Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Increasing Lateral Pile Stiffness Through Limited Soil Improvement

    By Thomas J. Weaver

    Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat

    Jan 1, 2006

  • DFI
    Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their Analyses

    By Eiji Kojima

    In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn

    Jan 1, 2006

  • DFI
    Behavior Of PCC Pile Under Lateral Load

    By Zhitao Ma

    The Cast-in-place Concrete thin-wall Pipe pile, referred to as PCC pile, is a new kind of pile for soft ground improvement. In this paper, firstly, the general introductions of the new pile technique,

    Jan 1, 2006

  • DFI
    The Contest On The Prediction Of Capacity Of A Bored Pile Constructed Under Polymer-Based Slurry In Bangkok Subsoil

    By Narong Thasnanipan

    This paper presents the outcome of the contest on the prediction of the static axial load capacity of diameter 1.20m bored pile founded at 46m below existing ground. The test pile was constructed by w

    Jan 1, 2006

  • DFI
    Resistance Factors For Lateral Design Of Drilled Shafts Supporting Sound Walls

    By Ke Yang

    Drilled shafts are widely used as foundation system for sound walls to resist lateral loads. The design method based on the ultimate lateral capacity, such as Broms method, is often used for sound wal

    Jan 1, 2007

  • DFI
    Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing

    By Rolf Katzenbach

    Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we

    Jan 1, 2007

  • DFI
    Application Of PCC Piles On Soft Ground Improvement Of Expressways

    By Hanlong Liu

    The construction process and load-bearing behaviors of Cast-in-place Concrete Thin-wall Pipe Piles are analyzed based on its application on Yan-Tong Expressway project. The low strain test, static loa

    Jan 1, 2006

  • DFI
    Converse Probabilistic Analysis And Testing In Situ For Bed Rock Under Pile With Large Diameter

    By Peng Jiahong

    With ultrasonics application during checking the large diameter cast-in-situ pile body, it is usualy applied the statistical method of probability and PSD. This paper presents a converse probabilistic

    Jan 1, 1991

  • DFI
    Horizontal Resistance Behavior Of Pile With Wings In Sand

    By Wen Songlin

    This paper presents an experimental program to investigate the behavior of a pile with wings under horizontal loads in sand at laboratory. The work focused on evaluating the lateral resistance behavio

    Jan 1, 2007

  • DFI
    Report On An Instrumented Continuous Flight Auger Test Pile At Ascot.

    By Peter O. Wilkinson

    Ascot Racecourse in the UK is a major international venue for horseracing. The racecourse is being redeveloped to provide entirely new public facilities. The development includes the construction of a

    Jan 1, 2006

  • DFI
    Pile Integrity Testing In The Netherlands

    By Peter Middendorp

    Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int

    Jan 1, 2006

  • DFI
    2D And 3D Analysis Of New Austrian Tunnelling Method

    By G. R. Dasari

    New Austrian Tunnelling Method (NATM) has been analysed by Finite Element method in two and three dimensions by Strain Dependant Modified Cam Clay (SDMCC) Model. The effects of construction sequence,

    Jan 1, 1996

  • DFI
    New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)

    By R. Bruce Patterson

    The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H

    Jan 1, 2004

  • DFI
    A Contribution To The Behaviour Of Piled Raft Foundations

    By H. L. Jessberger

    In recent years piled raft foundations of multi-storey buildings on weak soils have generated much interest and discussion. By taking account of the effects of each component of the system - the pile

    Jan 1, 1991

  • DFI
    Defective Piles In Clay - Synopsis

    By S. Narasimha Rao

    Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin

    Jan 1, 1996

  • DFI
    Settlement Of A Building After Cutting Off Pile Tips Due To Tunnelling

    By Richard A. Forth

    During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor

    Jan 1, 2002

  • DFI
    Predication Of Heave For Deep Excavation With Irregular Plane Shape

    By Zhang Jiaju

    For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method

    Jan 1, 1991

  • DFI
    Evaluation Of Pile Foundation Design Methods Using Load Tests

    By SungWon Park

    The efficiency of the current design methods for computing pile resistances is evaluated using field load-settlement tests results. Twelve load-settlement test data for drilled shafts and bored piles

    Jan 1, 2009

  • DFI
    Interlocking Caisson Walls

    By William E. Lardner

    Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi

    Jan 1, 1987

  • DFI
    Resonant Pile Driving - Part I - The Promise & The Reality - Part II - Soldier Pile Installation - Light Rail Transit - Buffalo, New York - 1. Historic Background.

    By D. R. Dance

    The Resonant, or as it has more commonly come to be known the 'Sonic' Pile Driver, dates back to the early 1960's, when prototypes were produced by Charlie Guild, of Providence, Rhode I

    Jan 1, 1987