The Challenges Of Construction In Karstic Limestone: Three Major Case HistoriesBy Donald A. Bruce
The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si
Jan 1, 2002
-
Soil Improvement Through Rammed Aggregate Piers To Mitigate Liquefaction Risk In Storage TanksBy Francisco A. Flores, José L. Aguirre, Héctor A. de la Fuente, Erika Bernal, Jorge Arroyo-Esquedla
This paper presents the analysis, design, and construction of soil improvement for storage tanks foundation support at a site in Tabasco, Mexico. A total of 980 Rammed Aggregate Piers of 12.5 m in len
Oct 1, 2022
-
Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction PlantBy Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Interstate 70 Construction Through Glenwood Canyon, Colorado - Glenwood Canyon ConstructionBy Ray Schmahl
The Glenwood Canyon is a 13 mile long river gorge formed by the Colorado River approximately 2 miles East of Glenwood Springs, Colorado and approximately 150 miles West of Denver Colorado, (See Drawin
Jan 1, 1990
-
-
Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, MaineBy James W. Weaver
The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea
Jan 1, 2011
-
Atoka Pipeline - Canadian River CrossingBy Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
Behaviour Of Piled Raft- Importance Of Observational StudyBy Abhirami B., V. Balakumar
Piled raft foundation system is an intelligent geotechnical concept, developed towards reducing the settlement of the raft and the footings by providing pile elements below the raft or footings, as th
Nov 1, 2022
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And MeetingBy Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NYBy Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht
The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou
Jan 1, 2018
-
Slurry Wall Design For Hong Kong StationBy Stephen T. Young
The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ
Jan 1, 2003
-
Ground Improvement for New Jersey Turnpike Interchange 14A: A Case StudyBy Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed
"Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons
Jan 1, 2017
-
Best Practices for Soil Mixing Near Sensitive StructuresBy Joseph A. Mann
"Soil mixing is a proven solution for the construction of ground improvement adjacent to sensitive structures due to the use of computer controlled and monitored equipment. The precision to which geom
Jan 1, 2015
-
Aseismic Bearing Capacity Of Pile Foundation ? SynopsisBy J. X. Wu
An investigation on the seismic damage to buildings with pile foundations in Tianjin region, was conducted after the earthquake which hit Tangshan in 1976. It showed that most pile-founded buildings h
Jan 1, 2010
-
Approach Wall Foundations Olmsted Locks And Dam Project ? SummaryBy Jeffrey A. Schaefer
The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe
Jan 1, 2001
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Design And Construction Aspects Of A Deep Basement In Dublin - SynopsisBy Philip J. Daynes
As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase
Jan 1, 2003
-
History Of Chicago Foundation Systems & Underground Construction ? SummaryBy Theodore R. Maynard
The history of foundation engineering in Chicago is a tale of innovation, made necessary in order to keep pace with structural technology which allowed taller buildings with heavier bearing loads, to
Jan 1, 1991
-
Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility TunnelBy Amit Srivastava, Monica Malhotra
In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through
Sep 1, 2022