Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Proactive Measures for Fatality Prevention in the Mining Industry ù Why Fatalities Persist While Lost Time Injuries Decline

    The traditional measure of Lost Time Injury Frequency Rate (LTIFR) as a measure of improvement in safety performance is recognised as inadequate and misleading, lulling managers into believing that sa

    Jan 1, 2003

  • AUSIMM
    Public Perception and Development of a Minerals Industry - An Australian Perspective

    Perception has the unfortunate habit of becoming reality. Urban inhabitants unfortunately do not regard mining as a legitimate or desirable business, despite its contribution to Australia's expor

    Jan 1, 1997

  • AUSIMM
    Advanced automation for centralised stockyard operations

    By R Stefansen

    Stockyard operations are governed by the interaction between the different disciplines required to successfully schedule and control the supply chain of raw material through the stockyard in combinati

    Jul 24, 2017

  • AUSIMM
    BATMIN - Business Analysis Tools for Mining

    BATMINÖ, BATMINEÖ, BATMINDÖ are an abbreviation for Business Analysis Tools for Mining, Mine Evaluation and Mine Design respectively. BATMINP are proprietary tools customised to suit individual clien

    Dec 6, 2010

  • AUSIMM
    Mining Practices and their Effect on Mobile Equipment Costs

    By R Lethlean

    The mining industry in its drive to optimise equipment use and minimise cost simply to remain profitable in an uncertain commodity market needs to develop a greater understanding of equipment capabili

    Jan 1, 1998

  • AUSIMM
    Mining Innovation State of PlayTM – iron ore insights

    By G Stanway, P Mahoney, C Griebel

    The Mining Innovation – State of Play was initiated three years ago by VCI in partnership with the University of Western Australia. The ambition was to create a ‘think tank’ type platform to support i

    Jul 24, 2017

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • AUSIMM
    Pyroclastic Flow Deposits, East Zhejiang, Southeast China: Their Characteristics and a Petrogenetic Model

    A geologic, petrographic and geochemical study has been performed on the pyroclastic flow deposits in the coastal area of East

    Jan 1, 1995

  • AUSIMM
    Size Patterns of Gold-Silver Deposits in the Hauraki Goldfield, Coromandel Peninsula

    This paper presents an analysis of the production data for the period 1861 - 1953 from hydrothermal gold-silver deposits of the Hauraki Goldfield. To directly compare the metal content of the deposits

    Jan 1, 1981

  • AUSIMM
    Oxygen and Hydrogen Isotope Study of Veins in the Hishikari Epithermal Deposit, Japan: Origin of Ore-Forming Fluids

    Quartz, adularia and clay minerals from low-sulfidation epithermal veins at Hishikari were analyzed for their oxygen and hydrogen stable isotope compositions to establish the source of paleohydrotherm

    Jan 1, 2001

  • AUSIMM
    Bacterial Leaching of Complex Polymetallic Sulfide Ore

    Bacterial Leaching of Complex Polymetallic Sulfide Ore The work described here concerned the study on bacterial leaching of complex sulfide minerals and polymetallic ores operated in shaken flasks an

    Sep 13, 2010

  • AUSIMM
    Automated Train Ore Transport

    By J Fisher, M Castro, A Hariyadi

    The train haulage system being designed for PT Freeport Indonesia’s Grasberg Block Cave (GBC) will be located within the mine at an elevation of almost 3000 m above sea level on the west side of the i

    May 9, 2016

  • AUSIMM
    Gas reservoir and emission modelling to evaluate gas drainage to control tailgate gas concentration and fugitive emissions

    By D J. Black

    The process of longwall coal extraction coal causes fractures in the overlying and underlying strata and these fractures become pathways for gas released from adjacent coal seams to flow into the mine

    Aug 28, 2017

  • AUSIMM
    Phosphorus Phase Analysis of Medium-Low-Grade Rare-Earths-Bearing Phosphate Ores

    Phosphorus Phase Analysis of Medium-Low-Grade Rare-Earths-Bearing Phosphate Ores

    Sep 13, 2010

  • AUSIMM
    Draw Parameters and Reserve Estimation using PC-BC at the E26 Block Cave Mine, Northparkes NSW

    By Secis R

    Northparkes Mines is located 27 km northwest of Parkes in central west New South Wales. The E26 deposit is the largest of all defined to-date in the area, containing over 50 per cent of Northparkes&

    Jan 1, 1997

  • AUSIMM
    Development of the Boleo Process Flow Sheet and the Direct Solvent Extraction (DSX) Circuit for Cobalt and Zinc Recovery

    Development of the Boleo Process Flow Sheet and the Direct Solvent Extraction (DSX) Circuit for Cobalt and Zinc Recovery The metallurgical process designed to treat the El Boleo Cu-Co-Zn-Mn ore invol

    Sep 13, 2010

  • AUSIMM
    The Application of Earthmoving Equipment Technology

    Technologies are receiving a lot of 'press' - and rightly so; as they are seen as the means for achieving quantum leaps in productivity and cost reductions. A point of concern for Caterpilla

    Jan 1, 1997

  • AUSIMM
    Investigation on Multicomponent Semi-Autogenous Grinding

    Investigation on Multicomponent Semi-Autogenous Grinding

    Sep 13, 2010

  • AUSIMM
    Combined Flow Sheet for Treatment and Recycling of Municipal Solid Waste (MSW) with Complex Morphological Composition

    Combined Flow Sheet for Treatment and Recycling of Municipal Solid Waste (MSW) with Complex Morphological Composition

    Sep 13, 2010

  • AUSIMM
    Quality Control Procedures in a Large Iron Ore Open Pit

    By K Firmin

    The Mt Tom Price orebody of Hamersley Iron Pty Limited consists of a folded hematite - shale sequence capped by a layer of goethite. Consequently, variations in iron content occur within the ore body,

    Jan 1, 1971