Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Influence Of Horizontal Stress On Pillar Design And Mine Layout At Two Underground Limestone Mines

    By Garth Kuhnhein

    The Black River and Maysville underground limestone mines operated by Carmeuse Lime and Stone, Inc. in northeastem Kentucky are two of the largest underground limestone operations in the United States

    Jan 1, 2004

  • SME-ICGCM
    High Capacity Tensioned Cable Bolts For Tailgate Support

    By Stephen C. Tadolini

    A joint research program was designed and conducted at Lodestar Energy?s Baker Mine to investigate the performance of a high-capacity tensioned cable supported gateroad. The secondary system consisted

    Jan 1, 2000

  • SME-ICGCM
    The Radio Imaging Method (RIM) -- A Means Of Detecting And Imaging Anomalous Geologic Structures In A Coal Seam

    By Rodger Fry

    All coal deposits contain anomalous geologic conditions which have an impact on roof control, Run-Of--Mine (ROM) coal quality and production costs. To remain competitive in today's coal market an

    Jan 1, 1984

  • SME-ICGCM
    Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal Mines

    By Matthew J. DeMarco

    Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t

    Jan 1, 1993

  • SME-ICGCM
    Longwall Mining Of Thin Seams

    By Ernest A. Curth

    An estimated 49 billion tons or 29 percent, of the coal reserve base to a depth of 1,000 feet in the eastern United States fall in the 28- to 42-inch range. Often left out as a consequence of selectiv

    Jan 1, 1981

  • SME-ICGCM
    Applications Of Reflection Seismics To Mapping Coal Seam Structure And Discontinuities

    By T. L. Dobecki

    As a means of demonstrating the effectiveness of reflection seismology in determining continuity of coal seams, three U. S. field projects are reviewed. The three projects involve coals of varied thic

    Jan 1, 1981

  • SME-ICGCM
    Stress Analysis and Support Design for Longwall Mine-Through Entries (A Case Study)

    By Keith Heasley

    An eastern longwall mine was required to mine through a set of three entries located midway down the length of a panel. Of course, the mine desired to design a successful support system for the mine-t

    Jan 1, 2003

  • SME-ICGCM
    Renewed Interest In Prop Supports As A Replacement For Wood Cribs

    By Thomas M. Barczak

    Wood cribs have been the dominant form of supplemental support in coal mining for many years. Recently, there has been a renewed interest in prop supports as a replacement for wood cribbing due to the

    Jan 1, 1995

  • SME-ICGCM
    Ground Control Technology for Mass Exploitation of Coal Deposits with Continuous Miner: A Review of the Indian Scenario

    By Sanjay Kumar Singh

    This paper presents ground control technology associated with a continuous mining operation for mass exploitation of underground coal deposits in the Indian coal mining Industry It shows that competen

    Jan 1, 2011

  • SME-ICGCM
    Weak Claystone Floors And Their Implications To Pillar Design And Settlement (e297de16-ba6b-46bd-8383-22a15beca7b5)

    By Ross W. Seedsman

    The in situ behaviour of claystone floors associated with the Wallarah, Great Northern and Fassifem Seams has been studied using a comprehensive suite of stress and displacement monitors. The instrume

    Jan 1, 1992

  • SME-ICGCM
    Laboratory Strength Testing of Coal from Selected Illinois Seams

    By E. Bane Kroeger

    For many years, researchers around the world have been investigating coal pillar stability. Many have focused on trying to optimize the size of the pillars by examining stable and failed pillars in un

    Jan 1, 2004

  • SME-ICGCM
    Statistical Characterization Of Coal-Mine Roof Failure: Suggestions And Case Study

    By Alan D. Smith

    [A standardized checklist in a questionnaire format, was established to investigate selected factors associated with coal nips roof falls, as derived from an intensive review of the literature. A plot

    Jan 1, 1984

  • SME-ICGCM
    Development and Testing of a New Roof Prop

    By E. Bane Kroeger

    In underground coal mining, there is often a need for supplemental support for mine openings. In the past, one of the most common types of supplemental support was wooden posts that were installed aga

    Jan 1, 2005

  • SME-ICGCM
    Determining Horizontal Stress Direction Using The Stress Mapping Technique

    By T. P. Mucho

    Mine roof failure due to excessive horizontal stress has been recognized as a major cause of hazardous roof conditions in some mines. Stress measurements gathered by the U.S. Bureau of Mines (USBM) at

    Jan 1, 1994

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    A Model Of Shield-Strata Interaction And Its Implications For Active Shield Setting Requirements

    By Thomas M. Baraak

    This paper evaluates factors which influence longwall support and strata interaction. The longwall system is composed of an immediate and main roof structure and three supporting foundations: 1) longw

    Jan 1, 1990

  • SME-ICGCM
    Resin-Grouted Cables For Longwall Tailgate Support Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines (USBM) is conducting research to provide alternatives for traditional secondary support methods. These cost-saving methods are proving to afford safer installation, improve en

    Jan 1, 1994

  • SME-ICGCM
    Mining Under Rivers In Fuxin Coal Mines

    By Liang Yin-Huai

    In Fuxin Coal Mines, there are more than 20 million tons of coal buried under seasonal streams. The coal seams are mostly shallow. We have mined more then 50 mining blocks distributed in 5 coal mines.

    Jan 1, 1990

  • SME-ICGCM
    A Case History Investigation of Two Coal Bumps in the Southern Appalachian Coalfield

    By David Newman

    The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera

    Jan 1, 2002

  • SME-ICGCM
    Investigation Of Subsidence Event Over Multiple Seam Mining Area (b421bdde-19e7-491b-bc6d-a4cce9ef42b4)

    By Kewal K. Kohli

    An investigation was performed to determine the sequence of events which caused the 1987 surface subsidence and related damage to several homes in Walker County, Alabama, USA (see Figure 1). Surface a

    Jan 1, 1992