Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Investigating the Contributing Factors to Rib Fatalities Through Historical Analysis

    By Tristan H. Jones

    Rib-related accidents in underground coal mines continue to cause injuries and take lives at a rate of 1.3 fatalities per year for the last 17 years. Prevention of these accidents cannot simply be a m

    Jan 1, 2014

  • SME-ICGCM
    In Situ Stress Measurement and Stress Change Monitoring in a Longwall Mine to Monitor Overburden Caving Behaviour and to Design a Hydraulic Fracture Treatment Program

    By Rob G. Jeffrey, Ken W. Mills, Jesse W. Puller

    "A coal mine in New South Wales is longwall mining 300m wide panels at a depth of 160-180m directly below a 16-20 m thick conglomerate strata. As part of a strategy to use hydraulic fracturing to mana

    Jan 1, 2015

  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Ribs (da729951-bd49-415c-b364-03a4e38bfd9c)

    By Michael Murphy, Khaled M. Mohamed, Berk Tulu

    "Failures of coal ribs are major hazards in underground coal mines. For the period of 2010 to 2014, rib falls were the leading cause of groundfall fatalities and accounted for 35% of all groundfall-re

    Jan 1, 2016

  • SME-ICGCM
    Safe, Efficient, and Cost-Effective Support of Longwall Cut through Entries

    By John R. Poland, Benjamin Mirabile

    "There are significant ground support hazards to both personnel and equipment when longwall equipment must mine through cross-panel entries. Backfilling support strategies are often cost prohibitive.

    Jan 1, 2016

  • SME-ICGCM
    Study of the Backfill Confined Consolidation Law and Creep Constitutive Model under High Stress

    By Zhikai Wang, Wensheng Lyu, Peng Yang

    "To better understand the mechanical behavior of the compression deformation of backfill under high stresses corresponding to large depths, consolidation compression tests were performed for cemented

    Jan 1, 2017

  • SME-ICGCM
    Challenges of Mining the First Right-Handed Longwall Panel in a New Reserve Block in Pittsburgh Seam

    By Jun Lu, Greg Hasenfus

    "In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh seam are introduced. The longwall headgate T-junction experienced very high face conver

    Jan 1, 2018

  • SME-ICGCM
    Evaluation of Potential Impacts to Stream and Ground Water Due to Underground Coal Mining

    By Jimenez Leon, Christopher Newman, Boede Gabriel, Zacharias Agioutantis

    "Ground movements due to longwall mining operations have the potential to damage the hydrological balance within as well as outside the mine permit area in the form of increased surface ponding and ch

    Jan 1, 2016

  • SME-ICGCM
    Roof Stability Issues in Underground Limestone Mines in the United States (c7025d3b-53e9-40eb-abd5-d6a28b7f51f3)

    By Gabriel Esterhuizen

    The room-and-pillar mining method is used extensively in underground limestone mines in the Eastern and Midwestern U.S. The rock mass is typically a near-horizontal, bedded deposit at relatively shal

    Jan 1, 2007

  • SME-ICGCM
    Roof Bolter Synthetic Mesh Handling System

    By Jonathan Duncan, Tim Burgess, William Kendall, Jens Lange

    "Steel wire mesh is the accepted standard for roof and rib skin control at most coal mines in the United States. Wire mesh is delivered to the mine in bundles that are heavy and awkward to handle. The

    Jan 1, 2010

  • SME-ICGCM
    Biaxial Horizontal Swelling Strains in West Virginia Coal Mine Roof Rocks in Response to Moisture Adsorption

    By Monte R. Hieb

    Study of moisture-induced swelling strain in Pennsylvanian Period rocks of the Appalachian Plateau in West Virginia shows a 2:1 biaxial horizontal anisotropy which trends NW-SE. Oriented in-situ slabs

    Jan 1, 2013

  • SME-ICGCM
    Calibrating a Caving Model for Sedimentary Deposits-estimation of Load Distribution between Gob and Abutment

    By Thierry Lavoie, Mark K. Larson

    "Engineers at the National Institute for Occupational Safety and Health (NIOSH) and Itasca Consulting Group, Inc., conducted a study to determine the procedure for calibrating a caving model implement

    Jan 1, 2016

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • SME-ICGCM
    Investigation of the Stability of a Pillar Retreat Section at the Fletcher Mine

    By Doug Tesarik

    Researchers from the National Institute for Occupational Safety and Health1 (NIOSH), together with employees from The Doe Run Company, are monitoring and evaluating the stability of a pillar retreat s

    Jan 1, 2006

  • SME-ICGCM
    Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar Mining

    By Guo Wenbing

    "INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody

    Jan 1, 2015

  • SME-ICGCM
    Ground Response to High Horizontal Stresses during Longwall Retreat and its Implication on Longwall Headgate Support

    By Peter Zhang, Daniel Su, Essie Esterhuizen, Mark Van Dyke, Berk Tulu, Dave Gearhart

    "Roof falls in longwall headgate can occur when weak roof and high horizontal stress are present. To prevent roof falls in the headgate under high horizontal stress, it is important to understand the

    Jan 1, 2018

  • SME-ICGCM
    3D Modelling of Mine Backfill

    By Muhammad Zaka Emad, Rangzeb Goraya, Muhammad Usman Khan

    "Numerical modeling has been used extensively to assess the stability of surface and underground mines. Tabular, steeply dipping ore bodies are generally mined out by open stoping methods with delayed

    Jan 1, 2017

  • SME-ICGCM
    Application of Thin Spray on Liner (Masterseal) at Longwall T-Junction Sections in German Hard Coal Mines

    By Uwe Wyink, Guenther Thiele, Isabel Gollnick, Klaus Thyrock

    "The application of a thin spray on liner was implemented in longwall T-junction sections in 2009 for the first time. The development of the material and the application is based on a technical cooper

    Jan 1, 2010

  • SME-ICGCM
    Research on Coal and Gas Outburst Dynamic System

    By Chaojun Fan, Du Wenzhang, Sheng Li, Hong-Hong Shi

    "Coal and gas outburst is an extremely complex dynamic disaster in coal mine production process which will damage casualties, equipment facilities and disorder the ventilation system by suddenly eject

    Jan 1, 2016

  • SME-ICGCM
    Risk Assessment of Surface Fracture Endangered Ranges Over Shallow Mine Workings

    By Peter Fischer, Heinz-Jiirgen Kateloe, Anton Sroka, Axel Preusse

    "Since mining in Germany has a long history, there are still many locations where the surface fracture problem has to be solved. Shallow mine workings from an earlier era can affect the surface in a d

    Jan 1, 2010

  • SME-ICGCM
    Roof-Pillar Interface Affecting the Pillar Behavior

    By Andre Cezar Zingano

    "The empirical approach for pillar design assumes that geological conditions should be perfect, such as horizontal seams, and that pillar strength and behavior will only depend on the coal seam streng

    Jan 1, 2016