                Construction And Instrumentation Of A Deep Foundation ? SynopsisBy Y. K. Wong
This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment
Jan 1, 2010
 - 
                    
                An Unusual Permanent Shoring JobBy Gordon Demetrick
3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi
Jan 1, 1987
 - 
                    
                Load Testing High Capacity Drilled Shafts - SummaryBy Jorj O. Osterberg
Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a
Jan 1, 2002
 - 
                    
                Improvement Of The Cost-Effectiveness Of H-Bearing Piles By Using High-Strength Histar Steels. - SummaryBy Lucien P. Weber
Over the last few years, increased customer demands as well as strong competition from substitute materials have accelerated the development of advanced technologies to improve both the performance an
Jan 1, 1997
 - 
                    
                Berminghammer II 25 Vertical Travel Lead System: Innovative Technology For Deep Foundation Soil Mixing - 0.0 IntroductionBy Andy Schroeder
Located in Hamilton, Ontario Canada, Berminghammer Foundation Equipment, is a manufacturer of advanced foundation equipment with 30 years of experience. The company is represented in more than 20 coun
Jan 1, 1997
 - 
                    
                Cyclic Degradation Of Pile Foundations For Offshore Wind TurbinesBy Fabian Kirsch
Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load
Jan 1, 2011
 - 
                    
                Practical Experience With Nondestructive Testing Of Augered Cast-In-Place PilesBy Bernard H. Hertlein
All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug
Jan 1, 1997
 - 
                    
                Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) WallBy Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997
 - 
                    
                Geojet®-Turbojet® - A Deep Mixing Method For The Solution Of Geotechnical ProblemsBy Maurizio Siepi
The realisation of most of the civil engineering works is subordinate to the execution of consolidation works, in order to improve the soil physical-mechanics characteristics. The works classifiable w
Jan 1, 2002
 - 
                    
                Assessment Of The Risk Of Pile Driving To Juvenile Fish - The ProblemBy James J. Anderson
In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th
Jan 1, 1990
 - 
                    
                Response Of A Pile In Soft Clay Under One-Way Cyclic Lateral LoadingBy Padmavathi V. Sagi
In this paper, effect of cyclic loading on the behavior of a long, flexible, unrestrained vertical pile loaded laterally in soft clay is examined. For cyclic loading, the analysis is carried out usin
Jan 1, 2006
 - 
                    
                Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro ClayBy Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong
"Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al
Jan 1, 2017
 - 
                    
                Safety And Economics Of Working Platforms – A Uk PerspectiveBy David Corke
The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra
May 1, 2022
 - 
                    
                Unusual Dolphin Monopile StructureBy C. T. Christensen
The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg
Jan 1, 1989
 - 
                    
                Once Again, Engineering And Contractor Tenacity Overcome Tough GeologyBy John E. Lens
How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran
Jan 1, 2006
 - 
                    
                Unusual Solutions To Difficult Earth Retention And Underpinning Projects ? SummaryBy Larry Rayburn
Design of cost effective engineered solutions to complex problems requires the team efforts of the owner, the designer and the specialty construction contractor. The basic ingredients of success requi
Jan 1, 1991
 - 
                    
                Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load TestingBy Tatsunori Matsumoto
In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were
Jan 1, 2006
 - 
                    
                Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)By John C. Niedzielski, A. Frances Ackerman
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l
Jan 1, 2017
 - 
                    
                High Capacity Micropiles in Weak Dolomitic Limestone for Crane Foundation Support – A Case History in Temporary FoundationsBy Brian D. Barkauskas, Terence P. Holman
A major combined nuclear and coal-fired power plant, located in on the western coast of Florida has undergone multiple upgrades in recent years to increase power output and enhance environmental contr
Jan 1, 2017
 - 
                    
                Identification and Quantification of Pile RelaxationBy Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam
Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of
Jan 1, 2019