Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
PSC Piles Overcome Challenges for $650m Power PlantBy Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
-
Recycled Polymer Application During Pile Boring Operations: A ReviewBy Hitendrabhai S. Dewangan, Dr. Aashish A. Mehta
Pile foundation is widely used in construction of marine structures. In offshore & marine piling work, drilling/boring supporting fluid is used to stabilize the borehole (excavation) prior to tremie c
Sep 1, 2022
-
Marine Clay Stabilisation Using An Encased Stone Column With Tyre Chips As AggregatesBy Rangaswamy. K, Naga Sivaji
A stone column is one of the most commonly employed methods of ground improvement techniques. This method used to increase the strength, decrease the compressibility of loose granular and finegrained
Nov 1, 2022
-
The Underwater Cut-Off At The Walter F. George DamBy Gianfranco Di Cicco
Seepage problems were recorded for more then 40 years at the Walter F. George lock and dam. In 2001 the Mobile district of The U.S. Army Corps of Engineers turned to the installation of a 200 feet dee
Jan 1, 2013
-
Numerical Study On Behavior Of Unreinforced And Reinforced Disconnected Piled Raft FoundationBy P. Seethalakshmi, Yatakuri Yaswanth Naidu
The use of a single pile, group of piles with pile cap, piled raft foundation system, etc., are prevalent in transferring the superstructure load from the soft soil layers to the firm underground laye
Sep 1, 2022
-
D?Appolonia - Recommended Specifications For The Design Of Foundations, Retaining Walls And Substructures - Final Report Prepared For National Cooperative Highway Research Program Transportation Research Board National Research Council - 4.5 Drvn Pls4.5.1 General The provisions of the article shall apply to the design of axially and laterally loaded driven piles in soil or extending through soil to rock. 4.5.1.1 APPLICATION (Revised Article
Jan 1, 1989
-
Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic TestingBy Achyut Kumar Allady, Praveen Arumughan
NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza
May 1, 2022
-
Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s PerspectiveBy A. David Miller, Chika Oya
"Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi
Jan 1, 2017
-
Bentonite Self-Hardening Slurry Mix Variations and Field Implementation MethodsBy Christopher R. Harris
"Considerations are presented for developing and implementing self-hardening slurry mix designs to be utilized in barrier seepage walls. Slag-cement-cement-bentonite (SCCB) slurries are the primary fo
Jan 1, 2016
-
Soil Cement Tensile Strength and Modulus as a Function of Unconfined Compressive StrengthBy Dominic Parmantier, Jason Page
"In the past, the designers of DSM have analyzed various failure modes and then specified a minimum unconfined compressive strength (UCS) for the soil-cement. The specified minimum UCS reflected the c
Jan 1, 2015
-
Bearing Capacity of Semi-Deep Skirted FoundationsBy Abolfazl Eslami, Samieh Rezazadeh
"Semi-Deep skirted foundations are considered to be a viable option for a variety of onshore and offshore applications. It is necessary to determine appropriate foundation configurations that allow lo
Jan 1, 2017
-
Overview Of Enabling Works For Waterfront Structures – Design & ConstructionBy Nagarajan. D, Raja Rajan. K, Vijayakumar. T
Major bridges crossing mighty rivers must be constructed in flowing water. Constructing the sub-structure in water has been a challenging job for contractor. Special construction techniques with marin
Nov 1, 2022
-
Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier WallsBy R. Lee Wooten, David R. Shields, Darren D. Clark
"Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con
Jan 1, 2016
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? IntroductionBy Dhanvin B. Mehta
Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica
Jan 1, 1996
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and MaintenanceBy Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2017
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2015
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley MineBy Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil MixingBy James Coull, Brian Wilson, David Siddle
"In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica
Jan 1, 2017