Search Documents

Sort by

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Rope Shovel Collision Avoidance System

    By Himmelman. Nicholas P.

    In this paper, the hardware foundations and data collection methods of a real time collision avoidance system for electric surface mining rope shovels are described. The primary goal of the system is

    Oct 1, 2009

  • CIM
    Graphical-Analytical Model of the Generation of Methods and Variants of Methods of Digging, respectively of the Technologies and Technological Variants of the Execution of the Underground Mining Work

    By Nicolae Dobritoiu

    The literature in this field and the practical activity record that a method, respectively the technology used for an underground mining work have many components which, in order to be applied, demand

    Oct 1, 2009

  • CIM
    Use of the IREDES Standard For Real-Time Information Exchange in Mining Process Optimization

    By Christoph Müller

    Information exchange for mine process optimization is essential. Today, modern mining equipment uses the IREDES standard to exchange production plans and reports for easy management and storage. To ga

    Oct 1, 2009

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    The Management of the Development Process of the Structure of Large-Scale Production and Transportation Systems

    By Buse Florian

    This paper presents the specific features of the large-scale production and transportation systems (LSPTS), describing the main notions and characteristics of the LSPTS elements. A methodologically un

    Oct 1, 2009

  • CIM
    Automated Real-Time Elementary Analysis of Drill Dust using LIBS Technology

    By Karl Nienhaus

    The BGMR has developed a method for an online-analysis during drilling processes in cooperation with Fraunhofer Institute for Laser Technology in Aachen and various industrial partners. This allows fo

    Oct 1, 2009

  • CIM
    Applying Simulated Annealing to Practical Mining Phase Design

    By Meimei Zhang

    In the overall open pit mine planning process, mining phase design is a strategic driver in guiding and constructing the block extraction sequence and determining the annual net cash flow distribution

    Oct 1, 2009

  • CIM
    Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface Layers

    By Martin Kesting

    The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco

    Oct 1, 2009

  • CIM
    Comparison of Artificial Neural Networks and a Geostatistical Method in Grade Estimation

    By Hamid Mahmoudabadi

    In the present paper, the performance of four approaches based on neural networks and geostatistical method for grade estimation are compared and analyzed their performance to find a proper method. Fo

    Oct 1, 2009

  • CIM
    A Simulation Model For Underground Roadway Development Processes

    By Ernest Baafi

    A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr

    Oct 1, 2009

  • CIM
    Cut off Grade Optimizer Integrating Contaminant Constraints

    By Sebastián H. Troncoso

    Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block

    Oct 1, 2009

  • CIM
    Drill Rig Navigation and Drill Plan Creation using IREDES

    By André van Wageningen

    Since the beginning of this century Boliden Mineral and Atlas Copco have worked together in stages on improving the accuracy and quality of drilling. Navigation of the drill rigs with IREDES has been

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    Using High Performance 2D Radar for Mine Equipment Automation and Obstacle Detection

    By Reik M. Winkel

    Radar Technologies are successful implemented in the military industry since decades and recently found their way in the mining industry as level gauge radars for bin applications. The latest generati

    Oct 1, 2009

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The

    Oct 1, 2009

  • CIM
    A Parametric Model for Evaluating the Impact of Mine Mill Integration Approaches on Resource Economics

    By Andrew Bamber

    A fast and objective spreadsheet-based model for the financial evaluation of innovative mining and processing strategies such as pre-concentration vs. a conventional base case is presented. The size a

    Oct 1, 2009

  • IIMP
    Optimización y predicción de la fragmentación, en base a la exactitud de tiempos en el diseño de voladura: mina Toquepala

    By Omar Manfredo Herrera Terrazas

    La voladura de rocas es una de las operaciones más relevantes dentro del proceso extractivo de minerales, cuyo objetivo es lograr un tamaño adecuado de roca, con un mínimo de daño en su entorno. Sin e

    Sep 14, 2009