Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Drill and Blast Trial Planning During Drill-Mill Optimization ProjectBy Tristan Worsey, John Henchion, Nathan Rouse, Yannick Lauras
"This paper presents an approach used to plan and evaluate drill and blast trials for a mine that currently mechanically excavates in-situ rock. The document presents the approach used to plan the tri
Jan 1, 2017
-
Application of Underground Pre-Splitting in Butte, MTBy M. Gebhardt, J. Johnson, S. Rosenthal
The use of presplitting applications in an underground mine setting is a method of reducing overbreak in the rib and back when blasting occurs. Presplitting performed at the Underground Mine Education
Jan 1, 2024
-
Floor Blasting for Establishment of a New Crusher in Underground Limestone MineBy Chris Searing
An underground room-and-pillar limestone mine in Western Missouri acquired a new primary crusher, physically larger in every dimension than the unit it replaced. Due to the space constraints within th
Feb 6, 2023
-
Development of Scaled Damage Criteria for BlastingBy Jorge Alvarez
In a large-scale open-pit mining operation, continuous efforts are made to control damage to the slope walls. An essential tool in this effort is determining the PPVc (critical peak particle velocity)
Jan 21, 2025
-
Digital Signal Processign Applied to SeismologyBy Thad M. Jones
This paper considers the sampling, digitizing and reconstruction of seismic signals. A sampling frequency range is proposed and a minimum limit is suggested. Digitizing precision criteria for both pea
Jan 1, 1985
-
Stope performance optimisation through the introduction of new underground bulk explosives technologyBy S. Evans, J. Phillips-White, D. Morton
The partnership between Orica and MMG at the Dugald River Zinc mine in Australia has led to the first global field trials and deployment of Orica’s Subtek™ 4D™ (hereafter referred to as 4D) Bulk Syste
Jan 1, 2024
-
Computer Modelling of Bench Blasting for Grade ControlBy Lindsay Wade, Peter Dare-Bryan
Benches in surface mines often contain known areas of ore and known areas of waste, which must be mined selectively. When rock is blasted it not only fragments but is also physically, and non-uniforml
Jan 1, 2001
-
Causes and Recommendations for Controlling Coal Damage When Blasting OverburdenBy R Frank' Mammele Chiappetta, Conny Postupack
A major problem that has continued to plague the surface coal industry is blast induced damage to the coal seam. Atlas Powder Company has addressed this situation through seven years of field research
Jan 1, 1988
-
Numerical simulation of blast demolition for steel constructionBy Y Wada, Y Ogata, T Nishida
"Shaped charge is used for blast demolition of steel construction in general. It is important tocontrol movement of cutting part with shaped charge for the blast demolition of steel construction.Movem
Jan 1, 1999
-
Electronic Detonator Performance Evaluation Barrick Goldstrike Mines Inc. (2002 International Society of Explosives Engineers)By Roy McKinstry
In March of 2001, Barrick Goldstrike became the first surface gold operation in North America to evaluate the advantages of electronic detonators. A detailed study was conducted to quantify the benefi
Jan 1, 2002
-
Displacement and Mixing of Blasted Sedimentary Rocks in QuarryingBy Stephen Chung, John Carpenter, Scott Gosch, James Breedlove
While controlling fly rock and ground vibration in quarrying in the neighborhood of a residential area, producing good fragmentation and keeping different grades of material separated in a muckpile ar
Jan 1, 2001
-
Influence of Fragmentation on the Loading and Haulage Operations: A Stochastic ApproachBy Francisco Leite, Tomi Kouvonen, Bianca Saraiva, Vinicius Miranda, Auã Oliveira
One of the main challenges facing mining engineers is to draw up a plan that can be implemented in a timely manner, taking into account the operational variability of the mine’s production processes.
Feb 6, 2023
-
Evaluation of the Fragmentation Size Distribution Resulting from Blasting as Derived from Basic PrinciplesBy Roger Favreau, Patrice Favreau
The article reviews the aspects which contribute to the quality of the results from a blast with explosives, namely a good floor, no large blocks, easy mucking, and explains the mechanisms of the blas
Jan 1, 2012
-
Prototype gauges for measuring detonation temperature and pressure of commercial explosivesBy A. Torrance
A better understanding of the detonation performance of an explosive charge can be gained by directly measuring pressure, temperature and velocity of detonation (VOD). This is particularly important w
Jan 1, 2011
-
ICI's Computer Blasting Model SABREX - Basic Principles and CapabilitiesBy J P. Tidman, I J. Kirby, G H. Harries
The SABREX computer model is based on the fact that both shock waves and gas pressure are important in describing a blast. The treatment of explosive-rock interactions includes the influence of non-id
Jan 1, 1987
-
Using Machine Learning and Novel Algorithms to Predict Muckpile Shape and Throw to Engineer a Perfect BlastBy Ravi Sahu, Brad Gyngell, Oktai Radzhabov
Design machine learning approach to simulate the process of muckpile throw distribution before blasting.
Feb 1, 2020
-
Journal: 100 Years / DRIVING HEADINGS IN ROCK TUNNELS Transactions of the American Institute of Mining Engineers New York 1910By W. L. Saunders
RBH Note: In the early days of drill & blast tunneling the jobs utilized large crews of drillers and muckers. Advance per round was limited (typically around four feet) but two rounds per 8-hour shift
Jan 1, 2011
-
Ionomer Resins for Higher Performance Shock Tubes in Open Pit Mining ApplicationsBy K. Hausmann, P. A. Sashin, G. J. Prejean
Misfires caused by unreliable shock tube constructions can have significant cost implications and place field workers at serious risk during remediation. Ionomer materials, used as a subtube in shock
Jan 1, 2011
-
Feasibility of Applying Probabilistic Risk Assessment to TerrorismBy Natalie Zeleznik, Brian Hawkins, David Bradley, Rachel Gooding, Patrick Wilson
"The United States (U.S.) Department of Homeland Security (DHS) Directorate of Science and Technology (S&T), utilizes a probabilistic risk assessment (PRA) approach to explore the risks (anduncertaint
Jan 1, 2017
-
Preblast Surveys and a Look at Today's Seismographs: A General LookBy Randall M. Wheeler
Pre-blast surveys are used to document the condition of a structure prior to the commencement of blasting activities. They provide the best means of determining the pre-existence of visible cracking a
Jan 1, 1992