Case Study of Roof Behaviour and Conditions for Longwall Face Recoveries at Beltana No. 1 Mine, AustraliaBy David Hill
Over the last decade, Beltana No.1 Mine has generally been Australia?s most productive longwall operation, with a ROM output of 7.2 Mt in YEJ2007. Characteristically favorable roof conditions and low
Jan 1, 2011
-
Case Study Of Stability Investigations Related To Shallow Underground Mining Of Iron Ore In The United KingdomBy S. F. Smith
Following a roof beam collapse on a major production district at the British Steel Corporation's Dragonby Iron Ore Mine, Scunthorpe, South Humberside, UK, rock mechanics investigations were under
Jan 1, 1995
-
Case Study of the Barro Branco Coal Mine Pillar BurstBy Fernando O. L. Xavier
"The Barro Branco coal mine was located in the southern region of Brazil, in the state of Santa Catarina. In 2002, an incident occurred at the mine, leading to a violent, massive pillar failure, resul
Jan 1, 2017
-
Case Study Of The Conda Partnership's Dry Valley Phosphate Mining Project ? IntroductionBy Mark A. Krall
The Conda Partnership's Dry Valley Phosphate mine is a thinly bedded, multiple seam, open pit mining operation where selective mining techniques are used to recover phosphatic shales. The mining
Jan 1, 1984
-
Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock SaltBy Chris T. Franke
The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation
Jan 1, 1997
-
Case Study Of The Rockpass System At Kloof No. 3 ShaftBy R. Hart
In this paper, problems that have been experienced with the rockpass system at Kloof Mine No. 3 Shaft are described. Actions that have been taken to overcome the problems are also described. These inc
Jan 1, 2006
-
Case Study of Thickened Tailings at Goldcorp’s Musselwhite Mine in Northern OntarioBy Jérôme Girard, Shiu Kam, Sue Longo
"Historically, tailings management in a northern climate has involved the deposition of tailings into the Tailings Management Area (TMA) as conventional slurry. This type of system is obviously viable
Jan 1, 2011
-
Case Study Of Three Bidirectional Static Load Tests For Bored Piles At Sabana Costa RicaBy Mauricio Coto
Three bidirectional static load tests (BDSLT) were executed on bored concrete piles, as part of the permanent foundations for two buildings sites located at the Sabana, San Jose, Costa Rica, separated
-
Case Study on Application of Advanced Flotation Simulation to Determine Optimum Reagent DosageBy Chris A. Bennett, Glenn S. Dobby, David A. Bulled
Establishing reagent dosing strategies for new ore bodies has traditionally involved a combination of experience and empirical experimentation using standard laboratory tests. The grade and recovery d
Jan 1, 2003
-
Case Study on Application of Cohesive Fracture in Cuttings Reinjection in West AfricaBy W. Standifird
"Cohesive fracture is a mechanical model widely used for modeling quasi-brittle fracture in rocklike materials. This work discusses use of this model to simulate quasi-brittle fractures generated by i
Jan 1, 2015
-
Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz
Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met
Jun 13, 2021
-
Case Study On Quantitative Risk Modelling To Obtain A Realistic Risk-Adjusted Project ValuationBy G. R. Lane
A large opencast gold mining company in Africa had just completed a feasibility study for the expansion of the operations. A traditional net present value project valuation methodology had been used t
Jan 1, 2012
-
Case Study On Quantitative Risk Modelling To Obtain A Realistic Risk-Adjusted Project Valuation ? SynopsisBy G. R. Lane
A large opencast gold mining company in Africa had just completed a feasibility study for an expansion of the operations. A traditional net present value project valuation methodology had been used th
Jan 1, 2013
-
Case Study on the Application of Research to Operations—Calcium Ferrite SlagsBy Stanko Nikolic
The Top Submerged Lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. TSL technology for continuous converting was first patented in the 1990
-
Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DCBy Karl A. Higgins, Michael D. Venezia
The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o
Jan 1, 2019
-
Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit AssessmentsBy N Swiegelaar
Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen
Jan 1, 2003
-
Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit PumpBy Stuart Brashear, Steven Bell, Donald Smith
This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede
Jan 21, 2025
-
Case Study ù Final Closure Water Balance of a Tailings Impoundment Using Direct VegetationBy N Currey, G W. Wilson, P Ritchie
Kidston Gold Mine in Queensland, Australia has a 310 ha tailings impoundment that has undergone final closure rehabilitation. Kidston Gold Mine evaluated their closure options for this low acid genera
Jan 1, 2003
-
Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologiesBy M J. Shearer
An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume
Aug 28, 2017
-
Case Study – Application of RISKGATE to Managing Strata Failure in an Australian CoalmineBy J Harris, J Turner, P Kirsch
Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment
Nov 5, 2014