                     Construction Of Large Open Caissons In Soft Stratum Construction Of Large Open Caissons In Soft StratumBy Chen Zhiquan Author has exhaustively researched into soft ground through construction of a large open caisson on soft ground (muck) which weighs more than 4, 000 tons. To avoid any contingency during construction, Jan 1, 1991 
- 
                     Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical Consultant Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical ConsultantBy Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur May 1, 2022 
- 
                     John F. Kennedy Airport Site Redevelopment: Tapertube Pile Foundation John F. Kennedy Airport Site Redevelopment: Tapertube Pile FoundationBy Gisele R. Passalacqua, Aly Mohammad, Joanna Smith The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased 
- 
                     Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis "No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca Jan 1, 2017 
- 
                     Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee Dam Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee DamBy Glen R. Andersen "Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is Jan 1, 2017 
- 
                     Thirty Years of Experience with the Wave Equation Solution Based on the Method of Characteristics Thirty Years of Experience with the Wave Equation Solution Based on the Method of CharacteristicsBy Peter Middendorp, Gerald E. H. Verbeek "This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o Jan 1, 2005 
- 
                     Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current PracticeBy Jim Slatter, Ben Collingwood "It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali Jan 1, 1900 
- 
                     Cutter Soil Mixing Solutions at the Leixões Cruise Terminal Cutter Soil Mixing Solutions at the Leixões Cruise TerminalBy Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio "The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam Jan 1, 2015 
- 
                     Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CA Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CABy Eric Lindquist, John Compagnone, Gabriel Carvajal "Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq Jan 1, 2017 
- 
                     Solving Variable Bedrock Challenges With Ductile Iron Piles Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si Oct 1, 2022 
- 
                     Value-Engineering of H-Pile Foundations in Karstic Geology Value-Engineering of H-Pile Foundations in Karstic GeologyBy Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman "A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert Jan 1, 2016 
- 
                     A Digital Twin For Deep Vibro Ground Improvement A Digital Twin For Deep Vibro Ground ImprovementBy Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit May 1, 2022 
- 
                     Full Waveform Inversion of Cross-Hole Stress Waves for Structural Integrity Testing of Drilled Shafts Full Waveform Inversion of Cross-Hole Stress Waves for Structural Integrity Testing of Drilled ShaftsBy Joseph T. Coe, Alireza Kordjazi, Michael Afanasiev Cross-hole sonic logging (CSL) is a common quality assurance measure for the evaluation of the structural integrity of drilled shafts. The results of CSL can be supplemented by a set of tomographic im Jan 1, 2019 
- 
                     Soil-Mix-Sandwich (SMS) Soil-Mix-Sandwich (SMS)By Ali S. Fayad "In June 2014, Orange County Flood Control District (OCFCD) completed construction improvements of the East Garden Grove-Wintersburg Channel for a price of $42 million. Instead of the pre-existing tra Jan 1, 2015 
- 
                     Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface Challenges Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface ChallengesBy Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue Jan 1, 2019 
- 
                     Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike Rehabilitation Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike RehabilitationBy Michael Arnold "BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d Jan 1, 2015 
- 
                     Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support Columns Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support ColumnsBy Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury "The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb Jan 1, 2016 
- 
                     Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load Testing Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load TestingBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l Sep 8, 2021 
- 
                     Drilled Displacement Piles in the Northeastern United States Drilled Displacement Piles in the Northeastern United StatesBy Jr NeSmith "Drilled Displacement piles are a product of screw pile technology originally developed in Europe. The process involves rotating tool into the ground that displaces the soil laterally as it advances, Jan 1, 2016 
- 
                     Versatility of Compaction Grouting to Stabilize and Lift Large Structures Versatility of Compaction Grouting to Stabilize and Lift Large StructuresBy Joe Harris Large structures, such as a multistory office building or a large storage tank, are constructed the most economical way possible, which may involve a shallow foundation system placed on native soil or Sep 1, 2023 