Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies
By David H. Tang
Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite
Jan 1, 1990
-
Intrinsic Response Of Borehole Pressure Cells Laboratory Calibration And Nonlinear Fem Simulation
By D. Su
This paper presents the details and results of a preliminary investigation into the response of borehole pressure cells (BPCs) in soft coal. Two parallel approaches, laboratory calibration and nonline
Jan 1, 1990
-
Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries
By John Popovich
The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc
Jan 1, 2001
-
Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining Method
By Jin He
Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining
Jan 1, 2006
-
Cavability Study Of A Competent Roof - A Case Study
By T. N. Singh
An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.
Jan 1, 1994
-
Five Stress Factors Conducive To Bumps In Utah, USA, Coal Mines
By Joe F. T. Agapito
High stresses and adverse geology in deep coal mines in the state of Utah, USA, have caused numerous bumps. The larger bumps have been associated with seismic events with Richter magnitudes of 3.6 and
Jan 1, 2000
-
Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-Review
By Frank E. Chase
During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga
Jan 1, 2006
-
Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine
By Collin Stewart
Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall
Jan 1, 2007
-
The Influence of the First Layer Thickness of Immediate Roof on its Stability
By Lixun Kang
Bedded structure is the characteristics of coal measures strata. Bedding planes, coal streaks and soft rock bands existing in roof strata destroyed its continuity in the direction perpendicular to the
Jan 1, 2005
-
Yield Pillar Applications--Impact On Strata Control And Coal Production
This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Ultra-Close Multiple-Seam Mining ? Analysis and Verification
By Daniel W. Su
This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int
Jan 1, 2012
-
Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control Issues
By Michael Kelly
Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ
Jan 1, 2005
-
In-Situ Coal Strength Determination - Case Studies
By Kot F. Unrug
Strength of coal is one of the governing factors in size determination of mine pillars, and therefore affects the percentage of extraction and thus, utilization of reserves. Coal strength is also impo
Jan 1, 1995
-
STRATA III ? A Full-Spectrum Roof Control Concept
By John H. Perry
Strata III is a full-spectrum roof control system which provides the mine operator the ability to upgrade his roof control in place. The procedure is easily adaptable with current roof bolting techniq
Jan 1, 1987
-
Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield Pillars
By M. P. Nesterov
The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.
Jan 1, 1998
-
The Initial Collapse of the Overburden Over Longwall Panels
By Gennaro Marino
Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing
Jan 1, 1987
-
Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And Strata Measurements Of Yield And Abutment Pillars
By J. Brasfield
Jim Walter Resources, along with the Rock Mechanics Branch of British Coal and Strata Control Technology Pty. Ltd., is presently studying the yield-stable-yield pillar design in use at the Blue Creek
Jan 1, 1994
-
Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)
By Frank E. Chase
The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar
Jan 1, 2005
-
Optimun Mining Plan for Multiple Seam Mining
By Wen H. Su
Multiple seam mining and its associated problems are very serious in Southern West Virginia where poor planning or lack of knowledge in seam interaction often results in complete loss of coal propert
Jan 1, 1984
-
FlexKnot: An Innovation in Roof and Rib Surface Control
By Anand Bhagwat
Surface control can prevent the falls of ground between primary roof support systems and rib support. Using existing industrial products, and adopting them for mining applications, has historically at
Jan 1, 2014