  • CIM
    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004

  • AUSIMM
    Large Excavations in Weak Mudstone for the Porgera Mine Plant Development

    The plant and processing site at Porgera has been built on a levelled mudstone ridge about lkm E of the mine. Excavation of 7xl06m3 of soil and rock was necessary to achieve the required area. The

    Jan 1, 1991

  • NIOSH
    OFR-125-77 High Speed Projectile Impact For Mining And Tunneling--Project Ream ? Section 1 ? Introduction

    By John D. Watson

    The results of extensive field tests of a new and powerful method of hard rock excavation are presented in this report.* The method, known by the acronym REAM (Rapid Excavation and Mining), employs hi

    Jan 1, 1974

  • SAIMM
    The Influence Of Alkalis On The Boudouard Reaction

    By H. B. Arntzen, P. O. Grøntvedt, T. Lindstad, R. J. Ishak, M. Syvertsen

    Better utilisation of electric power and coke is vital in reducing production costs and CO2-emissions in production of ferromanganese. All FeMn smelting operations consume 10 to 30 % more carbon than

    Jan 1, 2004

  • SAIMM
    Time-space effect and principle of variation loading analyses and application cases

    By W. Zhu

    ABSTRACT: This paper presents further developments of the principle of Construction Process Mechanics of rockmasses, The principle of loading variations analyses in space-time is systematically descri

    Jan 1, 2003

  • CIM
    Taxation of a Canadian Gold Mining Company

    By E. D. Fox

    Introduction The financial statement of the hypothetical Gold Mining Company, which forms the background of this survey, was designed for the Institute with the express abject of having it assessed i

    Jan 1, 1934

  • NIOSH
    RI 5284 Leadville Drainage Tunnel Second Project Lake County, Colo. - Summary

    By M. H. Salsbury

    This report describes the tunneling at the Leadville drainage tunnel, which was resumed in September 1950 with funds made available in the 1950 appropriation of the Department of the Interior. It brin

    Jan 1, 1956

  • NIOSH
    OFR-97(1)-77 Development Of A Conveyor-Type Cross Pit Overburden And Material Handling System - Revision -1

    By L. J. Defferding

    This report documents the work performed by Battelle-Northwest and its sub-contractors in Phase I of a project to develop a cross pit conveyor system for the Bureau of Mines. The conveyor system des

    Jan 1, 1976

  • AUSIMM
    The Discovery of the Nam San Copper-gold Deposit, Phu Kham, Laos

    By K J. F Logan, P W. Leaman, B A. Tucker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Nam San copper-gold deposit was discovered in 2011 and is a likely blind extension of t

    Mar 18, 2015

  • AUSIMM
    Maximising the Operational Benefit of Capital Investment Via Computer Simulation

    In the minerals industry allocating capital for setting up a new project or for upgrading an existing facility usually requires that a compromise be found between the initial cost of equipment, its

    Jan 1, 1990

  • NIOSH
    Remote Monitoring of Mine Seismicity and Earthquakes Using Radio Telemetry, Computers, and the Internet

    By D. Denton, M. Stickney, R. Langston

    The National Institute for Occupational Safety and Health and the Stillwater Mining Company worked cooperatively with the Montana Bureau of Mines and Geology to develop a system that would collect sei

  • CIM
    Mill Liner Bolt Removal System

    By Michel Fontaine, Bruno St-Cyr

    "The mission of the CENTRE DE RECHERCHE INDUSTRIELLE DU QUEBEC (CRIQ) is to stimulate economic development by guiding businesses in their pursuit of innovation.With a comprehensive approach to their n

    Jan 1, 2000

  • SME
    Designing Wetland Treatments Systems For Long Term Treatment Of Mine Drainage - An Impossible Dream?

    By Paul Eger

    The use of wetlands to treat mine drainage has become increasingly common, particularly as more information is available on their operation and construction. However, the lifetime of each system is s

    Jan 1, 2005

  • NIOSH
    Lessons From The Granite Mountain Shaft Fire, Butte. - Introduction.

    By Daniel Harrington

    On the night of June 8, 1917, the flame of a carbide lamp accidentally set fire to the uncovered and frayed insulation of an armored power cable near the 2,400-foot level of the North Butte Mining Co.

    Jan 1, 1922

  • NIOSH
    IC 8495 Financial Evaluation Of Mineral Deposits Using Sensitivity And Probabilistic Analysis Methods

    By Harold J. Bennett

    The purpose of this study was to develop methods for the financial evaluation of mineral deposits. This includes the selection of the best alternative mining and processing methods and production rate

    Jan 1, 1970

  • AUSIMM
    Automation for efficient separation with the Outotec SLon® vertically pulsating high gradient magnetic separator

    By I Sherrell, R Jain, P Jansson

    With the depleting iron reserves and difficult market conditions, precision in separation efficiency is of utmost importance. Classical local control options are predominant in the industry, but their

    Jul 24, 2017

  • AUSIMM
    The Regional Controls Exerted on Rock Discontinuities at the Iron Duke Deposit, South Australia and Extrapolation Throughout the Rock Mass

    Analysis of rock discontinuities, collected using a scanline method, has been undertaken at the Iron Duke open cut mine, on the southern margin of the Middleback Range in the Gawler Craton, South Aust

    Jan 1, 2000

  • SME
    Water Treatment at Homestake’s Bulldog Mountain Operation

    By Joseph L. Young, Richard A. Bohling

    To keep Homestake's Bulldog Mountain silver and lead mining and milling operation in southwestern Colorado workable, natural ground water and decant water from the mine's sand backfilling op

    Jan 12, 1981

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • SME
    Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon Mine

    By I. Demers

    Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were

    Jan 1, 2008