    The Application Of Magnet Assessment To Ironsands Production

    By Falconer A. J

    Two magnetic parameters are proposed as a basis for the assessment of ironsands beneficiation. The parameters are deter- mined for raw sand prior to dredging and for magnetic separator head feed ove

    Jan 1, 1980

  • AUSIMM
    The Contribution of Geology to Achieving Mining Performance at Hilton Mine

    By Dennis B

    The Hilton Mine, 20 km north of Mount Isa was discovered in 1947. The underground mine has been a significant producer from 1989. The long development history is the result of complex orebody geometry

    Jan 1, 1993

  • AUSIMM
    Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited

    By Slater R

    The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The

    Jan 1, 1982

  • AUSIMM
    Evaluation of Quality Parameters for Assessment of Steaming Coal Utilisation

    By Dyne GD

    From experience in the design and operation of power station combustion facilities in most mainland Australian States, involving a wide range of black coals and lignites, and in the specification

    Jan 1, 1983

  • AUSIMM
    Blast Vibration Control by Wavefront Reinforcement Techniques

    By Moore A. J

    This paper describes the use of a wavefront reinforcement model which has been developed to supplement established charge mass scaling methods. The model allows for the time taken for blast vibratio

    Jan 1, 1995

  • AUSIMM
    Keynote Address A Review of Instantaneous Outburst Data

    The problem of instantaneous outbursts remains unsolved after over a century of events and the investigation of the mechanism of the phenomenon and means of treating it. Outbursts have occurred of

    Jan 1, 1980

  • AUSIMM
    Post-Permian Subsidence and Tectonics, Vulcan Sub-Basin, North West Shelf, Australia

    Tectonic subsidence plots have been calculated for well, extrapolated-well and significant off-well (seismically-based) locations in the Vulcan Sub-basin and adjacent highs (western Timor Sea). The su

    Jan 1, 1990

  • AUSIMM
    Methane-INFO - Graphical, Three-Dimensional Planning and Information System for the Simulation and Prediction of the Methane Emission of Mine Design

    By Ruschitzka C

    The productivity and economic success of a German hard coal mine is attributed to the high productivity of a small number of operation points; however high rates of production are associated with in

    Jan 1, 1995

  • AUSIMM
    Post Pillar Cut and Fill Stoping at the Dolphin Mine of King Island Scheelite

    By Bedford D. J

    The post pillar cut and fill stoping method has been adopted by King Island Scheelite for the extraction of the main Dolphin orebody. The orebody is a massive, tabular deposit varying from 10 to 50

    Jan 1, 1977

  • AUSIMM
    Analysis of Haul Truck Tyre Costs in a Multiple Pit Surface coal Mine

    By Cox LT

    A short term tyre study of trucks operating in a multiple pit surface coal mine showed significant potential for cost savings. The tyre study, conducted on-site over a three months period covered a

    Jan 1, 1982

  • AUSIMM
    Recovery of zinc from sulphide flotation tailings

    By Kelley BC, Filmer AO

    The chemical oxidation kinetics of sphalerite by Fe(III) was studied at various temperatures and size fractions in sulphate media. The kinetics of Zn extraction followed a pore diffusion control m

    Jan 1, 1986

  • AUSIMM
    Field Studies of Semi-Passive Biogeochemical Treatment of Acid Rock Drainage at the Island Copper Mine Pit Lake

    By M Wen, J Gerit, C A. Pelletier, D Muggli

    On-land waste rock dumps at BHP Billiton Base MetalsÆ Island Copper Mine (ICM) near the northern end of Vancouver Island, B.C. continue to discharge ARD. These waters, which amount to approximately fi

    Jan 1, 2003

  • AUSIMM
    Application of Geostatistics to Construct a Coal Quality Model

    By Gillies A. D S, Just G. D

    Coal washability data can be used for assessing coal quality. However, the techniques of using these data to solve quality problems differ from one mine to another and certain problems may never reall

    Jan 1, 1992

  • AUSIMM
    Aspects of Alluvial Gold Exploration

    Alluvial gold exploration is aimed at recognizing areas of anomalous gold content as evidenced by the nature of the drainage system, its age, geomorphic history and other features of the geological en

    Jan 1, 1984

  • AUSIMM
    Modern Technology in Large Blasthole Drill Design, the Tamrock R110

    The large rotary blast hole drills for hole sizes of 250 to 375 mm in diameter have been utilized by large open pit metal and coal mines for production drilling all over the world. The design of suc

    Jan 1, 1989

  • AUSIMM
    Education needs for Research and Industrial Practice in Geological Engineering

    Geological. engineering is a field of engineering practice concerned with design and construction of excavations and structures in soil and rock masses. The role of geological engineering in mining

    Jan 1, 1986

  • AUSIMM
    Environmental Management of Sulphidic Waste Rock at Mt Lyell, Tasmania

    By Stanley I. M, Brett D, Dickson R

    The Mt Lyell Mine, situated in Queenstown on the west coast of Tasmania, has a production history of more than 100 years. Previous mining activities have resulted in substantial modifications to en

    Jan 1, 1997

  • AUSIMM
    Mining Reserves Using a Mini Computer

    By Crosby N. R

    The design of mine openings and the assessment of their reserve are processes ihicl, require the routine manipulation of considerable amounts of data. A number of computer programs have been assemb

    Jan 1, 1977

  • AUSIMM
    The Cementation of Metals from Dilute Aqueous Solution

    By Lawson F

    A rotating disc geometry has been used to provide a uniformly accessible surface for a kinetic study of the cementation of the metals cadmium, lead and silver from dilute aqueous solutions. This work

    Jan 1, 1970

  • AUSIMM
    Optimisation of Blasting in a Large Open Pit Mine

    By Miles M. J, Sandy D. A

    It has long been known that drilling and blasting operations have a direct influence over productivity and costs of subsequent operations. If mine management is to effectively optimise blasting oper