malaysia

    By Chandrasegaran, Tamilmani

    "This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part

    Jan 1, 2015

  • DFI
    Ground Improvement for New Jersey Turnpike Interchange 14A: A Case Study

    By Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed

    "Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons

    Jan 1, 2017

  • DFI
    Design Build of the New NY Bridge Foundations

    By Leykam Chris J., Jacobs Scott. A.

    "Construction of the New NY Bridge over the Hudson River 25 miles north of New York City is one of the largest civil infrastructure projects presently underway in the United States (formerly Tappan Ze

    Jan 1, 2016

  • DFI
    Design Considerations For Laterally Loaded Free-Head Rigid Piles In Engineering Practice

    By O. Craciun, C. A. Bridges, M. Cai, J. Sugawara

    There are a number of methods that can be adopted for predicting the ultimate lateral resistance of a free-head rigid pile, from the conventional Brinch Hansen and Broms solutions to three-dimensional

    Nov 1, 2022

  • DFI
    Design, Modelling And Construction Of A 12-Sided Diaphragm Walled Shaft

    By Stephen Buttling

    The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc

    Nov 1, 2022

  • DFI
    Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, London

    By Shields H. Arup

    The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi

    May 1, 2022

  • DFI
    Evergreen Line Rapid Transit Project: Analysis and Design of Deep Soil Mix Panels to Mitigate Seismic Lateral Spreading

    By E. Naesgaard, Brian E. Hall, A. Amini, Advanced Geosolutions, A. Azizian

    "A 2 km section of the Evergreen Line Rapid Transit Project is supported on improved ground consisting of cement deep soil mix (CDSM) panels because of highly variable and challenging soil conditions,

    Jan 1, 2015

  • DFI
    A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in Turkey

    By Arash Khosravifar, Amalia Giannakou

    "Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d

    Jan 1, 2017

  • DFI
    Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing Program

    By William Billiet

    "The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp

    Jan 1, 2017

  • DFI
    How Choice Of Foundation Can Alter The Fate Of A Bridge Project – 3 Case Studies

    By Alok Bhowmick

    The most uncertain and challenging part of a bridge design and construction is the ‘Choice of foundation’. During the planning and conceptual design stage, it is extremely important to choose the righ

    Nov 1, 2022

  • DFI
    Best Practices for Soil Mixing Near Sensitive Structures

    By Joseph A. Mann

    "Soil mixing is a proven solution for the construction of ground improvement adjacent to sensitive structures due to the use of computer controlled and monitored equipment. The precision to which geom

    Jan 1, 2015

  • DFI
    Drivability Of Piles By Vibration

    By Don C. Warrington

    This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving

    Jan 1, 1989

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • DFI
    Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area

    By Henry H. Tayler, Eric Sturel

    1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat

    May 1, 2022

  • DFI
    130 M Deep Bored Piles – A New Superlative

    By Vijay Kumar, Serhat Baycan, Karsten Beckhans

    For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep

    Nov 1, 2022

  • DFI
    Deep Excavation for Loop Pit

    By Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De

    "This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t

    Jan 1, 2015

  • DFI
    Real Time Monitoring the Historic Old South Church, Boston, Massachusetts

    By Pierre Gouvin, Michael Oakland

    "This paper covers the rapid response methods used to monitor the emergency response to damage to an historic structure. An architectural gem, the latest incarnation of the old south Church was comple

    Jan 1, 2017