Effect of Yield Strength on Wear Rates of Railway WheelsBy J. W. van der Merwe, A. S. Bolokang, M. J. Phasha, V. J. Matjeke, C. Moopanar
"Excessive wear rates on railway wheels can result in rolling-stock derailments. If wear is detected early the possible derailments can be prevented by prematurely replacing wheelsets, although the in
Jan 1, 2016
-
LHD optimization at an undergroundchromite mineBy W. Mbhalati
"Conzal Mine was not meeting production targets in 2013, and it was established that this was caused by the inability of the load haul dump machines (LHDs) to tram the required tonnages. An investigat
Jan 1, 2015
-
Trends in Productivity in the South African Gold Mining IndustryBy T. Tholana, P. N. Neingo
"Mining companies globally are currently facing severe economic and financial challenges. In addition to global challenges, the South African mining industry has to face other operational challenges t
Jan 1, 2016
-
Mathematical Solutions To The Multiple-Fan Ventilation SystemsBy S. Sarac
In this study, graphical and mathematical methods used to determine operating points in single or multiple fan ventilation systems are summarized. The problem is mathematically formulized for parallel
Jan 1, 2000
-
Practical Method for Measuring Anisotropy of Rock Using a Hollow CylinderBy K. Shin
Determining the anisotropy of rocks has in the past been difficult and rarely attempted in engineering practice. Here we have developed a new practical methodology for measuring orthotropic anisotro
Jan 1, 2003
-
Strength, Deformability, and Micromechanics of Brittle Fracture in a Crystalline Rock Under True Triaxial Compressive StressesBy B. Haimson
A new loading apparatus was fabricated and used to conduct true-triaxial compression tests on KTB amphibolite, a crystalline basement rock. Tests in dry jacketed samples reveal that the intermediate p
Jan 1, 2003
-
The Design Of Stable Pillars In The Bushveld Complex Mines: A Problem Solved? - SynopsisBy D. F. Malan
This paper gives an overview of the difficulties associated with determining the strength of hard-rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re
Jan 1, 2011
-
Bindura Nickel Smelter - From Decommissioning, Care And Maintenance, To Plant Re-StartBy A. Mboma
Keywords: Furnace, decommissioning, care and maintenance, re-start, funding, nickel Bindura Nickel Corporation (BNC) operates two nickel mines, and treats concentrates from these mines as well as
Jan 1, 2011
-
Bord And Pillar Applications On The Platinum Mine: T-Cut Mining MethodBy C. C. Oosthuizen
Paper written on project work carried out in partial fulfilment of Technikon Practical Training Frank shaft is mining both Merensky reef and UG2 reef. The Merensky orebody is almost depleted and th
Jan 1, 2005
-
Seismology And Slope Stability In Open Pit MinesBy R A. Lynch, D A. Malovichko
The implementation of routine real-time micro-seismic monitoring of open pit mine slopes has been discussed. Some examples of seismic arrays have been given, and a recommendation of suitable seismic
Jan 1, 2006
-
Management of the Nkomati Mine Crusher Slope FailureBy R. Armstrong
Due to limited available level ground, Nkomati Nickel Mine cut a weathered rock slope at the base of a mountain spur in order to create a platform for construction of the primary crusher plant and run
Jan 1, 2014
-
Improvement of the Cobalt Process at the Chemicals of Africa (Chemaf) Usoke Plant – Effect of Seed RecycleBy Jo Katembo, Patty Bwando, Patient K. Ilunga, Yves Kalubi, Emman Mulaj
"From 2010, the dolomite concentration in the ore fed to the Usoke Plant increased, resulting in a significant increase in the gangue acid consumption and Mg build-up in the circuit, and thus an incre
Jan 1, 2015
-
The Distribution Of Metallic Elements In Granulated Nickel Converter Matte PhasesBy E. L. Thyse
Keywords: Pyrometallurgy, converter, nickel, matte, distribution Metallic elements occupy a wide range in granulated nickel converter matte phases. The distribution of these metallic elements, pa
Jan 1, 2011
-
Process mineralogy: adding the value in the minerals value chain, D. ChettyBy D. Chetty
Process mineralogy forms an integral part of geometallurgy, with ore body characterisation being but one piece of the puzzle in optimising value derived from ore. This value is not only financial, but
Jan 1, 2020
-
Peak particle velocity prediction using support vector machines: a surface blasting case studyBy S. R. Dindarloo
Although blasting is one of the most widely used methods for rock fragmentation, it has a major disadvantage in that it causes adjacent ground vibrations. Excessive ground vibrations can cause a wide
Jan 1, 2015
-
Microstructure Evolution In Ti-6Al-4V Alloy During Hydrogen Dosing At Elevated Temperature - SynopsisBy L. A. Matthews
The embrittlement of the Ti-6Al-4V alloy by hydrogen dosing at elevated temperature has been investigated. Metal coupons were subjected to isothermal treatments in a partial hydrogen atmosphere in the
Jan 1, 2011
-
Development And Demonstration Of Oxy-Fuel CFB Technology - SynopsisBy A. Hotta
Reduction of CO2 emissions is the key driving force behind the development and implementation of new solutions for energy production. One solution is circulating fluidized bed (CFB) combustion technol
Jan 1, 2012
-
Spontaneous combustion risk in South African coalfieldsBy B. Genc
"The risk of spontaneous combustion is well known in the South African coal mining industry. In the coming years it is very possible that the incidence of spontaneous combustion will increase from cur
Jan 1, 2015
-
Modeling of factors influencing the extent of mud infiltration in a fractured rock massBy C. Tan, C. Detournay
Wellbore stability is a major concern for drilling in naturally fractured formations. The infiltration of drilling mud into the fractures is a factor, which may compromise wellbore integrity due to t
Jan 1, 2003
-
Variance Propagation In Toll Smelting Operations Treating Multiple Concentrate StockpilesBy C. J. Cutler
Metallurgical accounting for toll treatment smelters pose a number of challenges. Multiple feed stockpiles have to be accounted for as part of the monthly recovery estimation. Moreover, multiple metal
Jan 1, 2006